HomeMy WebLinkAbout20130314 Ver 1_Application_20130314
S TATE OF N ORTH C AROLINA
D EPARTMENT OF T RANSPORTATION
P AT L. M C C RORY A NTHONY J. T ATA
G OVERNOR S ECRETARY
MAILING ADDRESS:
NC D EPARTMENT O F T RANSPORTATION
P ROJECT D EVELOPMENT & E NVIRONMENTAL A NALYSIS U NIT
15 9 8 M AIL S ERVICE C ENTER
R ALEIGH NC 27699 -1548
T ELEPHONE : 919 -707 -6 0 00
FAX: 919 -2 12 -5785
W EBSITE :NCDOT .GOV
LOCATION:
C ENTURY C ENTER , B UILDING B
10 20 B IRCH R IDGE D RIVE
R ALEIGH NC 27610
March 14 , 2013
U. S. Army Corps of Engineers
Regulatory Field Office
69 Darlington Ave.
Wilmington, NC 28403
Attention: Mr. Ronnie Smith
NCDOT Coordinator
Dear Sir:
Subject: Application for Section 404 Nationwide Permits (NWP) 23 and Section 401
Water Quality Certification for the replacement of Bridge No. 288 and Bridge
No. 279 over Livingston Creek, SR 1831 (Swimming Hole Road) in Columbus
County ; TIP Project B -4 48 1 ; Federal Aid Project No. BR Z -18 3 1 (3 ); Debit $240
from WBS No. 38386.1.1 .
Please find enclosed PCN, permit drawings, stormwater management plan, roadway plans, and
EEP request letter for the above referenced project proposed by the North Carolina Departm ent
of Transportation (NCDOT). The EEP acceptance letter is forthcoming. A Categorical
Exclusion (CE) was completed for this project on September 19, 2012 and distributed shortly
thereafter. Additional copies are available upon request.
The NCDOT proposes to replace existing Bridge No. 288 over an overflow to Livingston Creek
and Bridge No. 2 79 over Livingston Creek on SR 1831 (Swimming Hole Road) in Columbus
County . The project involves r eplacement of the existing structurally deficient bridge s and
approaches with new structure s . The replacement structure for Bridge No. 279 will be
approximately 130 feet long providing a minimum 3 0 foot clear deck width. The replacement
structure for Bridge No. 2 88 will be approximately 85 feet long providing a minimum 30 foot
clear deck width. The bridge s will include two 1 0 -foot lanes and a minimum of 5 -foot offsets.
The approach roadway will extend approximately 140 feet from the west end of Bridge No. 279
and 124 feet from the east end of Bridge No. 288 . The approach s will be widened to include a
24 -foot pavement width providing two 12 -foot lanes . Six -foot shoulders will be provided on
e ach side(9 -foot shoulders where guardrail is included).
Proposed permanent impacts to riparian wetlands from bridge construction are 0.30 acre of fill ,
0 .02 a cre of excavation and 0.04 acre of mechanized clearing . Traffic will be detoured off -site
during construction.
1
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) nu mber: 23 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (ch eck all that apply):
401 Water Quality Certification – Regular Non -404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Ye s No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts ? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Replacement of Bridge No. 288 over a n overflow Swamp and Bridge No. 279
Livingston Creek on SR 1831 (Swimming Hole Rd.)
2b. County: Columbus
2c. Nearest municipality / town: Ransom
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B -4481
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC i f
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699 -1598
3f. Telephone no.: (919) 707 -61 40
3g. Fax no.: (919) 431 -2002
3h. Email address: jsmerrittt @ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
2
4. Applicant I nformation (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telepho ne no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
3
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 34.295294 ,
Longitude : -78.293434
1c. Property size: 2 8.36 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Livingston Creek
2b. Water Quality Classification of nearest receiving water: C, Sw
2c. Riv er basin: Cape Fear River Basin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Mixed undeveloped and agricultural
3b. List the total estimated acreage of all existing wetlands on the property:
13.14
3c. List the total estimated linear feet of all existing streams (intermittent an d perennial) on the property:
1,400
3d. Explain the purpose of the proposed project:
To replace a structurally deficient bridge s .
3e. Describe the overall project in detail, including the type of equipment to be use d:
The project involves replacing two bridge s on the existing alignment using an off -site detour. Standard road building
equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetla nd or stream determinations by the
Corps or State been requested or obtained for this property
/ project (including all prior phases) in the past?
Comments : A JD is requested with this application.
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): John Merritt
Age ncy/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained
for this project (inc luding all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
4
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non -404, other)
2f.
Area of impact
(acres)
Site 1 P T F ill riparian Yes
No
Corps
DWQ 0.30
Site 1 P T Excavation ripar ian Yes
No
Corps
DWQ 0.0 2
Site 1 P T Mechanized
Clearing r iparian Yes
No
Corps
DWQ 0.04
Site 1 P T Yes
No
Corps
DWQ
Site 2 P T Yes
No
Corps
DWQ
Site 6 P T Yes
No
Corps
DWQ
2g . Total wetland impacts 0.36
2h. Comments: There will be 0.53 ac . of hand clearing in wetlands. Additionall y, there will be of 0.05 acre of temporary fill in
wetlands in the hand c learing areas for the installation of erosion control measures, including Temporary Silt Fence and/or
Special Sediment Control Fence.
3. Stream Impacts
If there are perennial or inter mittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
interm ittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non -404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact
length (linear
feet)
S ite 1 P T PER
INT
Corps
DWQ
S ite 2 P T PER
INT
Corps
DWQ
S ite 3 P T PER
INT
Corps
DWQ
S ite 4 P T PER
INT
Corps
DWQ
S ite 5 P T PER
INT
Corps
DWQ
3h. Total stream and tributary impacts 0.0 Perm
0 .0 Temp
3i. Comments:
5
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, trib utaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P)
or Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Wat erbody type
4e.
Area of impact (acres)
O1 P T
O2 P T
O3 P T
O4 P T
4f. Total open water impacts
4g. Comments: There will be 11.0 sq. ft. of permanent fill due to proposed bridge piers
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Propos ed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit req uired?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6
6. Buffer Impacts (for DWQ)
If project will impact a p rotected riparian buffer , then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a .
Project is in which protected basin?
Neuse Tar -Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e .
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T Yes
No
B2 P T Y es
No
B3 P T Yes
No
6h. Total buffer impacts
6i. Comments:
7
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed bridge s are longer than the existing bridge s ; the propos ed bridge s will be at approximately the same grade
as the existing structure s ; an off site detour will be used. Slopes of 3:1 will be constructed in wetlands.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through cons truction techniques.
Sub regional tier design guidelines for bridge projects were used to develop this project. Best Management Practices for
the Protection of Surface Waters include replacement of bridge s along existing alignment, minimization of fill slopes and
use of hand clearing as opposed to mechanized clearing wherever possible .
