Loading...
HomeMy WebLinkAbout20080737 Ver 12_U-2519CA Fayetteville Outer Loop Loss of Material 20210607_20210609u,sts. ...wile outer bop seoon Loss or Futeral Jule .1 Lia/Pobert On June 1, 3831 the project experienced a rainstorm that precipitated 1.13" of ralnfall In a 1 hour period. The project exoerlencea a loss of aporoxlmately 1.o Cava of material at wetland PUN 1-L. LT Sta. 616«I5l. Below are pictures of the Impacted area. The contractor has been Informed of this loss of materiak along with other erosion control Issues. and provided a list of items. be corrected. The contractor continues to focus on cleanup of the site and to restore all erosion control measures to working order. If you need any additional information or pictures please let me know. Once cleanup is complete, photos will be submitted. Greg