HomeMy WebLinkAboutNCC191344_NOT Closeout Documents_20210518North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Duplin Project: Wallace 230kV Substation- Permanent River basin: Cape Fear
Person financially responsible: Duke Energy Progress, LLC - Timothy Same, Project #: DUPLI-2020-004
Manager of Substation Engineering
Address: 410 South Wilmington Street, Raleigh, NC 27601
1. Project Location: 280 Mail Route Road, Wallace
Pictures: No
2. Weather and soil conditions: 70s clear dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
10. Comments: File closed
Reported by: Brian Lambe
Date of inspection: October 15, 2020
cc:
Title:
Date given/sent: October 20, 2020
Others present:
Time arriving on site: 3:40 PM Time leaving site: 4:00 PM