HomeMy WebLinkAboutNCC190790_NOT Closeout Documents_20210520North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Cumberland Project: Circle K - R&R 2720481 River basin: Cape Fear
Person financially responsible: Circle K Stores, Inc. - Meredith W Rice, VP Project #: CUNME-2019-150
NCC 190790
Address: 1100 Situs Court, Suite 100, Raleigh, NC 27606
1. Project Location: N. Main Street (NC-59), Hope Mills
Pictures: No
2. Weather and soil conditions: dry, workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: May 17, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities must be requested by the permittee via a Notice of Termination
(NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: May 11, 2021 Time arriving on site: 3:10 PM Time leaving site: 3:25 PM
cc: Michael Spell, Wesley Anderson (via email)