Loading...
HomeMy WebLinkAboutWQ0016400_Staff Report_20210528DocuSign Envelope ID: AD884367-722B-49C1-B7DC-EDE83BCDE773 Q� May 28, 2021 State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report To: DWR Central Office — WQ, Non -Discharge Unit Application No.: W00016400 Attn: Chloe Lloyd Facility name: Kemp SFR WWI (Parcel 8970-74-8540 From: Patrick Mitchell Winston-Salem Regional Office Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. L GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: May 27, 2021 b. Site visit conducted by: P. Mitchell c. Inspection report attached? ❑ Yes or ® No d. Person contacted: Mark Kemp and their contact information: (336) 421 - 1829 e. Driving directions: See file. II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ❑ Yes ❑ No ® N/A If no, please explain: System not constructed 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ❑ Yes ❑ No ®N/A 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No 5. Is the residuals management plan adequate? ❑ Yes ❑ No ® N/A 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A 12. Has a review of all self -monitoring data been conducted? ❑ Yes ❑ No ® N/A 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ® No ❑ N/A If no, please explain: Maintain current schedules related to new construction and site review. FORM: WQROSSR 04-14 Page 1 of 2 DocuSign Envelope ID: AD884367-722B-49C1-B7DC-EDE83BCDE773 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No 2. List any items that you would like the NPDES Unit or Non -Discharge Unit Central Office to obtain through an additional information request: 3. List specific permit conditions recommended to be removed from the permit when issued: 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Note: Maintain current permit schedule conditions. Lot is vacant and system not constructed. 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (Please state reasons: ) DocuSigned by: 6. Signature of report preparer: Signature of regional Date: MU 28, 2021 IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS L- 1 T. Stiiolcr On May 27, 2021, WSRO staff made a site visit to confirm no alterations have occurred to the proposed site and that nothing has been constructed on the site. A large portion of the property was recently logged but no other changes were noted. Prior to construction, a preconstruction consultative site visit needs to be conducted by WSRO staff to ensure permit conditions are met due to the extended period between initial design and installation. FORM: WQROSSR 04-14 Page 2 of 2