Loading...
HomeMy WebLinkAboutNCC193213_NOT Closeout Documents_20210518North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Duplin Project: Wallace 115kV Substation - Permanent River basin: Cape Fear Person financially responsible: Duke Energy Progress, LLC - Timothy Same, Project #: DUPLI-2020-013 Manager of Substation Engineering Address: 410 South Wilmington Street, Raleigh, NC 27601 1. Project Location: 4467 S NC 11 HWY, Wallace Pictures: No 2. Weather and soil conditions: 70s clear dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: File closed brian. Lambe @ncdenr.gov Reported by: Brian Lambe Date of inspection: October 15, 2020 cc: Title: Date given/sent: October 20, 2020 Others present: Time arriving on site: 3:30 PM Time leaving site: 3:40 PM