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
If no, explain:
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used fo r this
project?
Mitigation bank
Payment to in -lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: EEP
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments is attach :
4.
4a. Approval letter from in -lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetl and mitigation requested: 0.72 a cre
4f. Non -riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments: The EEP request letter is attached and EEP acceptance letter is forthcoming.
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
8
6. Buf fer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then id entify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(s quare feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
9
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rul es?
Yes No
1b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments : Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
2e. Who will be responsible for the review of the Stormwater Management Pl an?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Whic h of the following locally -implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the appr oved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state -implemented stormwater management programs apply
(check all that a pply):
Coastal counties
HQW
ORW
Session Law 2006 -246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
10
F. Supplementary Information
1. Environmental Documentation (DWQ Re quirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the doc ument review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an afte r -the -fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative descriptio n.
Due to the minimal transportation impact resulting from this bridge s replacement, this project will neither influence nearby
land uses nor stimulate growth. The refore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed pro ject, or available capacity of the subject facility.
not applicable
Warm
Cool
Cold
TOTAL
New Mitigation Request
Revision to a current acceptance Date:
Comments:
NCDOT CONTACT INFORMATION
Telephone Number
Supervisor
E-Mail Address
Telephone Number
Project Manager
City, State, Zip
Mailing Address
Branch
Agency/Division
PDEA-NEU
NCDOT-Highways
REGULATORY CONTACT INFORMATION
NCDWQ Fax Number
City, State, Zip
Mailing Address
NCDWQ Contact
USACE Fax Number
City, State, Zip
Mailing Address
USACE Contact
USACE Office
Raleigh, NC 27699-1598
1598 Mail Service Center
PROJECT LOCATION INFORMATION AND IMPACTS
Current Let Date
TIP Description
TIP Number(s)
Cataloging Unit(s) (8-digit)
River Basin(s)
EEP Ecoregion(s)
County(ies)
Fill in requested information, print out the form, sign and date , and either mail to EEP, 1652 Mail Service Center, Raleigh, NC 27699-1652, or fax to 919-715-2219. Attachments
are acceptable for clarification purposes.
Total Buffer Impact
Zone 2 (square feet)
Zone 1 (square feet)
TRI-PARTY MOA (NCDOT)
MITIGATION REQUEST FORM
Revised 3/24/2008
NCDCM Project Number (if known)
OTHER INFORMATION
USACE Action ID Number (if known)
NCDWQ Project Number (if known)
Total Coastal Marsh Impact (acres)
Total Non-Riparian Wetland Impact (acres)
Total Riparian Wetland Impact (acres)
Electronic submissions are permissable; however, an acceptance letter cannot be sent until the original signed form has been received.
Total Stream (feet)
IMPORTANT
Check below if this request is a:
Signature of Applicant or Agent:
NCDOT Highway Division
John Merritt
(919) 707-6000
jsmerritt@dot.state.nc.us
Chris Rivenbark
(919) 707-6000
Regulatory Field Office
Ronnie Smith
Post Office Box 1890
Wilmington, NC 28401-1890
(910) 251-4025
B-4481
BRIDGE 279 OVER UT TO LIVINGSTON CREEK ON SR 1831
9/17/13
Division 6
Columbus
Southern Inner Coastal Plain
Cape Fear
03030005
0.36
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
S
e
p
t
e
m
b
e
r
2
0
1
1
)
B-
4
4
8
1
(
3
8
3
8
6
.
1
.
1
)
Co
u
n
t
y
(
i
e
s
)
:
Co
l
u
m
b
u
s
Page 1of 1
Pr
o
j
e
c
t
T
y
p
e
:
D
a
t
e
:
Ph
o
n
e
:
Ph
o
n
e
:
Em
a
i
l
:
Em
a
i
l
:
Co
u
n
t
y
(
i
e
s
)
:
CA
M
A
C
o
u
n
t
y
?
De
s
i
g
n
/
F
u
t
u
r
e
:
Ex
i
s
t
i
n
g
:
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
Wo
o
d
e
d
0.
2
m
i
l
e
s
74
0
0.
4
7
Pr
o
j
e
c
t
B
u
i
l
t
-
U
p
o
n
A
r
e
a
(
a
c
.
)
Pr
o
p
o
s
e
d
P
r
o
j
e
c
t
Ex
i
s
t
i
n
g
S
i
t
e
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
M
i
l
e
s
o
r
f
e
e
t
)
:
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
No
n
e
No
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
f
o
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
30
3
(
d
)
I
m
p
a
i
r
m
e
n
t
s
:
Ri
v
e
r
B
a
s
i
n
(
s
)
:
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
Cl
a
s
s
C
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
Ry
a
n
M
u
l
l
i
n
s
,
P
E
Ci
t
y
/
T
o
w
n
:
91
9
-
7
0
7
-
6
7
4
0
10
2
0
B
i
r
c
h
R
i
d
g
e
R
o
a
d
Ad
d
r
e
s
s
:
De
l
c
o
91
9
-
7
0
7
-
6
7
1
1
Co
l
u
m
b
u
s
ac.
Ge
n
e
r
a
l
P
r
o
j
e
c
t
N
a
r
r
a
t
i
v
e
:
Ty
p
i
c
a
l
C
r
o
s
s
S
e
c
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
:
Re
f
e
r
e
n
c
e
s
500
0.
6
1
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
v
e
h
/
h
r
/
d
a
y
)
:
ac
.
Th
e
p
r
o
j
e
c
t
c
o
n
s
i
s
t
s
o
f
r
e
l
a
c
i
n
g
B
r
i
d
g
e
#
2
7
9
a
n
d
B
r
i
d
g
e
#
2
8
8
o
n
S
R
1
8
3
1
o
v
e
r
L
i
v
i
n
g
s
t
o
n
C
r
e
e
k
w
i
t
h
a
p
p
r
o
x
i
m
a
t
e
l
y
1
5
0
'
o
f
a
p
p
r
o
ach work on the west side of the structure
an
d
1
5
0
'
o
n
t
h
e
e
a
s
t
s
i
d
e
.
T
h
e
a
p
p
r
o
a
c
h
w
o
r
k
w
i
l
l
c
o
n
s
i
s
t
o
f
r
a
is
i
n
g
t
h
e
e
x
i
s
t
i
n
g
r
o
a
d
w
a
y
g
r
a
d
e
a
n
d
p
r
o
v
i
d
i
n
g
g
r
a
s
s
s
h
o
u
l
d
e
r
s
a
nd
g
u
a
r
d
r
a
i
l
s
.
