Loading...
HomeMy WebLinkAbout20201377 Ver 1_PCN - Restoration Work Impacts Map_20210701Project Parcels Project Area Dacian Ave Right -Of -Way Buffer Zone 1 Impact Buffer Zone 2 Impact .1111 WILDLANDS ENGINEERING Existing Wetlands Wetland Impact - Permanent Stream Impact - Permanent Stream Impact - Temporary Stream Impact Break Stream Impact S4 - 16 LF Temporary Stream Impacts S3 - 25 LF & S6 - 8 LF Temporary Buffer Impact B6 - 873 SQFT Temporary Stream Impact S5 - 16 LF Permanent Buffer Impact B5 - 475 SQFT Temporary Stream Impact S2 - 892 LF Permanent Stream Impact S1 - 35 LF Permanent 0 150 Feet Buffer Impact B4 - 28,598 SQFT Temporary Buffer Impact B3 - 42,141 SQFT Temporary Stream Impact S8 - 163 LF Permanent Wetland A UT2, Perennial Wetland Impact W2 - 0.01 AC Perma nent NO channel or baseflow. / UT2' Intermittent Stream Impact S7 - 142 LF Permanent Wetland Impact W3 - <0.00 AC Permanent Wetland Impact W4 - 0.05 AC Permanent Wetland B Restoration Work Impact Map South Ellerbe Restoration City of Durham, NC