Loading...
HomeMy WebLinkAboutNC0028916_Inspection_20090116Beverly Eaves Perdue, Governor oF.W&-4 • January 16, 2009 Grey Walls Town of Troy 444 North Main Street Troy, North Carolina 27371 SUBJECT: Compliance Evaluation Inspection Report Town of Troy WWTP NPDES Permit No. NC0028916 Montgomery County Dear Mr. Walls: Dee Freeman, Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Enclosed you will find a copy of the Compliance Evaluation Inspection report for the inspection conducted on January 13, 2009. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations are in Section D. Summary of Findings/Comments of this inspection report. This facility appeared to be well operated and well maintained. Please keep up the good work. If you have any questions or comments concerning this report or require clarification on part(s) of this report, please contact me at (910) 433-3312. Sincerely, Dale Lopez Environmental Specia Enclosures: EPA Water Compliance. Inspection Report Regional Field Inspectors Check List for Field Parameters cc: FRO Files One NorthCarolina Naturally North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Internet: www.ncwaterqualitv.ora Fax (910) 486-0707 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper 31 NPDES NC0028916 111 121 yr/mo/day 09/01/13 Inspection Type 117 18I C I (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The ORC set up, and calibrated the flow proportional sampling for the 24-hour effluent composite sampler. The ORC performed the annual calibration check of the influent ultrasonic flow meter. An operator routinely visited the POTW every day of the week (7 days/week). Donna Mills was the Back -Up ORC for this POTW. The SCATA system phoned the ORC first, then proceeded to other operators until someone answered the call and the problem at the POTW, such as: #1 was the high level sludge alarm, #2 was the high temperature alarm for the influent pumps, #3 was the overtorque alarm for the grit classifier, and #4 was the alarm for the UV unit power. As a reminder and to ensure compliance with this part of the permit, please review the NPDES Permit, Part II, Section A, Composite Sample, concerning each grab sample in the composite not being less than 100 mL in volume, and "the preset gallon interval between sample collection fixed at no greater than 1/24 of the expected total daily flow at the treatment system" for Variable time/constant volume. Page # 2 Permit: NC0028916 Owner - Facility: Troy WWTP Inspection Date: 01/13/2009 Inspection Type: Compliance Evaluation Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: No reuse water at this POTW. Permit Yes No NA 'NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? {3 n n n Is the facility as described in the permit? unnn # Are there any special conditions for the permit? unnn Is access to the plant site restricted to the general public? unnn Is the inspector granted access to all areas for inspection? unnn Comment: Record Keeping Are records kept and maintained as required by the permit? ' n n n Is all required information readily available, complete and current? unnn Are all records maintained for 3 years (lab. reg. required 5 years)? unnn Are analytical results consistent with data reported on DMRs? ®n ❑ n Is the chain -of -custody complete? « n n n Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Yes No NA NE u nnn u nnn Yes No NA NE 0 ®- u nnn n nnu n n®n n nn® u nnn unnn u nnn Page # 3 Permit: NC0028916 Owner - Facility: Troy WWTP Inspection Date: 01/13/2009 Inspection Type: Compliance Evaluation Record Keeping Facility has copy of previous year's Annual Report on file for review? Comment: Flow Measurement - Influent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated), Does the chart recorder match the flow meter? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser. pipes are required) are they operating properly? Comment: Drying Beds Is there adequate drying bed space? ❑ ❑ n Is the sludge distribution on drying beds appropriate? n n on. Are the drying beds free of vegetation? n n ® n # Is the site free of dry sludge remaining in beds? n n ® n Is the site free of stockpiled sludge? n n E n Is the filtrate from sludge drying beds returned to the front of the plant? n n ® n # Is the sludge disposed of through county landfill? n n ® ❑ # Is the sludge land applied? n n ® n. (Vacuum filters) Is polymer mixing adequate? n n ® n Comment: The drying beds are no longer used. However, a septage hauler has been allowed to apply to two drying beds. The filtrate from the drying beds flowed to the headworks at a point downstream of the influent sampling point. Bar Screens Yes No NA NE Type of bar screen a.Manual lid b.Mechanical Are the bars adequately screening debris? e n n n Page # 4 Yes No NA NE n nn ig Yes No NA NE ®nnn ®nnn ®•nnn ® nnn Yes No NA NE ® nnn • nnn nnn_-.n Yes No NA NE Permit: NC0028916 Owner - Facility: Troy WWTP Inspection Date: 01/13/2009 Inspection Type: Compliance Evaluation Bar Screens Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: The flow through the manual bar screen (with approximately 1 to 2 inch openings) was in series with the mechanical bar screen (installed approximately two years ago). The manual bar screen does not allow