Loading...
HomeMy WebLinkAboutGW1-2021-00796_Well Construction - GW1_20210303 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Ronnie Stancil Well Contractor Name FROM TO DESCRIPTION 2283-A �:> , o oQ 1 �O� ft. ft. NC Well Contractor Certification Number `tl�rN�� 35r I G for,iuultl<cswells pR= TPvR" Sri' Grady Poole Well & Pump Co., Inc. - FROM TO DIAMETER THICKNESS MATERIAL 0 ft ft. 6 f m. U e Company Name ,^` 4G;3IVPl CaXS G=L1R913111NSi` tllcrarettlliseddoo -< .�. .' 2.Well Construction Permit#: GW-027947-20194 FROM To DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. ft 1 in. 3.Well Use(check well use): f}}t.*' ft, to Water Supply Well: FROM TO DIAMETER: BLOT SIZE THICKNESS MATERIAL ❑Agricultural OMunicipal/Public ft. ft, im ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft, ft. ❑lndustriaVCommercial MResidential Water Supply(shared) t11 GR - ., ❑Irri ation ❑Wells>100,000 GPD FROM TO I MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft- 20 ft- Bentonite Gravity ❑Monitoring ORecovery ft. ft- Injection Well: IL ft. ❑Aquifer Recharge ❑Groundwater Remediation k9. Al+lif7f.G '1rEL:P fttliilte ; OAquifer Storage and Recovery ❑Salinity Barrier FROM I TO I MATERIAL EMPLACEMENT METHOD ❑Aquifer Test OStormwater Drainage ft, ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer Gt ,tittaeidit►anat b = $ ` '_ ❑Geothermal Heatin Cooling Return) ❑Other(explain under#21 Remarks FROM TO DESCRIPTION color,saran aoiVrock a size etc.)) ft. 2_ ft. Topsoil 4.Date Well(s)Completed: 3/23 121 Well 1D# 2 ft' ft' 5a.Well Location: 94' ft' �® ft' if C WoodyBuilt LLC ft. ft Facility/Owner Name Facility ID#(if applicable) ft. % 2645 Winter Storm Rd. Zebulon 27597 ft. ft. Physical Address,City,and Zip ft. ft. Wake 2706477932 z z County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lattiong is sufficient) 22.Certification: N W 6.Is(are)the well(s): nPermanent or OTemporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the nell(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: OYes or MNo 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page,to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled'o^e 0 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ff} Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200'and 2@100') 2(� 24a. For All Wells: Original forth to Division of.Water Resources (DWR), 10.Static water level below top of casing: (ft. ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" i 11.Borehole diameter: 6 (in,) 24b.For Injection Wells: Copy toIDWR Underground Injection Control(NC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: 24c.For Water Supply and Open-Loop Geothermal Return Welts:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department o the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: BIoW Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: HTH Amount: 1 Lb. i Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources F Revised 6-6-2018 i