HomeMy WebLinkAbout20120211 Ver 1_401 inspection_20130524Wetland Inspection Report
SW Plan Location:
Longitude:Latitude:
NCDOT- Greensboro-High Point Road Location:
Issued Status:1 Version:
Road maintenance/repair/improvements Project Type:NCDOT- Greensboro-High Point Road Project Name:
NC DOT PDEA Site Owner Name:
Project Num:20120211
County:Guilford Winston-Salem Region:
Inspection Date:05/24/2013
Reason for Inspection:
Inspection Type:Site Inspection (DOT)
Routine
Phone:Inspection Contact Person:Title:
On-Site Representative(s):
Facility compliance Status:Compliant Not Compliant
Amy C Euliss Primary Inspector:
Secondary Inspector(s):
Phone:
Permit (401 WQC)
Program Area:401 (includes isolated/non-404)
Question Areas:
Inspection Summary:
1 Page:
20120211 NC DOT PDEA
Site Inspection (DOT)05/24/2013 Routine Inspection Type:
Project Num:
Inspection Date:Reason for Visit:
Owner:
Yes No NA NE Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: Stream overwidened at inlet of site 1 and 4. Directed them to install class
B to narrow channel. Site 4 has developed a headcut will need to install cross vein(s)
after they determine drop between head cut and inlet. Will provide detail. Requested
plan sheet showing cross vein. Site 2 inlet installed, outlet under construction (didn't
see). Site 3, no work started.
2 Page: