HomeMy WebLinkAboutNCC191732_NOT Closeout Documents_20210603ROY COOPER
Governor'
ra
DIONNE DELLI-GATTI
Secretary
y
BRIAN WRENN
Director
NORTH C-ARO NA
nvsror�:tr�ena aim+
Dear Sir or Madam:
Attached is a copy of the inspection report which was prepared following an on -site inspection of the
subject site. This report is intended to provide you with information concerning the status of the site
as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973.
Please review this report carefully as it may contair> corrective actions needed or comments which will
assist you in meeting the required performance standards of the Act.
It is our desire that any and all possible problems be discussed and resolved at the earliest possible
time. To facilitate this effort, please contact the named inspector at the address shown on the
inspection report if you have any questions.
Sincerely,
Land Quality Section
Mooresville Regional Office
North Carohna Departnent of Environmental Quality I Division of Energy, Mineral and Land Resources
KkE�} Mooresville Regional Office 610 East Center Ave=e, Suite 301 Mcoesville, North Carolina 28115
1 104-663-1699
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Gaston Project: Gastonia FUSE Complex River basin: Catawba
Person financially responsible: City of Gastonia - J. Philip (Flip) Bombardier, Project #: GASTO-2019-018
Assistant City Manager
Address: 150 South York Street z28052, Post Office Box 1748 z25053, Gastonia, NC 2805
1. Project Location: US 74, Gastonia
Pictures: No
2. Weather and soil conditions. Sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one Title:
Inspection report: Sent Report Date given/sent: March 23, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination.
Reported by: Matthew Gigante
Date of inspection: March 17, 2021
M.
Others present:
Time arriving on site: 12:35 PM Time leaving site: 12:45 PM