Loading...
HomeMy WebLinkAboutNCC192490_NOT Signed Certification_20210602NCG01 Notice of Termination (NOT) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOT (Rescission) form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6t" Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: Name of Project: NCC192490 Barclay Road Water Main Replacement Per NC General Statute 143-215.6E (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a frne not to exceed ten thousand dollars ($10,000). Linder penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true, complete, and accurate. Legally Responsible Organizational Entity: Orange Water and Sewer Authority *Legally Responsible Person: Todd Taylor, P.E. Title of Legally Responsible Person: *Signature: Print Name and Title of Signed (only if Executive Director Date: 6' 112aizi individual signing differs from Legally Responsible Person): * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part 1V, Section B, Item (6) of the NCG010000 permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of the NCG010000 permit.