HomeMy WebLinkAboutNCS000589_2021 DMR_20210526t DUKE ENERGY, PROGRES"- May 25, 2021 Certified Mail # 7019 2280 0001 4397 2917 (Original) NC DEQ-DEMLR, FRO 225 Green Street, Suite 714 Fayetteville, NC 28301 Subject: Weatherspoon's April 2021 Stormwater Discharge Monitoring Report (DMR) Submittal Mr. Lawyer: W. H. Weatherspoon Plant 491 Power Plant Rd Lumberton, NC 28358 Mailing Address: Kent Tyndall L. V. Sutton Energy Complex 801 Sutton Steam Plant Rd Wilmington, NC 28401 o:910.341.4775 Duke Energy Progress, LLC submits the Stormwater Discharge Monitoring Report for W. H. Weatherspoon. This submission is made in accordance with Part III, Section E of our NPDES Stormwater Permit No. NCS000589, and updated guidance received from the section titled 'How to Submit Paper DMRs Before eDMR is Implemented' via web link https://deq.nc.gov/deg.nc.gov/sw-edmr. SW-2 is in Tier I status due to 9/13/2020 Copper sampling result being above the benchmark value. Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample results are below the benchmark values or within benchmark range. SW-2 is also in Tier I status due to 9/13/2020 TSS sampling result being above the benchmark value. Therefore, we are required to conduct monthly monitoring at this outfall until three consecutive sample results are below the benchmark values or within benchmark range. Neither SW-1, SW-2, or SW-3 had a discharge in April 2021. The attached table list each day during the month that had rainfall. It also explains why sampling was not performed on those days. If there are any questions, please contact either: • Mr. Kent Tyndall, EHS Professional for the W. H. Weatherspoon Plant; phone (910) 341-4775 or e-mail Kent.Tvndall@duke-energy.com; or • Ms. Elizabeth Glenn, Environmental Specialist with our Environmental Permitting and Compliance Group, phone (980) 373-0530 or email Elizabeth.Glenn@duke-energy.com. Please direct all correspondence to Kent Tyndall via the mailing address shown above. / certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. / am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, r Jeffrey Flanagan Station Manager Weatherspoon's April 2021 Stormwater Discharge Monitoring Report (DMR) Submittal Table Page 1 of I Date of rainfall 4/1/2021 Actual stormwater discharge? N >72-hrs since last discharge? N Can sample w/i first 30- minutes? y Safe to sample? y Can sample w/i normal business hrs? y 4/11/2021 y y N N N 4/15/2021 IN y N y y 4/25/2021 N y N y N vz r r Nr I Is 47 - nl NI '0 t1 ca, as a U a H v o ?? c W �G U C aOE i bq v v� W o rn � a a a on a v W U O o a f Z a� uQ 3 w U �ww Q as �,gto on � O 151 o d Sol a° z4 E 0 M try � o E � a r s awl a'? o � a z G G Ha � a p O EGrr� y Z' z F A �i U E c� N M �+ V�crCon o z M O Vh• �� O tn M o z a N ON v 4F? h 0 otjo O o c a C ova � d Q 0 � F o U U � M O cl �n M ..Gi C sue, N C? G o z po 0 Z CC di Paw tn cc in E--q oz C-4 4) U u rA 00 � C-4 L. COO �T. t 40 go > cclq O C3 sw O ca Q go CJ co EA cz &w > ow ci ul _R gz cts C3 Z C3 W W wo gz '7E d ow c�n W w fl—Z ;. CV