Loading...
HomeMy WebLinkAboutNC0044776_Annual Report_20210527Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send an v other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative /1 YES ❑ NO ❑ NA 11 YES ❑ NO ❑ NA PPS Form /1 YES ❑ NO /1 YES ❑ NO SNCR /1 YES ❑ NO /1 YES ❑ NO IDSF ❑ YES ❑ NO ❑ YES ❑ NO Allocation Table ❑ YES ❑ NO ❑ YES ❑ NO Compliance Schedules ❑ YES ❑ NO /1 NA ❑ YES ❑ NO L NA Public Notice ❑ YES ❑ NO /1 NA ❑ YES ❑ NO /1 NA Program Information /1 YES ❑ NO /1 YES ❑ NO ❑ YES a NO Historical SNC /1 YES ❑ NO ❑ NA II YES ❑ NO ❑ NA ❑ YES II NO ❑ NA Regional Office: Washington POTW: Town of Hamilton NPDES Permit No. NC0044776 Report Period:1/1/2020 to 12/31/2020 ❑ Full ® Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). ❑ Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) A/ Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No 11 NA ❑ NOD ❑ NOV QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Could not answer question #1 due to Hamilton's Pretreatment Program is modified and the allocation table is not required to be submitted. Reviewed By:A4k� 5G 45..cA Date: 5/27/2021 Regional Pretreatment Annual Report Review Hamilton PAR 2020 Checksheet16