Loading...
HomeMy WebLinkAbout20120211 Ver 1_Buf inspection_20130524Wetland Inspection Report SW Plan Location: Longitude:Latitude: NCDOT- Greensboro-High Point Road Location: Issued Status:1 Version: Road maintenance/repair/improvements Project Type:NCDOT- Greensboro-High Point Road Project Name: NC DOT PDEA Site Owner Name: Project Num:20120211 County:Guilford Winston-Salem Region: Inspection Date:05/24/2013 Reason for Inspection: Inspection Type:Site Inspection (DOT) Routine Phone:Inspection Contact Person:Title: On-Site Representative(s): Facility compliance Status:Compliant Not Compliant Amy C Euliss Primary Inspector: Secondary Inspector(s): Phone: Buffer/Authorization/Variance Conditions Program Area:Buffer/Authorization/Variance Question Areas: Inspection Summary: Yes No NA NE Buffer/Authorization/Variance Conditions Does the impact(s) match what was approved in the buffer authorization or variance? Is the site compliant with other conditions of the buffer authorization or variance? Comment: 1 Page: