Loading...
HomeMy WebLinkAbout20120986 Ver 1_pre-con notice_20130312PAT MCCRORY GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION March 12, 2013 CONTRACT NO.: DA00145 STATE PROJECT: WBS 17BP.1.R.23 COUNTY: Bertie DESCRIPTION: Replacement of Bridge 417 over Loosing Swamp on SR 1200 Mr. Mark Perkins T. A. Loving Company Post Office Drawer 919 Goldsboro, NC 27533 -0919 Dear Mr. Perkins: ANTHONY J. TATA SECRETARY This serves to confirm the Preconstruction Conference for the above referenced project scheduled for Tuesday, March 26, 2013, at 9:00 A.M. in the District III Field Engineer's Office, located at 19210 US Highway 64E Williamston, NC 27892. A proposed Progress Schedule shall be submitted to the Department no later than seven (7) days prior to the date of the project preconstruction conference and shall be approved before any payments will be processed for the project. In addition, the following information should be submitted to the Department at the Preconstruction Conference: • Detailed Construction Schedule • List of Project Personnel (i.e. Project Manager, Project Superintendent, Traffic Control Coordinator, Erosion Control Coordinator, EEO Coordinator, etc.) • List of Material Suppliers • List of Subcontractors • List of Company Officials Authorized to Execute Supplemental Agreements It is requested that you invite any proposed subcontractors deemed necessary. By copy of this letter, I am inviting various Department representatives having involvement and /or interest in this project. Should you require additional information on this matter, please contact this office at (252) 792 -0347. Sincerely, Shawn Mebane, PE Resident Engineer 19210 U.S. Hwy. 64 East, Williamston, NC 27892, Phone (252)789 -6159; Fax (252)792 -0539 Mark Perkins Page #2 March 12, 2013 cc: Mr. Ron Hancock, P.E. — State Construction Engineer Mr. Jerry Jennings, P.E. — Division Engineer Mr. Bob Capehart, P.E. — Division Construction Engineer Mr. Sterling Baker, P.E. — Division Maintenance Engineer Mr. Darrick Lee, P.E. — District III Lead Field Engineer Mr. Scott Emory, P.E. — District II Lead Field Engineer Mr. John Abel — Division Bridge Project Manager Mr. Tony Bracy — Division QA Lab Supervisor Ms. Tracey Brown - Right of Way Agent Mr. Clay Willis — Division Environmental Officer Mr. Chad Edge, III, P.E. Division Traffic Engineer Mr. Andy Blankenship, P.E. — Roadside Environmental Field Operations Engineer Ms. Carla Pugh — Roadside Environmental Field Operations Technician Mr. Christopher Peoples, P.E. — State Materials Engineer Ms. Maria Long — Section Materials Specialist Mr. Eddie Bunn, PE — Bridge Construction Engineer Mr. David A. Jackson - Pavement Construction Specialist Mr. Charles W. Brown, P.E., PLS — State Location & Surveys Engineer Mr. Casey Whitley — Location & Surveys Locating Engineer Mr. Bill Biddlecome — US Army Corps of Engineers (Washington) Mr. Garcy Ward — NCDENR, Water Quality Section (Washington) Ms. Sharon Lipscomb — VI /EO Contract Compliance Manager Ms. Jorgelia Nino — EEO Compliance Specialist Mr. Morris Rascoe — Interim Bertie County Manager 19210 U. S. Hwy. 64 East, Williamston, NC 27892 Phone (252)789 -6159 ; Fax (252)792 -0539