B
r
i
d
g
e
#
2
7
9
e
x
i
s
t
i
n
g
6
s
p
a
n
st
r
u
c
t
u
r
e
(
1
0
3
'
t
o
t
a
l
l
e
n
g
t
h
)
w
i
l
l
b
e
r
e
p
l
a
c
e
d
w
i
t
h
a
3
s
p
a
n
(
1
@3
0
'
,
1
@
6
5
'
,
1
@
3
5
'
)
t
o
t
a
l
1
3
0
'
-
2
1
"
a
n
d
2
4
"
c
o
r
e
d
s
l
a
b
b
r
i
d
g
e
.
B
r
i
d
g
e
#
2
8
8
e
x
i
s
t
i
n
g
4
s
p
a
n
s
t
r
u
c
t
u
r
e
(
7
0
'
t
o
t
a
l
le
n
g
t
h
)
w
i
l
l
b
e
r
e
p
l
a
c
e
d
w
i
t
h
a
2
s
p
a
n
(
1
@
5
5
'
,
1
@
3
0
'
)
t
o
t
a
l
85
'
-
2
1
"
c
o
r
e
d
s
l
a
b
b
e
i
d
g
e
.
B
r
i
d
g
e
#
2
7
9
r
e
d
u
c
e
s
t
h
e
n
u
m
b
e
r
o
f
b
e
n
ts
i
n
L
i
v
i
n
g
s
t
o
n
C
r
e
e
k
f
r
o
m
3
t
o
1
.
B
r
i
d
g
e
#
2
8
8
re
d
u
c
e
s
t
h
e
n
u
m
b
e
r
o
f
b
e
n
t
s
i
n
w
a
t
e
r
f
r
o
m
3
b
e
n
t
s
t
o
1
.
Be
s
t
M
g
m
t
.
P
r
a
c
t
i
c
e
s
:
-P
r
o
m
o
t
i
o
n
o
f
s
h
e
e
t
f
l
o
w
a
n
d
i
n
f
i
l
t
r
a
t
i
o
n
w
i
t
h
g
r
a
s
s
e
d
s
h
o
u
l
d
e
r
s
ex
c
e
p
t
w
h
e
r
e
s
h
o
u
l
d
e
r
b
e
r
m
g
u
t
t
e
r
t
o
2
G
I
'
s
o
n
n
o
r
t
h
w
e
s
t
,
s
o
u
t
h
we
s
t
,
n
o
r
t
h
e
a
s
t
,
a
n
d
s
o
u
t
h
e
a
s
t
q
u
a
d
r
a
n
t
s
o
f
br
i
d
g
e
#
2
7
9
.
A
s
w
e
l
l
a
s
,
s
h
o
u
l
d
e
r
b
e
r
m
g
u
t
t
e
r
t
o
2
G
I
'
s
o
n
n
o
r
t
h
e
a
s
t
a
n
d
s
o
u
t
h
e
a
s
t
q
u
a
d
r
a
n
t
s
o
f
b
r
i
d
g
e
#
2
8
8
.
-D
r
a
i
n
a
g
e
s
y
s
t
e
m
s
o
u
t
l
e
t
t
o
r
i
p
r
a
p
p
a
d
s
.
-E
l
i
m
i
n
a
t
e
d
D
e
c
k
D
r
a
i
n
s
o
n
b
r
i
d
g
e
.
-R
e
m
o
v
a
l
o
f
e
x
i
s
t
i
n
g
r
o
a
d
f
i
l
l
u
n
d
e
r
b
r
i
d
g
e
s
w
i
l
l
i
m
p
r
o
v
e
b
r
i
dg
e
c
o
n
v
e
y
a
n
c
e
a
n
d
r
e
d
u
c
e
b
r
i
d
g
e
o
p
e
n
i
n
g
v
e
l
o
c
i
t
i
e
s
.
-2
:
1
s
i
d
e
s
l
o
p
e
s
w
i
t
h
r
o
c
k
p
l
a
t
i
n
g
u
s
e
d
i
n
s
e
c
t
i
o
n
o
n
r
i
g
h
t
s
i
de
t
o
m
i
n
i
m
i
z
e
i
m
p
a
c
t
s
t
o
e
x
i
s
t
i
n
g
e
p
h
e
m
e
r
a
l
d
r
a
i
n
a
g
e
c
h
a
n
n
e
l
a
n
d
w
e
t
l
a
n
d
s
.
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
Ga
l
e
n
C
a
i
l
,
P
E
Ro
a
d
w
a
y
W
i
d
e
n
i
n
g
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ad
d
r
e
s
s
:
2/26/2013
10
2
0
B
i
r
c
h
R
i
d
g
e
R
o
a
d
Ra
l
e
i
g
h
N
C
2
7
6
1
0
Ra
l
e
i
g
h
,
N
C
2
7
6
1
0
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
NC
D
O
T
C
o
n
t
a
c
t
:
Pr
o
j
e
c
t
N
o
.
:
B-
4
4
8
1
(
3
8
3
8
6
.
1
.
1
)
Co
n
t
r
a
c
t
o
r
/
D
e
s
i
g
n
e
r
:
gc
a
i
l
@
n
c
d
o
t
.
g
o
v
Ca
p
e
F
e
a
r
18
-
6
4
rm
u
l
l
i
n
s
@
n
c
d
o
t
.
g
o
v
10
'
T
r
a
v
e
l
L
a
n
e
s
,
6
'
G
r
a
s
s
S
h
o
u
l
d
e
r
s
,
3
:
1
Si
d
e
S
l
o
p
e
s
T
y
p
i
c
a
l
,
2
:
1
S
i
d
e
S
l
o
p
e
s
w
i
t
h
ro
c
k
p
l
a
t
i
n
g
o
n
s
e
l
e
c
t
s
e
c
t
i
o
n
s
.
9'
T
r
a
v
e
l
L
a
n
e
s
,
4
'
G
r
a
s
s
e
d
S
ho
u
l
d
e
r
s
,
3
:
1
a
n
d
2
:
1
S
i
d
e
S
l
o
p
e
s
.
N/
A
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
N
o
.
:
Su
p
p
l
e
m
e
n
t
a
l
:
Sw
a
m
p
W
a
t
e
r
s
(
S
w
)
Pr
i
m
a
r
y
:
Li
v
i
n
g
s
t
o
n
C
r
e
e
k
BEGIN BRIDGE END BRIDGE
BEGIN BRIDGE END BRIDGE
11
76
C r ee k
76
S R 18
2
4
S R 183
0
S R 1838
S R
1881
S R
1
83
7
W a t e r
L I V I N G S
T
O N
CR
E
E
K
L I V
I N
G
S
T
O
N
C
R
E
E
K
76 76
T a nk R d .
R d .H o l e
S w i mm i ng
S R 1831
R d .
C h a p e l
L i v i n g s t on
S
R
18
4
3
C r e e k
Creek Dans
M ill
L i v i ng s t o n
S
R 1843
C r ee k L i v i ng s t on L i
v i
n
g s t
on
C h a p e l
R d .
C r ee k
-L-
FREEMAN
W a t e r T a n k R d .
Livingston C r
e
e
k
SR 1831 SWIMMING HOLE RD.
L i v i n g s t on
L i v i ng s t on
C r e e k
B
r
a
n
c
h
B i g
S a nd H o l e R d .R d .B l a nk
O
s
c
a
r
No. 279 No. 288
VICINITY MAP DETOUR ROUTE
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
T O
W A TE R
T ANK
R D
.
S R
1824
BRIAN P. ROBINSON
REKHA PATEL, PE
BRIDGE NO. 279 & NO. 288 OVER LIVINGSTON
CREEK AND APPROACHES ON SR 1831
(SWIMMING HOLE ROAD)
25 50 100 50
25 50 100 50
5 10 20 10
DHV
D
T
V
=
=
=
=
=
=
500
740
11
65
60
%
%
MPH
ADT
ADT
2013
2033
% *
DUAL 2%
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
* TTST =1%
SUB REGIONAL TIER
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
B-4481 DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
0 0
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
1000 Birch Ridge Dr., Raleigh NC, 27610
C
O
N
T
R
A
C
T
:
T
I
P
P
R
O
J
E
C
T
:
B
-
4
4
8
1
D
E
P
A
R
T
M E N
T
O
F T R A N S P O R T A
T
I O
N
S T A T E O F N O R T H
C A R
O
L I
N
A
FUNC CLASS = RURAL LOCAL
3
BEGIN TIP PROJECT B-4481
END TIP PROJECT B-4481
4
-L- STA 13+00.00
-L- STA. 23+50.00
GRADING, DRAINAGE, PAVING, AND STRUCTURES
See Sheet 1-A For Index of Sheets
See Sheet 1-B For Conventional Symbols
LOCATION
PROJECT
TO LIVINGSTON CHAPEL RD.
SR 1843
PE BRZ-1831(3)38386.1.1
38386.2.1 BRZ-1831(3)R/W & UTIL
SEPTEMBER 17, 2013
-L- STA. 14+45.75 -L- STA. 15+78.25
-L- STA. 21+25.31 -L- STA. 22+12.69
LENGTH STRUCTURES TIP PROJECT B-4481 = 0.042 MI.
TOTAL LENGTH TIP PROJECT B-4481 = 0.199 MI.
LENGTH ROADWAY TIP PROJECT B-4481 = 0.157 MI.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
JANUARY 18, 2013
WETLAND AND SURFACE WATER IMPACTS PERMIT
SHEETOF __
PERMIT DRAWING
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
t
s
h
.
d
g
n
r
m
u
l
l
i
n
s
3
/1
3
/2
0
1
3
SITE 1
11
COLUMBUS COUNTY
N
A
D 8
3 / 9
5
END LOCATION
15+88| -L-21+14| -L-
20+25| -L-21+14| -L-
22+23| -L-23+00| -L-
BEGIN
RT
LT
LT, RT
TOE PROTECTION LOCATIONS
GROUND LINE
FACE
GUARDRAIL
1’ CLEARANCE MIN
2’
EMBANKMENT
STEEL BEAM GUARDRAIL
GEOTEXTILE FOR ROCK PLATING
(TOE OF SLOPE)
SLOPE STAKE POINT
BREAK POINT (TOP OF SLOPE)
SHOULDER OR BERM
F
L A
TTE
R
F I
LL
S
L O
P
E
2 :
1 (
H :
V )
O
R
I
F
N
E
C E
SS
A
R
Y
5 ’
OV
E
R L A
P
M I
N
OVERLAP DETAIL
SEE GEOTEXTILE
1.5’ SELECT MATERIAL, CLASS IV (ABC)
3.5’ MIN
E
I
G N E E R SEAL
N
L
A N O I
S S E F O R P
A
N I L
O R A C H T R O N
32171
K R A P G N U O Y
N
I J
(PLAN VIEW)
MIN (TYP)
18" OVERLAP
TOP OF SLOPE
TOE OF SLOPE
MIN (TYP)
5’ OVERLAP
ROLL WIDTH
GEOTEXTILE OVERLAP DETAIL
ROCK PLATING (TYP)
GEOTEXTILE FOR
TYPICAL SECTION FOR SPECIAL ROCK PLATING
SETTLEMENT
ANTICIPATED
RIP RAP PLACEMENT
GEOTEXTILE BEFORE
END OF EXTENDED
RIPRAP, CLASS 2
2.0’ MIN. THICK
PLAIN RIP RAP, CLASS 2
ROCK PLATING, TYPE 2
GEOTEXTILE FOR
ESTIMATED QUANTITIES
SELECT MATERIAL, CLASS IV
3,080 SY
1,880 TONS
390 TONS
2’
SHEET PROJECT REFERENCE NO.
B-4481
GEOTECHNICAL
ENGINEER ENGINEER
SIGNATURE DATE SIGNATURE DATE
REVISIONS
NO.BY DATE
1
2
NO.BY DATE
3
4
J. PARK
J. BATTS
09/2012
09/2012
PREPARED BY:
REVIEWED BY:
DATE:
DATE:
GEOTECHNICAL ENGINEERING UNIT
X
EASTERN REGIONAL OFFICE
WESTERN REGIONAL OFFICE
D
E
P
A
R T
M E
N
T O F T R A N S P O R T
A T
I O
N
S
T
A T
E O F N O R T H
C
A R O
L I
N
A
RALEIGH
DEPARTMENT OF TRANSPORTATION
STATE OF NORTH CAROLINA
CONTRACT OFFICE
DETAIL
SPECIAL ROCK PLATING
BRIDGE END BENT RIP RAP SLOPE PROTECTION.
SPECIAL ROCK PLATING SHALL BE TIED INTO THE
PLATING SPECIAL PROVISION.
FOR SPECIAL ROCK PLATING, SEE SPECIAL ROCK
2-A
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I T
S
_
E
n
v
i r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
G
E
O
_
R
D
W
Y _
S
p
e
c
i
a
l
_
R
P
.
d
g
n
r
m
u
ll
i
n
s
3
/1
3
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
R
E
V
I S
I
O
N
S
HYDRAULICS ROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4481
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
N
A
D 8
3 / 9
5
NOTE: SEE SHEET 5 FOR -L- PROFILE
WETLAND
DENOTES FILL IN F F
R :
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R M
I T
S
_
E
n
v
i r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
.
d
g
n
r
m
u
ll
i
n
s
3
/1
4
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
E E IN WETLAND
DENOTES EXCAVATION
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED ***
*
***
***
*
SITE 1
15
2
0
2
5
GRAU TL-3
GRAU TL-3 TYPE-III
TYPE-III
TYPE-III
TYPE-III
BM 81
TYPE-III
TYPE-III
TYPE-III
TYPE-III GRAU TL-3
GRAU TL-3
BM 80
.
0
5
.0
6
.
0
4
.
