HomeMy WebLinkAboutGW1-2021-00209_Well Construction - GW1_20210623 �wn
WELL CONSTRUCTION RE •RD ,
NORTH CAROLINA
EnWronmental Quullty
•rm GW1 Well Constructon Electronic •
NorthCarolina Department of •
Di\Asion
April 1,2021
Page 1
Submission ID#
GW 1-2021-00209
CONTACT INFORMATION
..................................................................................................................................... ................................................. ...................
Contact Name* Email Address*
Felton Jacobs Felton@Upfrontwells.com
Is this a revision to the form you have previously submitted?
f Yes r No
WELL CONSTRUCTION INFORMATION
.........................................................................................................................................................................................
1.Who is installing these wells?*
r Owner r Well Contractor
1.Well Contractor Information:
Certiticate# Cert Level First Name Last Name Company Name
2765 A FELTON JACOBS Upfront Well Company Of The Carolinas
2.Well Construction Permit#:
W20-0239
List all applicable well construction permits(i.e.Ivbnitoring Wells,UIC,County,CCPCUA etc.)
What type of well is this?* r Injection Well r Non-Water Supply Well
r Water Supply Well(includes irrigation wells)
3.Water Supply Well* r Geothermal(Heating/Cooling Supply) r Industrial/Commercial
r Irrigation r Municipal/Public/Community
r Residential Water Supply(single) r Residential Water Supply(shared)
r Wells>100,000 GPD
4. Date well was completed and ID#
Date Well Completed* Well ID# Well Yield
6/23/2021 30
(gallons per minute)"
Page 2
5.Well Location
Facility/Owne r Name*
J Fuller Homes Facility ID#
(Required) (If applicable)
County* Parcel Identification No.(PIN)
Orange
Physical Address* Street Address
8301 Union Grove Church Road
Address Line 2
City State/Province/Region
Chapel Hill NC
Postal/ZZp Code Country
27516 US
Latitude* 35.9536091000 Longitude*-79.1230617000
Decimal degrees Decimal degrees
6. Is(are)the well(s):* r Permanent r Temporary
7. Is this a repair to an existing well:* r Yes r No
If this is a repair,fill out known well construction information and a)plain the nature of the
repair under#21 remarks section or on the back of this form.
For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed.
8a. Indicate TOTAL NUMBER of wells drilled: 1
9.Total well depth below land surface:(ft.) 9a.What is the depth of the casing from ground
204 surface?
For multiple wells Iistall depths if different 63
(example-3 a200'and 2@100') in feet
10.Static water level below top of casing:(ft.) 11. Borehole diameter:
20 6
If water level is above casing,use"+" in inches
12.Well construction method:
r Auger r Air Rotary r Cable Tool
r Direct Push r Mud Rotary r Rotosonic
r Other
13. FOR WATER SUPPLY WELLS ONLY:
13a.Yield (gpm)
30 13a. Method of test:
If applicable Blow
13b. Disinfection type:* 13b.Amount:*
HTH 1 LB
Page 3
14.WATER BEARING/FRACTURE ZONES
From To Description
180 185 30 GPM
in feet in feet
15.OUTER CASING(for multi-cased wells)OR LINER(if applicable)
From To Diameter Thickness Material
1.00 62.00 6.00 .188 Galvanized
in feet in feet in inches
17.SCREEN
From To Diameter Thickness Material
in feet in feet in inches
18.GROUT
From To Material Emplacment Method &Amount
0.00 20.00 Hole Plug Poured
in feet in feet
19.SAND/GRAVEL PACK(if applicable)
From To Material Emplacment Method
in feet in feet
20.DRILLING LOG
From To Description (color, hardness,soil/rock type,grain size,etc.)
0.00 3.00 Top Soil
in feet in feet
3.00 20.00 Clay
in feet in feet
20.00 205.00 Granite
in feet in feet
21.Remarks
Hardened Steel Drive Shoe
22.Site diagram or additional well details:
You mayupload additional well construction information here.
pdf only
*PF By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C
.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to
the well owner.
23.Certification*
"A(J-A--e '.5
Signature of Certified Well Contractor
Submittal Date 6/23/2021