Loading...
HomeMy WebLinkAbout20210589 Ver 1_Scientific Street Revised Mitigation Letter_20210611 June 7, 2021 Mr. Jerry Parker NCDOT Division 7 Environmental Supervisor North Carolina Department of Transportation Post Office Box 14996 Greensboro, North Carolina 27415-4996 Dear Mr. Parker: Subject: DMS Mitigation Acceptance Letter: Division 7 Project – Replace Bridge 52 over UT to Deep River on SR 1332 (Scientific Street), Guilford County, WBS Number 17BP.7.R.114 The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (NCDEQ DMS) will provide the stream and buffer mitigation for the subject project. Based on the information supplied by you on April 22, 2021, the impacts are located in CU 03030003 of the Cape Fear River basin (Randleman) in the Central Piedmont (CP) Eco-Region, and are as follows: Cape Fear 03030003 Randleman Stream Wetlands Buffer (Sq. Ft.) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 0 230.0 0 0 0 10,350.0 6,148.0 All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR’s Buffer Authorization Certification, DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund. Upon completion of transfer payment, NCDOT will have completed its riparian buffer mitigation responsibility for this project. This mitigation acceptance letter replaces the mitigation acceptance letter issued on April 21 and April 22, 2021. The impacts and associated mitigation needs were not projected by the NCDOT in the 2021 impact projection data. DMS commits to implementing sufficient stream mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. Mr. Parker SR 1332 – Bridge 52 June 7, 2021 Page Two If you have any questions or need additional information, please contact Beth Harmon at 919- 707-8420. Sincerely, James B. Stanfill DMS Asset Management Supervisor cc: Mr. Dave Wanucha, NCDWR – Raleigh Regulatory Field Office Ms. Linda Fitzpatrick, NCDOT – PDEA File: SR 1332 – Bridge 52 – Division 7 Revised 2