0
3
.
0
2
.
0
2
.
0
1
.
0
0
.0
1
.0
2
.
0
2
.
0
3
.
0
4
.
0
2
.
0
2
.
0
2
S
E
E
X
.
0
2
.
0
2
E
X
S
E
TB 2GI
TB 2GI
TB 2GI
TB 2GI
TB 2GI
TB 2GI
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
w
/ E
l
b
o
w
s
1
5
"
w
/ E
l
b
o
w
s
15
"
w / E l bo w s
15"
ELB
EL
B
ELB
ELB
ELB
ELB
w/ Elbows
15"
ELB
ELB
w
/ E
l
b
o
w
s
1
5
"
ELB
ELB
w / E l bo w s
15 "
ELB
ELB
11
0
’
R
/
W
BRIDGE NO 279
L I V I N
G
S
T
O
N
C
R
E
E
K
L
I V
I N
G
S
T
O N
C
R
E
E
K
W OOD S
WOODS
W OOD S
W OOD S
BOBBY RAY MOORE
DB 241 PG 389
DB 139 PG 598
W PARNELL APPLEWHITE
W PARNELL APPLEWHITE
DB 139 PG 598
BOBBY RAY MOORE
DB 241 PG 389
SR 1831 SWIMMINGHOLE RD
T O W A TE R T ANK R D
EXISTING R/W
EXISTING R/W EXISTING R/W
EXISTING R/W
N E L S O N A PP L E W H I TE J R
D B 484 P G 52 9
6
0
.
0
0
’
R
/
W
BRIDGE NO 288
9 ’S O I L
WD WW
WD WW
WD WW
WD WW
SEAT ELEV. 31.09
SEAT ELEV. 31.05
SEAT ELEV. 31.04
SEAT ELEV. 31.07
-EL-
SEAT=31.26’S E A T =31 .28 ’
S E A T =31 .24 ’S E A T =31 .25 ’
ELEV=23.05
T O P O F W A T E R
u p l a n d
F
F
F
F
F
F
F
F
F
F
F
F
R
E
V
I S
I
O
N
S
HYDRAULICS ROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4481
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
N
A
D 8
3 / 9
5
NOTE: SEE SHEET 5 FOR -L- PROFILE
WETLAND
DENOTES FILL IN F F
R :
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R M
I T
S
_
E
n
v
i r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
.
d
g
n
r
m
u
ll
i
n
s
3
/1
4
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
E E IN WETLAND
DENOTES EXCAVATION
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED ***
*
***
***
*
SITE 1
15
2
0
2
5
GRAU TL-3
GRAU TL-3 TYPE-III
TYPE-III
TYPE-III
TYPE-III
BM 81
TYPE-III
TYPE-III
TYPE-III
TYPE-III GRAU TL-3
GRAU TL-3
BM 80
.
0
5
.0
6
.
0
4
.
0
3
.
0
2
.
0
2
.
0
1
.
0
0
.0
1
.0
2
.
0
2
.
0
3
.
0
4
.
0
2
.
0
2
.
0
2
S
E
E
X
.
0
2
.
0
2
E
X
S
E
TB 2GI
TB 2GI
TB 2GI
TB 2GI
TB 2GI
TB 2GI
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
w
/ E
l
b
o
w
s
1
5
"
w
/ E
l
b
o
w
s
15
"
w / E l bo w s
15"
ELB
EL
B
ELB
ELB
ELB
ELB
w/ Elbows
15"
ELB
ELB
w
/ E
l
b
o
w
s
1
5
"
ELB
ELB
w / E l bo w s
15 "
ELB
ELB
11
0
’
R
/
W
BRIDGE NO 279
L I V I N
G
S
T
O
N
C
R
E
E
K
L
I V
I N
G
S
T
O N
C
R
E
E
K
W OOD S
WOODS
W OOD S
W OOD S
BOBBY RAY MOORE
DB 241 PG 389
DB 139 PG 598
W PARNELL APPLEWHITE
W PARNELL APPLEWHITE
DB 139 PG 598
BOBBY RAY MOORE
DB 241 PG 389
SR 1831 SWIMMINGHOLE RD
T O W A TE R T ANK R D
EXISTING R/W
EXISTING R/W EXISTING R/W
EXISTING R/W
N E L S O N A PP L E W H I TE J R
D B 484 P G 52 9
6
0
.
0
0
’
R
/
W
BRIDGE NO 288
9 ’S O I L
WD WW
WD WW
WD WW
WD WW
SEAT ELEV. 31.09
SEAT ELEV. 31.05
SEAT ELEV. 31.04
SEAT ELEV. 31.07
-EL-
SEAT=31.26’S E A T =31 .28 ’
S E A T =31 .24 ’S E A T =31 .25 ’
ELEV=23.05
T O P O F W A T E R
u p l a n d
F
F
F
F
F
F
F
F
F
F
F
F
1
2
1 3
1 4
14
1 5 1 5
1
5
1
6
1 6
16
17
1 7
1 7
17
18
1
8
1 8
18
18
18
18
1
9
1
9
1 9
19
19
1 9
19
19 1 9
19
2
0
2
0
2
0
2
0
20
2
0
2
0
20
20 2 0
20
20
20
20 2
0
2 0
20
2 0
2 0
2
0
2
1
2
1
2
1
2
1
2 1
21
21
21 21
21
2 1
21
21
2 2
22
22
2
2
2
2
2
2
22
22
22
22 22 22
22
22
22
2 2
2 2
2
2
2
2
2 2
22
22
22
22
2 3
23 23 23
23
23
23
2 3
23
2
3
2
3
2
3
23
2 3
23 23
2 3
23
2 3
2
3
2 3
23
23
2
3
23
2
3
23
2
3
2 3
23
2
3
2 3
24
2
4
2
4
24
2 4
2
4
24 24 24
2
4
2 4
24 24
2 4
24
24
24 24
24
24
2
4
2
4
24
24 2 4
24
24
24
24
24
24
2 4
2
4
24
24
24
2
4
24
2 4
25
2 5
25
25
25
25
25
2 5
25
25
2
5
25
25
25
25
25
25 25
2 5 2
5
25
2
5
2 5
25
25
25
25
25
25
2
5
25
25
25
25 25
2
5
25
2
5
2
5
2
5
2 5
25 25
25 25
25
2 5
25
25 25 25 25
2
5
25 2 5
2
5
25
2
5
25
2 5
25 25
2
5
2 5
2
5
25
25
25
25
25
25
2
5
2
5
2
5
25
2
6
2 6
26
26
2
6
2 6
26 2 6
26
26
2 6
26
26
2
6
26
26
26
26
26
2 6
26
26 26 26
26 26
2
6
2
6
2 6
2 6
2
6
26
2 6
2
6
26
26
2
6
2 6
27
27 27
27
27 27
2
7
2 7
2
7
27
27
27
27
2 7
2 7
2
7
2 7
27
27
27
27
27 27 27
27 27
2
7
2
7
27
27
2 7
27
2 7
2
7 2 7 2
7
2
7
27
27
28
28
28
28
28
28
2 8
28
28
2 8
2 8
28
2 8
2
8
28
28
28
28
2 8
2
8
28
2 8
28
2 8
28
28 28 28
28 28
2
8
2
8
28
28
2
8
2 8
2 8
2 8
2 8
2
8
2 8
29
29
2 9
29
2
9
29
29
29
29
29
29
2
9
29
29
2
9
2 9
2
9
2
9
29
2 9
2
9
29 29 29
29 29
2 9
2
9
29
2
9
2 9
2
9
2
9
29
2 9
29
2
9
3 0
3 0
30
3 0
30
30 30 30
30 30 30
30
30
3 0
30
30
30
30
30 30 30
3
0
3
0
3 0
3 0
3
0
30
3
0
30
3 0 30
3
0
30
30
30 30 30 30 30 30
30
30
30
3
0
30
3
0
30
3 0
30
31
31
3
1
31
31
31
3
1
3 1
31
31
31 3 1
31 31 31
31
31
3 1
3 1
3 1
31
32
32
32 32
32
32
3
2
32
32
32
32
32
32
3 2
33
3 3 3 3 33
33
33
33
R
E
V
I S
I
O
N
S
HYDRAULICS ROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4481
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
N
A
D 8
3 / 9
5
WETLAND
DENOTES FILL IN F F
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
-
2
7
9
.
