HomeMy WebLinkAboutNCC213348_ESC Approval Submitted_202106231
City of
onroe
Engineering
May 19, 2021
Pulte Home Company, LLC
C/O Jeremy Huntsman
11121 Carmel Commons Blvd, Suite 450
Charlotte, NC 28226
RE: LETTER OF APPROVAL
300 W Crowell Street, Monroe, NC 28112
monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1
EROSION AND SEDIMENT CONTROL SUBMITTAL
Project Name: Founders Point
Submittal No.: PR21201085
Disturbed Area: 29.92 Acres
Location: 3868 W. Highway 74
Submitted by: Matt Reiking, P.E.
Date Received: May 18, 2021
New Submittal: Revision: X
Dear Mr. Huntsman:
The City of Monroe Engineering Department has reviewed the subject erosion and sedimentation control plan. The
noted plan has been reviewed and is found to be acceptable; therefore, you are issued this Letter of Approval and
Certificate of Plan Approval. Plan approvals shall expire within three (3) years following the date of this approval
if no land disturbing activity has been undertaken, as required by the City of Monroe Code of Ordinance Chapter
158.16 (G). The Certificate of Approval, NCGO1 permit, Certificate of Coverage (COC) and record of inspections
must be posted at a conspicuous location at the job site. If you proceed prior to approval of all plans you are doing
so at your own risk. Please contact the Permit Center to ensure you have all approvals needed to begin.
Chapter 158.16 (H) of the City Ordinance requires that a copy of the approved erosion control plan be on file at the
job site. In addition, the City maintains the right of entry for periodic inspection as indicated in Chapter 158.17 (D)
of the City Ordinance and by the G.S. I I3A-61.1(a). This letter is due notice of such inspection.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the
above named project. After the NOI is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. Once the fee is received, the COC will be emailed to you. If the
owner/operator of this project changes in the future, the new legally responsible entity is required to apply for their
own COC. The $100 fee is charged annually until a Notice of Termination (NOT) is submitted and approved. You
MUST obtain the COC prior to the commencement of any land disturbing activity. The NOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Alaina Morman at
Alaina.Mormankncdenr.gov or Paul Clark at Paul. Clarkkncdenr.gov.
1
City of
.Monroe
Engineering
300 W Crowell Street, Monroe, NC 28112
monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. Please notify us to set up a preconstruction meeting prior to disturbing any land.
If a preconstruction is not set up it will be a violation. A copy of an approved Certificate of Coverage (COC) should
be provided at this meeting.
Sincerely,
Tonya Griffin
Engineering Associate — Plan Review
cc: Matt Reiking PE, ESP Associates, Inc., P.O. Box 7030, Charlotte, NC 28241
Zahid Khan, NCDEMLR-Mooresville Regional Office -email address: Zahid.khan@ncdenr.gov
Sam Starnes, City of Monroe -Erosion Control Inspector, 3003 West Crowell St., Monroe, NC 28111
File