HomeMy WebLinkAboutNCS000589_2021 DMR_20210526t
DUKE
ENERGY,
PROGRES"-
May 25, 2021
Certified Mail # 7019 2280 0001 4397 2917 (Original)
NC DEQ-DEMLR, FRO
225 Green Street, Suite 714
Fayetteville, NC 28301
Subject: Weatherspoon's April 2021
Stormwater Discharge Monitoring Report (DMR) Submittal
Mr. Lawyer:
W. H. Weatherspoon Plant
491 Power Plant Rd
Lumberton, NC 28358
Mailing Address:
Kent Tyndall
L. V. Sutton Energy Complex
801 Sutton Steam Plant Rd
Wilmington, NC 28401
o:910.341.4775
Duke Energy Progress, LLC submits the Stormwater Discharge Monitoring Report for W. H.
Weatherspoon. This submission is made in accordance with Part III, Section E of our NPDES Stormwater
Permit No. NCS000589, and updated guidance received from the section titled 'How to Submit Paper
DMRs Before eDMR is Implemented' via web link https://deq.nc.gov/deg.nc.gov/sw-edmr.
SW-2 is in Tier I status due to 9/13/2020 Copper sampling result being above the benchmark value.
Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample
results are below the benchmark values or within benchmark range.
SW-2 is also in Tier I status due to 9/13/2020 TSS sampling result being above the benchmark value.
Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample
results are below the benchmark values or within benchmark range.
Neither SW-1, SW-2, or SW-3 had a discharge in April 2021. The attached table list each day during the
month that had rainfall. It also explains why sampling was not performed on those days.
If there are any questions, please contact either:
• Mr. Kent Tyndall, EHS Professional for the W. H. Weatherspoon Plant; phone (910) 341-4775 or
e-mail Kent.Tvndall@duke-energy.com; or
• Ms. Elizabeth Glenn, Environmental Specialist with our Environmental Permitting and Compliance
Group, phone (980) 373-0530 or email Elizabeth.Glenn@duke-energy.com.
Please direct all correspondence to Kent Tyndall via the mailing address shown above.
/ certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. / am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
r
Jeffrey Flanagan
Station Manager
Weatherspoon's April 2021
Stormwater Discharge Monitoring Report (DMR) Submittal
Table Page 1 of I
Date of
rainfall
4/1/2021
Actual
stormwater
discharge?
N
>72-hrs since
last
discharge?
N
Can sample
w/i first 30-
minutes?
y
Safe to
sample?
y
Can sample
w/i normal
business hrs?
y
4/11/2021
y
y
N
N
N
4/15/2021
IN
y
N
y
y
4/25/2021
N
y
N
y
N
vz
r
r
Nr
I
Is
47
-
nl NI
'0
t1
ca,
as
a
U
a H v o
??
c
W
�G U
C
aOE
i bq
v
v� W o
rn
� a
a a
on
a
v
W U O o
a
f
Z a� uQ
3
w
U
�ww Q
as
�,gto
on
�
O
151
o
d Sol
a°
z4
E
0
M
try
�
o
E
�
a
r
s
awl
a'?
o
�
a
z
G
G
Ha
�
a
p O
EGrr�
y
Z'
z
F
A �i U
E
c�
N
M
�+
V�crCon
o z
M
O
Vh•
��
O
tn
M
o
z
a
N
ON
v
4F?
h
0
otjo
O
o
c a
C
ova
�
d
Q
0
� F
o
U U
�
M
O
cl
�n
M
..Gi
C
sue,
N
C?
G
o z
po
0
Z
CC
di
Paw
tn
cc
in
E--q
oz
C-4
4)
U
u
rA 00
� C-4
L.
COO
�T.
t
40
go
>
cclq
O
C3
sw
O
ca
Q
go
CJ
co
EA
cz
&w
>
ow
ci
ul
_R
gz
cts
C3
Z
C3 W
W
wo
gz
'7E
d ow
c�n W w
fl—Z
;.
CV