d
g
n
r
m
u
l
l
i
n
s
3
/1
3
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
E E IN WETLAND
DENOTES EXCAVATION
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED ***
*
***
***
*
1"=25’
0’25’50’75’25’
15
GRAU TL-3
GRAU TL-3 TYPE-III
TYPE-III
TYPE-III
TYPE-III
.
0
2
.
0
3
.
0
4
.
0
2
.
0
2
.
0
2
S
E
E
X
.
0
2
.
0
2
TB 2GI
TB 2GI
TB 2GI
TB 2GI
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
w
/ E
l
b
o
w
s
1
5
"
w
/ E
l
b
o
w
s
1
5
"
ELB
EL
B
ELB
ELB
w/ Elbows
15"
ELB
ELB
w
/ E
l
b
o
w
s
1
5
"
ELB
ELB
11
0
’
R
/
W
BRIDGE NO 279
L
I V
I N
G
S
T
O
N
C
R
E
E
K
L
I V
I N
G
S
T
O
N
C
R
E
E
K
W OOD S
W OOD S
W OOD S
W OOD S
BOBBY RAY MOORE
DB 241 PG 389
DB 139 PG 598
W P A R N ELL A PP LE W H I TE
W P A R N ELL A PP LE W H I TE
DB 139 PG 598
BOBBY RAY MOORE
DB 241 PG 389
SR 1831 SWIMMINGHOLE RD
EXISTING R/W
EXISTING R/W
EXISTING R/W
N E L S O N A PP LE W H I T E J R
D B 484 P G 529
-EL-
S E A T =31 .26 ’S E A T =31 .28 ’
S E A T =31 .24 ’S E A T =31 .25 ’
E LE V =23 .05
T O P O F W A TE R
F
F
F
F
F
F
R
E
V
I S
I
O
N
S
HYDRAULICS ROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4 B-4481
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
N
A
D 8
3 / 9
5
WETLAND
DENOTES FILL IN F F
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
-
2
8
8
.
d
g
n
r
m
u
l
l
i
n
s
3
/1
4
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
E E IN WETLAND
DENOTES EXCAVATION
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED ***
*
***
***
*
1"=25’
0’25’50’75’25’
2
0
2
5
BM 81
TYPE-III
TYPE-III
TYPE-III
TYPE-III GRAU TL-3
GRAU TL-3
.
0
5
.0
6
.
0
4
.
0
3
.
0
2
.
0
2
.
0
1
.
0
0
.0
1
.0
2
E
X
S
E
TB 2GI
TB 2GI
To Elev. = 28.0’
Rip Rap
CL II
To Elev. = 28.0’
Rip Rap
CL II
w / E l b o w s
1 5 "
O
ELB
ELB
w / E l bo w s
15 "
ELB
ELB
11
0
’
R
/
W
W OOD S
DB 139 PG 598
W P A R N ELL A PP LE W H I TE
W P A R N ELL A PP LE W H I TE
DB 139 PG 598
T O W A TE R T ANK R D
6
0
.
0
0
’
R
/
W
BRIDGE NO 288
9 ’S O I L
WD WW
WD WW
WD WW
WD WW
S E A T ELE V . 31 .09
S E A T ELE V . 31 .05
S E A T ELE V . 31 .04
S E A T ELE V . 31 .07
up l a nd
N O TE : S EE S H EET 5 F O R -L - P R O F I LE
F
F
F
F
F
F
PI = 15+00.00
EL = 33.68’
VC = 250’
K = 327
-L-
EL. 31.93’
-L- Sta. 23+50.00
END GRADE
(AS CALCULATED BY ROADWAY)
-L- STA. 10+77.26 (30.77’ RT)
-BL- STA. 7+03.96 (44.83’ RT) =
R/R SPIKE IN BASE OF 18" GUM,
BENCHMARK # 80 EL. = 32.05’
(AS CALCULATED BY ROADWAY)
-L- STA. 20+83.16 (26.25’ LT)
-BL- STA. 17+09.90 (13.98’ LT) =
R/R SPIKE IN BASE OF 15" GUM,
BENCHMARK # 81 EL. = 29.65’
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-50
-40
-30
-20
-10
0
10
20
30
40
PI = 21+60.00
EL = 33.86’
VC = 300’
K = 228
EL. 32.86’
-L- Sta. 13+00.00
BEGIN GRADE
(+)0 .4100 %(-)0 .3 545 %
PI = 17+75.00
EL = 32.70’
(+)0 .3000 %
VC = 180’
K = 275
(-)1 .0158 %
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICS ROADWAY DESIGN
ENGINEER ENGINEER
5 B-4481
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
NOTE: SEE SHEET 4 FOR PLAN VIEW
Elev. = 33.44’
Skew = 90°
1@30’ - 21"; 1@65’ - 24"; 1@35’ - 21" Cored Slab
{ Sta. 15+12
Elev. = 33.33’
Skew = 90°
1@55’; 1@30’ - 21" Cored Slab
{ Sta. 21+69
RIP RAP
CLASS ll
1.5:1 1.5:1
NWS = 22.6’
RIP RAP
CLASS ll
1.5:1 1.5:1
Excavation
Excavation Excavation
Excavation
SHEET __ OF __
PERMIT DRAWING
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
B
4
4
8
1
_
H
y
d
_
p
r
m
_
p
f
l
.
d
g
n
r
m
u
l
l
i
n
s
3
/1
3
/2
0
1
3
R
:
\
H
y
d
r
a
u
li
c
s
\
P
E
R
M
I T S
_
E
n
v
i
r
o
n
m
e
n
t
a
l\
D
r
a
w
i n
g
s
\
b
4
4
8
1
_
H
y
d
_
p
r
m
_
x
p
l
.
d
g
n
r
m
u
l
l
i
n
s
3
/14
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
30 30
35 35
25 25 12+50.00
25 25
30 30
35 35
13+00.00
25 25
30 30
35 35
40 40
20 20
13+50.00
25 25
30 30
35 35
40 40
14+00.00
25 25
30 30
35 35
40 40
14+45.75
X-1 B-4481
-L-
2.5 5
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
-L- STA. 13+00.00
BEGIN PROJECT B-4481
-L- STA. 14+45.75
BEGIN BRIDGE
32.79
32.76 VA R .E X I S T .E X I S T .
VA R
.
32.91
3 :
1
0 .030 0 .020
T I E T O E X .
33.06 3 :1
3 :
1
0 .020 0 .020
33.04 3 :1
3 :
1
0 .020 0 .0 2 0
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
30 30
35 35
25 25 12+50.00
25 25
30 30
35 35
13+00.00
25 25
30 30
35 35
40 40
20 20
13+50.00
25 25
30 30
35 35
40 40
14+00.00
25 25
30 30
35 35
40 40
14+45.75
X-1 B-4481
-L-
2.5 5
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
-L- STA. 13+00.00
BEGIN PROJECT B-4481
-L- STA. 14+45.75
BEGIN BRIDGE
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
30 30
35 35
25 25 12+50.00
25 25
30 30
35 35
13+00.00
25 25
30 30
35 35
40 40
20 20
13+50.00
25 25
30 30
35 35
40 40
14+00.00
25 25
30 30
35 35
40 40
14+45.75
X-1 B-4481
-L-
2.5 5
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
-L- STA. 13+00.00
BEGIN PROJECT B-4481
-L- STA. 14+45.75
BEGIN BRIDGE
R
:
\
H
y
d
r
a
u
li
c
s
\
P
E
R
M
I T S
_
E
n
v
i
r
o
n
m
e
n
t
a
l\
D
r
a
w
i n
g
s
\
b
4
4
8
1
_
H
y
d
_
p
r
m
_
x
p
l
.
d
g
n
r
m
u
l
l
i
n
s
3
/14
/2
0
1
3
SHEET __ OF __
PERMIT DRAWING
SHEET __ OF __
PERMIT DRAWING
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I T
S
_
E
n
v
i r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
b
4
4
8
1
_
H
y
d
_
p
r
m
_
x
p
l .
d
g
n
r
m
u
ll
i
n
s
3
/1
4
/2
0
1
3
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
15 15
20 20
25 25
30 30
35 35
40 40
10 10
15+00.00
25 25
30 30
35 35
40 40
15+50.00
25 25
30 30
35 35
40 40
15+78.25
25 25
30 30
35 35
40 40
16+00.00
X-2 B-4481
-L-
2.5 5
-L- STA. 15+78.25
END BRIDGE
17.30
0 .020 0 .020
23.98
0 .020 0 .02 0
32.98
2 :
1
0 .020 0 .020
T I E T O E X .
32.79
2 :
1
0 .020 0 .0 2 0
T I E T O E X .
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
15 15
20 20
25 25
30 30
35 35
40 40
10 10
15+00.00
25 25
30 30
35 35
40 40
15+50.00
25 25
30 30
35 35
40 40
15+78.25
25 25
30 30
35 35
40 40
16+00.00
X-2 B-4481
-L-
2.5 5
-L- STA. 15+78.25
END BRIDGE
0 0
0 0
5 5
5 5
10 10
10 10
15 15
15 15
20 20
20 20
25 25
25 25
30 30
30 30
35 35
35 35
40 40
40 40
45 45
45 45
50 50
50 50
55 55
55 55
60 60
60 60
65 65
65 65
70 70
70 70
75 75
75 75
$
$
$
$
$
$
S
Y
S
T
I M
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
2
3
/
9
9 PROJ. REFERENCE NO.SHEET NO.0
15 15
20 20
25 25
30 30
35 35
40 40
10 10
15+00.00
25 25
30 30
35 35
40 40
15+50.00
25 25
30 30
35 35
40 40
15+78.25
25 25
30 30
35 35
40 40
16+00.00
X-2 B-4481
-L-
2.5 5
-L- STA. 15+78.25
END BRIDGE
SHEET __ OF __
PERMIT DRAWING
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I T
S
_
E
n
v
i r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
b
4
4
8
1
_
H
y
d
_
p
r
m
_
x
p
l .
d
g
n
r
m
u
ll
i
n
s
3
/1
4
/2
0
1
3
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
1
3
+
0
0
t
o
2
3
+
5
0
-
L
t
&
R
t
-
0
.
3
0
0
0
.
0
2
0
0
.
0
4
0
0
.
5
3
0
TO
T
A
L
S
:
0
.
3
0
0
.
0
2
0
.
0
4
0
.
5
3
Im
p
a
c
t
s
D
u
e
t
o
P
r
o
p
o
s
e
d
B
r
i
d
g
e
P
i
e
r
s
=
1
1
.
0
s
q
.
f
t
.
0.
0
5
a
c
r
e
o
f
T
e
m
p
o
r
a
r
y
F
i
l
l
i
n
W
e
t
l
a
n
d
s
i
n
t
h
e
H
a
n
d
C
l
e
a
r
i
n
g
a
r
e
a
s
f
o
r
e
r
o
s
i
o
n
c
o
n
t
r
o
l
m
e
a
s
u
r
e
s
.
AT
N
R
e
v
i
s
e
d
3
/
3
1
/
0
5
SH
E
E
T
3/12/2013 COLUMBUS COUNTY
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DIVISION OF HIGHWAYS
WB
S
-
3
8
3
8
6
.
1
.
1
(
B
-
4
4
8
1
)
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
SU
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
WE
T
L
A
N
D
I
M
P
A
C
T
S
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
B
E
G
I
N
B
R
I
D
G
E
E
N
D
B
R
I
D
G
E
11 76 C r e e k 11 76 S R 1 8 2 4 S R 1 8 3 0 S R 1 8 3 8 S R 1 8 8 1 S R 1 8 3 7 W a t e r 76 76 T a n k R d .R d .H o l e S w i m m i n g SR 1831 R d .C h a p e l L i v i n g s t o n S R 1 8 4 3 C r e e k Creek Dans M i l l L i v i n g s t o n S R 1 8 4 3 C r e e k L i v i n g s t o n L i v i n g s t o n C h a p e l R d .C r e e k
-
L
-
FREEMAN W a t e r T a n k R d .Livingston C r e e k
S
R
1
8
3
1
S
W
I
M
M
I
N
G
H
O
L
E
R
D
.
