Loading...
HomeMy WebLinkAboutNC0003433_Transfer of Water Between Basins_20210526 dr( DUKE Cape Fear Steam Electric Plant ift) ENERGY® 500CP&LR559 Moncure,NC 27559 PROGRESS May 21, 2021 Dr. Sergei Chernikov NC Division of Water Resources 1617 Mail Service Center RECEIVED Raleigh, NC 27699-1617 rviAY 2 6 2021 Subject: Duke Energy Progress, Inc. Cape Fear Steam Electric Plant NPDES Permit NC0003433 NCDEQIDWRINPDES NPDES Permit Update—Transfer of Water Between Basins Dear Dr. Chernikov: Duke Energy Progress, LLC. (Duke Energy) is submitting this letter to update the current permit application on file to include transfer of water from the 1956 inactive basin to Outfall 008. Historically, Duke Energy has been allowed to move water from basin to basin to help in the facilitation of the dewatering process. The proposed route for dewatering of the 1956 inactive basin uses this basin to basin approach. The water in the 1956 basin will be transferred to the 1978 basin and discharged to the Cape Fear River via Outfall 008 (see attached water transfer route). Duke Energy will adhere to the effluent conditions and monitoring requirements in permit Condition A (5) - Outfall 008 (dewatering) and requests that submittal of this letter meet the requirement for application file update and a permit modification not be required. If there are any questions regarding this letter, please contact Joyce Dishmon via phone at (336) 623-0238 or via email at joyce.dishmon@duke-energy.com. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Issa J. Zarzar GM CCP Project Management Attachment cc: Jessica Gaskin, PM Jonathan Stamas, Env Field Support Joyce Dishmon, EHS C&P EVOQUA TSS/pH 1956 INACTIVE BASIN ► 1978 INACTIVE BASIN ► MONITORING SYSTEM OUTFALL 008 CAPE FEAR RIVER BASIN TO BASIN WATER TRANSFER ROUTE NPDES APPLICATION FILE UPDATE - NC0003433 CAPE FEAR STEAM ELECTRIC PLANT MAY 2021