Loading...
HomeMy WebLinkAboutNCC213175_ESC Approval Submitted_20210602ROY COOPER Goverrmr MICHAEL S. REGAN sic-tary BRIANWRENN Acf4ngaUvdVi" NORTH CAROLINA tat;Q=W' March 9, 2021 LETTER OF APPROVAL WITH MODIFICATIONS BSC Holidngs, Inc. ATTN: Barry Siegal PO Box 16168 High Point, NC 27261 RE: Project Name: Stonehaven Subdivision Acres Approved: 10.30 Project ID: FORSY-2021-020 County: Forsyth City: Kernersville Address: County Line Road (SR2037) River Basin.: Cape Fear Stream. Classification: WS-III; NSW Submitted By: CPT Engineering and Surveying, Inc. Date Received by LQS: February 24, 2021 Plan Type: Revised Dear Mr. Siegal: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. N orth'Caroltna Department of Envhvnmental oualo I Divisio aft rgyinera land LmOPesources wkiston-salem Reqmol Office 1450 West Hanes W Road, St tC 0.1.. WIToS OOr $abbK N+ ah'Gar4DJtna 2n05 3S7Ext� Letter of Approval with Modifications BSC Holdings, Inc. March 9, 2021 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project Your cooperation is appreciated. , Sincerely, Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet Modifications Required for Approval cc: CPT Engineering and Surveying, Inc. WSRO ATTN: John A. Butler 4400 Tyning Street High Point, NC 27265 Letter of Approval with Modifications BSC Holdings, Inc. March 9, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Stonehaven Subdivision Project ID: FORSY-2021-020 County: Forsyth 1. All work must be done within the limits of disturbance for the duration of this project. If erosion control devices or ground disturbing activity associated with this project occur outside the approved limits of disturbance a revised plan must be submitted to address the area(s) of concern. This must occur even if the area in question is associated with another active project. [G.S. 113A-57(3)] 2. Approval by a representative of the Land Quality Section will be required prior to removal of erosion control measures and/or conversion of the sediment basin(s) to post -construction stormwater SCMs. [15A NCAC 46 .0106(a)(5)] 3. Be advised baffles are utilized as a measure to reduce the velocity and turbulence of water flowing through a basin/trap. Failure to maintain these measures may result in basin/trap failure. Refer to the Maintenance section within section 6.65 of the North Carolina Erosion and Sediment Control Planning and Design Manual. [G.S.113A-57(3)] 4. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 413 .0115] 5. Please submit a PDF version of the sediment and erosion control plans to this office at jack.dalton@ncdenr.gQv for inspections. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities