Loading...
HomeMy WebLinkAbout20120211 Ver 1_401 inspection_20130524Wetland Inspection Report SW Plan Location: Longitude:Latitude: NCDOT- Greensboro-High Point Road Location: Issued Status:1 Version: Road maintenance/repair/improvements Project Type:NCDOT- Greensboro-High Point Road Project Name: NC DOT PDEA Site Owner Name: Project Num:20120211 County:Guilford Winston-Salem Region: Inspection Date:05/24/2013 Reason for Inspection: Inspection Type:Site Inspection (DOT) Routine Phone:Inspection Contact Person:Title: On-Site Representative(s): Facility compliance Status:Compliant Not Compliant Amy C Euliss Primary Inspector: Secondary Inspector(s): Phone: Permit (401 WQC) Program Area:401 (includes isolated/non-404) Question Areas: Inspection Summary: 1 Page: 20120211 NC DOT PDEA Site Inspection (DOT)05/24/2013 Routine Inspection Type: Project Num: Inspection Date:Reason for Visit: Owner: Yes No NA NE Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Stream overwidened at inlet of site 1 and 4. Directed them to install class B to narrow channel. Site 4 has developed a headcut will need to install cross vein(s) after they determine drop between head cut and inlet. Will provide detail. Requested plan sheet showing cross vein. Site 2 inlet installed, outlet under construction (didn't see). Site 3, no work started. 2 Page: