HomeMy WebLinkAboutNC0003433_Transfer of Water Between Basins_20210526 dr( DUKE Cape Fear Steam Electric Plant
ift)
ENERGY® 500CP&LR559
Moncure,NC 27559
PROGRESS
May 21, 2021
Dr. Sergei Chernikov
NC Division of Water Resources
1617 Mail Service Center RECEIVED
Raleigh, NC 27699-1617
rviAY 2 6 2021
Subject: Duke Energy Progress, Inc.
Cape Fear Steam Electric Plant NPDES Permit NC0003433 NCDEQIDWRINPDES
NPDES Permit Update—Transfer of Water Between Basins
Dear Dr. Chernikov:
Duke Energy Progress, LLC. (Duke Energy) is submitting this letter to update the current permit
application on file to include transfer of water from the 1956 inactive basin to Outfall 008.
Historically, Duke Energy has been allowed to move water from basin to basin to help in the facilitation of
the dewatering process. The proposed route for dewatering of the 1956 inactive basin uses this basin to
basin approach. The water in the 1956 basin will be transferred to the 1978 basin and discharged to the
Cape Fear River via Outfall 008 (see attached water transfer route).
Duke Energy will adhere to the effluent conditions and monitoring requirements in permit Condition A (5) -
Outfall 008 (dewatering) and requests that submittal of this letter meet the requirement for application file
update and a permit modification not be required. If there are any questions regarding this letter, please
contact Joyce Dishmon via phone at (336) 623-0238 or via email at joyce.dishmon@duke-energy.com.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
Issa J. Zarzar
GM CCP Project Management
Attachment
cc: Jessica Gaskin, PM
Jonathan Stamas, Env Field Support
Joyce Dishmon, EHS C&P
EVOQUA TSS/pH
1956 INACTIVE BASIN ► 1978 INACTIVE BASIN ►
MONITORING SYSTEM
OUTFALL
008
CAPE FEAR
RIVER
BASIN TO BASIN WATER TRANSFER ROUTE
NPDES APPLICATION FILE UPDATE - NC0003433
CAPE FEAR STEAM ELECTRIC PLANT
MAY 2021