large material to pass through to the mechanical bar screen (a stainsless steel "low -flow screen" that was manufactured by Jones & Atwood). Screening went to the Uharrie Landfill. Grit Removal Type of grit removal a.Manual b.Mechanical Yes No NA NE 3nnn ®nnn nnn Yes No NA NE n Is the grit free of excessive organic matter? ® ❑ n Is the grit free of excessive odor? • ® n n n # Is disposal of grit in compliance? n n n Comment: The grit removal equipment used a chamber that was periodically aerated, then an air lift pump carried the grit up a pipe to the grit classifier for dewatering, then to a dumpster and to the Uharrie Landfill. Equalization Basins Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are at pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Comment: When the influent exceeded 1.2 MGD, then flow entered the ten -acre EQ (lagoon) by excessive flow through a valve -less pipe from the influent wet well. Each of the two influent pumps were capable of handling 1.2 MGD of flow.. They alternated each time that they came on. The flow to the EQ was later fed back into the WWTP for treatment. Oxidation Ditches Yes No NA NE nn2n ▪ nnn ®nnn n nn® ® nnn n nn® n n®n minim Yes No NA NE Are the aerators operational? ® n n n Page # 5 s Permit: NC0028916 Owner - Facility: Troy WWTP Inspection Date: 01/13/2009 Inspection Type: Compliance Evaluation Oxidation Ditches Are the aerators free of excessive solids build up?- # Is the foam the proper color for the treatment process? - Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable?. Are settleometer results acceptable (> 30 minutes)? Is the DO level acceptable?(1.0 to 3.0 mg/I) Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) Comment: In addition, there were two horizonal mixers in the'oxication ditches. The target MLTSS was 3,500 mg/L. The two oxidation ditches were operated in series, rather than in parallel. Disinfection - UV Are extra UV bulbsavailable on site? Are UV bulbs clean? Is UV intensity adequate? Is transmittance at or above designed level? Is there a backup system on site? Is effluent clear and free of solids? Comment: HTH tablets and Dechlor tablets for emergency use. Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreeinent with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: No automatic-switchover, only a manually operated generator. The generator was tested under load approximately twice per year. Pumps-RAS-WAS Are pumps in place? Are pumps operational? Yes No NA NE nn n ®nnn rnnn Erin El n'nn u nnn ® nnn Yes No NA NE n nn nn ■ nnn nnn ®rinn ® nnn Yes No NA NE nn n nnn ®nnn nunn n rinm nnn®• ®nnn Yes No NA NE Erin rl nnn Page # 6 Permit: NC0028916 Owner- Facility: Troy WWTP Inspection Date: 01/13/2009 Inspection Type: Compliance Evaluation Pumps-RAS-WAS Are there adequate spare parts and supplies on site? Comment: Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge?. .Comment: The aerobic Digester had mixing and aeration. Synagrow handled the land application. Yes No NA NE nnng Yes No NA NE ® n ❑ nnn • nnn n nn® n n®n W HEW Yes No NA NE n.nn nnn • nnn o nnri o nnn • nnn Yes No NA NE unnn Linn n ▪ nn ▪ nnn Kin n n Page # 7 f f ' 441 Regional Field Inspectors Check List for Field Parameters Name of site to be inspected: Troy Date: 01/13/09 `N.. Field certification # (if applicable): 5350 NPDES #: NC0028916 Inspector: Dale Lopez ``— Region: Fayetteville' I. Circle the parameter or parameters performed at this site. Residual Chlorine, Settleable Solids, pH, DO, Conductivity, II. Instrumentation: A. Doesthe facility have the equipment necessary to analyze field parameters as circled above? Temperature 1. A pH meter Fischer Accumet pH meter 501 2. A Residual Chlorine meter 3. DO meter lYSI 551 4. A Cone for settleable solids 5. A thermometer or meter that measures temperature. IYSI 551 6. Conductivity meter III. Calibration/Analysis: 1. Is the pH meter calibrated with 2 buffers and checked with a third buffer each day of use? 2. For Total Residual Chlorine, is a check standard analyzed each day of use? 3. Is the air calibration of the DO meter performed each day of use? 4. For Settleable Solids, is.1 liter of sample settled for 1 hour? 5. Is the temperature measuring devicecalibrated annually against a certified thermometer? 'Last calibrated on 04/01/081 6. For Conductivity, is a calibration standard analyzed each day of use? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No IV. Documentation: 1. Is the date and time that the sample was collected documented? 2. Is the sample site documented? 3. Is the sample collector documented? 4. Is the analysis date and time documented? 5. Did the analyst sign the documentation? 6. Is record of calibration documented? 7. For Settleable Solids, is sample volume and 1 hour time settling time documented? 8. For Temperature, is the annual calibration of the measuring device documented? Comments: pH Buffer 7 expiration date = April 2010 pH Buffer 4 expiration date = March 2010 pH Buffer 10 expiration date = April 2010 Yes Yes Yes Yes Yes Yes Yes No No No No No Yes No Please submit a copy of this completed form to the Laboratory Certification Program. DWQ Lab Certification Chemistry Lab Courier # 52-01-01 FIELD INSPECTOR CHECKLIST REV. 04/23/2002