Loading...
HomeMy WebLinkAbout20120211 Ver 1_Con SW inspection_20130524Wetland Inspection Report SW Plan Location: Longitude:Latitude: NCDOT- Greensboro-High Point Road Location: Issued Status:1 Version: Road maintenance/repair/improvements Project Type:NCDOT- Greensboro-High Point Road Project Name: NC DOT PDEA Site Owner Name: Project Num:20120211 County:Guilford Winston-Salem Region: Inspection Date:05/24/2013 Reason for Inspection: Inspection Type:Site Inspection (DOT) Routine Phone:Inspection Contact Person:Title: On-Site Representative(s): Facility compliance Status:Compliant Not Compliant Amy C Euliss Primary Inspector: Secondary Inspector(s): Phone: NCG010000 Permit Program Area:Construction SW (NCG010000) Question Areas: Inspection Summary: 1 Page: 20120211 NC DOT PDEA Site Inspection (DOT)05/24/2013 Routine Inspection Type: Project Num: Inspection Date:Reason for Visit: Owner: Yes No NA NE NCG010000 Permit # Is this inspection related to a DLR/delegated program inspection? If Yes, what was the DLR/delegated program inspection date? Is the site following its E&SC Plan as per DLR or delegated program? Is the site maintaining their E&SC measures as per DLR or delegated program? Is a copy of the approved E&SC plan on site? Is a rain gauge present on-site or is MPE in use for the site? Is rain gauge data or MPE data recorded? Are inspection records complete? Is the site compliant with other conditions of the NCG010000 permit? Comment: Records were in great shape. Having issues with turbidity at sites 1 and 4. Site 1 drains to wetland (old pond) then into sedgefield lake. the lake is connected to the wetland by a small pipe and a small overflow. turbidity seen entering lake. DOT measures draining to pond are in compiance, and additional measures have been installed. Pam is also being added to the measures. DOT is pursuing a turbidity curtain in the lake where the pipe and the overflow drain to the lake. Soil type often results in fines staying suspended for long periods of time. Site 4 is experiencing the same turbidity. Currently there's an additional rock check that has been installed at the pipe outlet, but turbidity is noted leaving the measure. Requested that the put fabric in front of the check and apply pam. Also if turbity is still noted, install wattle in stream below the check. Noted a skim of silt in the channel bed downstream of the pipe that continues atleast until the next road crossing. 2 Page: