Loading...
HomeMy WebLinkAboutNCC191732_NOT Closeout Documents_20210603ROY COOPER Governor' ra DIONNE DELLI-GATTI Secretary y BRIAN WRENN Director NORTH C-ARO NA nvsror�:tr�ena aim+ Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contair> corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely, Land Quality Section Mooresville Regional Office North Carohna Departnent of Environmental Quality I Division of Energy, Mineral and Land Resources KkE�} Mooresville Regional Office 610 East Center Ave=e, Suite 301 Mcoesville, North Carolina 28115 1 104-663-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Gaston Project: Gastonia FUSE Complex River basin: Catawba Person financially responsible: City of Gastonia - J. Philip (Flip) Bombardier, Project #: GASTO-2019-018 Assistant City Manager Address: 150 South York Street z28052, Post Office Box 1748 z25053, Gastonia, NC 2805 1. Project Location: US 74, Gastonia Pictures: No 2. Weather and soil conditions. Sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one Title: Inspection report: Sent Report Date given/sent: March 23, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Matthew Gigante Date of inspection: March 17, 2021 M. Others present: Time arriving on site: 12:35 PM Time leaving site: 12:45 PM