HomeMy WebLinkAbout20190908 Ver 1_Compliance Evaluation Inspection_20210611Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190908
NCDOT - Replace Bridge 276 on SR 1104
Haywood
NCDOT - Replace Bridge 276 on SR 1104
NC DOT Division 14 - Sylva
6/11/2021
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 49' 54''+35° 26' 24''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site Inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 11, 2021. Jason Messer
was present during the inspection. The following are items that need attention:
-Remove plastic matting on stream bench underneath bridge. Can replace with coir fiber or leave open if bench is all
rock.
-Remove plastic matting on stream bank (Left Bank Descending) below new bridge. Replace with coir fiber matting.
-Add groundcover per NPDES groundcover requirements in areas not actively being worked.
NPDES records were up to date.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190908
6/11/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2