HomeMy WebLinkAboutNCC213373_ESC Approval Submitted_20210604ROY COOPER
:Governor
DIONNE DELL CATTI
Secretary
BRIAN WRENN
¢ieector
Wellons Realty, Inc.
Robert Wellons
Post Office Box 730
Dunn, NC 28335
NORTH CARC>UNA
Enyfroe:mentai Quality:
May 26, 2021
LETTER OF APPROVAL
RE: Project Name: Cottages at Gleneagles Phase 2 Lots 26-37
Acres Approved: 5.2
Project ID: HARNE-2021-120
County: Harnett, City: Dunn
Address: N. Powell Avenue
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Fleet Temple
Date Received by LQS: April 29, 2021
Plan Type: Residential
Dear Mr. Wellons:
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and herebyissue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the. date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and.
submit an electronic Notice of Intenit (NOI) form requesting a Certificate of
Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted and COC issued prior to the commencement of any
land disturbing activityon the above -named project. The NOI farm may be accessed
at deq.nc.gov/NCG0I. Please direct questions about the NOI form to Annette Lucas
at Annette. lucas{crQ,n.cdenr.aov or Paul Clark at Paul.elark@ncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage under the
NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
t
MENorth Carolina Department df Envir')nMehtal.Quality I Division of Energy, Mineral and'Land Resources
Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NOHiri G^POU -
"�'°""� m.o 910.433.33()0
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC, one it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan..
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided.
You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the
appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
(S. v" 3A4j
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Fleet Temple, P. E., Enoch Engineers, P. A. — electronic copy
Steven King, City of Dunn Inspections Office — electronic copy
Fayetteville Regional Office