HomeMy WebLinkAbout20210589 Ver 1_Approval Letter_20210618 DocuSign Envelope ID:91A82F6C-24DB-4AB6-8D16-E15E6C70ABF1
u
ROYCOOPER :)-ir,i
a2=o,,
Governor
JOHN NICHOLSON ` rt ,an..
Interim Secretary ft` F'
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
June 18,2021
Guilford County
NCDWR Project No.20210589
Bridge 52 to Culvert
WBS No. 17BP.7.R.114
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr.Jerry Parker,Environmental Officer
NCDOT,Division 7
1584 Yanceyville Street
Greensboro,NC 27415
Dear Mr.Parker:
You have our approval,in accordance with the conditions listed below,for the following impacts to replace Bridge
52 on Scientific Street(SR 1332)with a Reinforced Concrete Box Culvert(RCBC)in a UT to Deep River in
Guilford County.
Stream Impacts in the Cape Fear River Basin
Permanent Fill in Temporary Fill in in Stream
Perennial Stream Perennial Stream Total Stream Impacts
Site (linear ft) (linear ft) Impact Requiring
Bank (linear ft) Mitigation
Stabilization Culvert Dewatering (linear ft)
1 121 84 53 258 -
2 8 - - 8 -
3 25 - - 25 -
Totals 154 84 53 291 -
Total Stream Impacts: 291 linear feet
The project shall be constructed in accordance with your application dated received April 23,2021. After reviewing
your application,we have decided that these impacts are covered by General Water Quality Certification Number
4135. This certification corresponds to the Corps Nationwide Permit 14. In addition,you should acquire any other
federal,state or local permits before you proceed with your project including(but not limited to)Sediment and
Erosion Control,Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application(unless modified below).
Should your project change,you must notify the NCDWR and submit a new application. If the property is sold,the
D N512 orthNorth CaroSalisburylina Department
Street o1617 f EnMailvironmentaService Centerl Quality Raleigh,DivisionNorth of WaterCarolina Resources
27649 1617
NORTH CAROLINA
Depa�nem we ironmen<ai[wally 919.707.9000 919.707.9000
DocuSign Envelope ID:91A82F6C-24DB-4AB6-8D16-El5E6C70ABF1
new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying
with all the conditions. If total wetland fills for this project(now or in the future)exceed one acre,or of total
impacts to perennial streams(now or in the future)exceed 300 linear feet,compensatory mitigation may be required
as described in 15A NCAC 2H.0506(h)(6)and(7). For this approval to remain valid,you must adhere to the
conditions listed in the attached certification(s)and any additional conditions listed below.
Condition(s)of Certification:
Project Specific Conditions
1. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
15A NCAC 02H.0506(b)(2)
2. As a condition of this 401 Water Quality Certification,bridge demolition and construction must be accomplished
in strict compliance with the most recent version of NCDOT's Best Management Practices for Construction and
Maintenance Activities. [15A NCAC 02H.0507(d)(2)and 15A NCAC 02H.0506(b)(5)]
3. Placement of culverts and other structures in open waters and streams shall be placed below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches,and 20 percent of the culvert
diameter for culverts having a diameter less than 48 inches,to allow low flow passage of water and aquatic life.
Design and placement of culverts and other structures including temporary erosion control measures shall not be
conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks,adjacent to or
upstream and downstream of the above structures. If this condition is unable to be met due to bedrock or other
limiting features encountered during construction,please contact NCDWR for guidance on how to proceed and to
determine whether a permit modification will be required. [15A NCAC 02H.0506(b)(2)]
General Conditions
1. If concrete is used during construction,a dry work area shall be maintained to prevent direct contact between curing
concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface
waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200]
2. During the construction of the project,no staging of equipment of any kind is permitted in waters of the U.S.,or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
3. The dimension,pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
4. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A
NCAC 02H.0506(b)(2)]
5. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted
for approval. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
6. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the
most current version of NCDOT Construction and Maintenance Activities manual such as sandbags,rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC
02H.0506(b)(3)and(c)(3)]
7. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
j North Carolina Department of Environmental Quality i Division of Water Resources
D_E512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROUNA
Department of Environmenteloo.ury 919,707.9000
DocuSign Envelope ID:91A82F6C-24DB-4AB6-8D16-E15E6C70ABF1
9. No rock,sand or other materials shall be dredged from the stream channel except where authorized by this certification.
[15A NCAC 02H.0506(b)(3)]
10. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
prohibited. [15A NCAC 02H.0506(b)(3)]
11. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with§303(d)of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met(including the failure to sustain a designated or achieved use)or that State or federal law is being violated, or that
further conditions are necessary to assure compliance,the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
12. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1,unless otherwise authorized
by this certification. [15A NCAC 02H.0506(b)(2)]
13. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications,if any,shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
14. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and.0502]
15. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements,etc.
16. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
17. Upon completion of the project(including any impacts at associated borrow or waste sites),NCDOT project engineer
(or appointee) shall complete and return the enclosed"Certification of Completion Form"to notify the NCDWR when
all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)]
18. There shall be no excavation from,or waste disposal into,jurisdictional wetlands or waters associated with this permit
without appropriate modification. Should waste or borrow sites,or access roads to waste or borrow sites,be located in
wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction
activities. [15A NCAC 02H.0506(b)(3)and(c)(3)]
19. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards[15A NCAC 02H.0506(b)(3)and(c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design,installation,operation,and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
j North Carolina Department of Environmental Quality 1 Division of Water Resources
D_E512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROUNA
Department of Environmentel ou.ury 919,707.9000
DocuSign Envelope ID:91A82F6C-24DB-4AB6-8D16-E15E6C70ABF1
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
20. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. [15A NCAC 02H.0506(b)(3)and(c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm,except
for official state holidays. The original and one(1)copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone: (919)431-3000,Facsimile: (919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr.Bill F.Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions,please contact Dave Wanucha at(336)403-5655 or dave.wanucha@a,ncdenr.gov.
Sincerely,
,-DocuSigned by:
awl 44pw4),,,,
'-9C9886312DCD474...
S.Daniel Smith,Director
Division of Water Resources
Electronic copy only distribution:
David Bailey,US Army Corps of Engineers,Raleigh Field Office
Gary Jordan,US Fish and Wildlife Service
Travis Wilson,NC Wildlife Resources Commission
File Copy
DEj North Carolina Department of Environmental Quality i Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CARO�1NA
Department of Environmentel ou.ury 919,707.9000
DocuSign Envelope ID:91A82F6C-24DB-4AB6-8D16-El5E6C70ABF1
o` t STATE
ROY COOPER la'l - -_-- o i
Governor
JOHN NICHOLSON 40.a n� �4-
Interim
Secretary ,` TM' _=
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and
any subsequent modifications,the applicant is required to return this certificate to the 401 Transportation Permitting
Unit,North Carolina Division of Water Resources, 1617 Mail Service Center,Raleigh,NC,27699-1617. This form
may be returned to NCDWR by the applicant,the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that,to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, ,as a duly registered Professional Engineer in the State of North
Carolina,having been authorized to observe(periodically,weekly,full time)the construction of the project for the
Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature Registration No.
Date
D NoS12rth Carolinaalisbury Department of
1617 EnvironmentaMail l Quality I Raleigh,Division of WaterNarth Resou27rces
North S Street Service Center Carolina 649 1617
NORTH CAROLINA
naaadaaat Of swimnmanmi naaitir 919.707.9000