L i v i n g s t o n L i v i n g s t o n C r e e k B r a n c h B i g S a n d H o l e R d .R d .B l a n k O s c a r
N
o
.
2
7
9
N
o
.
2
8
8
VICINITY MAP DETOUR ROUTE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUND
A
R
I
E
S
.
T O
W
A
T E R
T A
N
K
R D
.
S R
1 8
2
4
B
R
I
A
N
P
.
R
O
B
I
N
S
O
N
R
E
K
H
A
P
A
T
E
L
,
P
E
C
O
L
U
M
B
U
S
C
O
U
N
T
Y
B
R
I
D
G
E
N
O
.
2
7
9
&
N
O
.
2
8
8
O
V
E
R
L
I
V
I
N
G
S
T
O
N
C
R
E
E
K
A
N
D
A
P
P
R
O
A
C
H
E
S
O
N
S
R
1
8
3
1
(
S
W
I
M
M
I
N
G
H
O
L
E
R
O
A
D
)
25 50 100 50 25 50 100 50 5 10 20 10 DHV D T V ======500 740 11 65 60 %%MPH ADT ADT 2013 2033 % *DUAL 2%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
* TTST =1%SUB REGIONAL TIER 0 0 0 PROFILE (HORIZONTAL)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
SH
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANS PROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
0 9 /0 8 /9 9
B
-
4
4
8
1
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
0 0 0 2 3 -J A N -2 0 1 3 0 8 :5 6 R :\R o a d w a y \P r o j \B 4 4 8 1 _R d y _t s h .d g n $$$$U S E R N A M E $$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
C O N T R A C T :T I P P R O J E C T :B -4 4 8 1
D E P A R T M E N T
O
F
T
R
A
N
S
P
O R
T
A
T
I O N
S
T A T E
O
F
N
O
R
T
H
C
A R O L I N A
FUNC CLASS = RURAL LOCAL 3
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
4
-
L
-
S
T
A
1
3
+
0
0
.
0
0
-
L
-
S
T
A
.
2
3
+
5
0
.
0
0
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
P
A
V
I
N
G
,
A
N
D
S
T
R
U
C
T
U
R
E
S
See Sheet 1-A For Index of Sheets See Sheet 1-B For Conventional Symbols LOCATION PROJECT
T
O
L
I
V
I
N
G
S
T
O
N
C
H
A
P
E
L
R
D
.
S
R
1
8
4
3
P
E
B
R
Z
-
1
8
3
1
(
3
)
3
8
3
8
6
.
1
.
1
3
8
3
8
6
.
2
.
1
B
R
Z
-
1
8
3
1
(
3
)
R
/
W
&
U
T
I
L
S
E
P
T
E
M
B
E
R
1
7
,
2
0
1
3
-
L
-
S
T
A
.
1
4
+
4
5
.
7
5
-
L
-
S
T
A
.
1
5
+
7
8
.
2
5
-
L
-
S
T
A
.
2
1
+
2
5
.
3
1
-
L
-
S
T
A
.
2
2
+
1
2
.
6
9
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
S
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
=
0
.
0
4
2
M
I
.
T
O
T
A
L
L
E
N
G
T
H
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
=
0
.
1
9
9
M
I
.
L
E
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
=
0
.
1
5
7
M
I
.
C
L
E
A
R
I
N
G
O
N
T
H
I
S
P
R
O
J
E
C
T
S
H
A
L
L
B
E
P
E
R
F
O
R
M
E
D
T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
.
J
A
N
U
A
R
Y
1
8
,
2
0
1
3
L I V I N G S T O N
C R E E K
L I V I N G S T O N C R E E K
N A D 8 3 / 9 5
C L 0.02 0 .0 8 -L-POIN
T
GRAD
E
THIS LINE GRADE TO 0
.
0
2
0
.0
8
M
I
N
.
M
I
N
.
D
E
T
A
I
L
S
H
O
W
I
N
G
M
E
T
H
O
D
O
F
W
E
D
G
I
N
G
C
S
U
R
V
E
Y
L
(S
E E X -S
E C
T I O
N
S )
3
"
3
"
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
C L 0.02 0 .0 8 -L-POI
N
T
GRA
D
E
THIS LINE GRADE TO
0
.0
8
0.
0
2
(S E E X -S E C T I O N S )
V
A
R
.
(S E E X -S E C T I O N S )
(S E E X -S
E C
T I O
N
S )
V
A
R
.
P
O
I
N
T
G
R
A
D
E
PROPOSED COR
E
D
S
L
A
B
S
0
.
0
2
0.02 C L -
L
-
USE TYPICAL ON S
T
R
U
C
T
U
R
E
T
T
T W U
T
6
’
9
’
W
/
G
R
9’ W/GR 6’9’ W/GR
6
’
9
’
W
/
G
R
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
TYPICAL SECTI
O
N
N
O
.
1
(SEE STRUCTU
R
E
P
L
A
N
S
)
6’10’
1
0
’
EXIST.EX
I
S
T
.
9’9
’
10’ 1
0
’
10’
1
0
’
TYPICAL SECTION O
N
S
T
R
U
C
T
U
R
E
-
L
-
S
T
A
.
1
3
+
0
0
.
0
0
T
O
S
T
A
.
1
4
+
0
0
.
0
0
-
L
-
S
T
A
.
1
6
+
5
0
.
0
0
T
O
S
T
A
.
2
0
+
5
0
.
0
0
-
L
-
S
T
A
.
2
2
+
7
5
.
0
0
T
O
S
T
A
.
2
3
+
5
0
.
0
0
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
B
-
4
4
8
1
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6 /2 /9 9 2 3 -J A N -2 0 1 3 0 8 :5 6 R :\R o a d w a y \P r o j \B 4 4 8 1 _r d y _t y p .d g n $$$$U S E R N A M E $$$$TYPICAL SECTIO
N
N
O
.
2
6.5"6
.
5
"
6.5"C1 C2
C
2
C2
C
3
C
1
E1
E
1
E1
E
2
U
C3 V A R . 2 :1 T O 3 :1 VAR.
V A
R . 2
:1 T O
3
:1
VAR.V A R . 2 :1 T O 3 :1
V A R . 2
:1 T O
3
:1
30’-10
"
5’-5"
5
’
-
5
"
STA. 15+78.25 (END
B
R
I
D
G
E
)
-L- STA. 14+45.75 (BEG
I
N
B
R
I
D
G
E
)
-L- STA. 21+25.31 (BEG
I
N
B
R
I
D
G
E
)
STA. 22+12.69 (END
B
R
I
D
G
E
)
-
L
-
S
T
A
.
1
4
+
0
0
.
0
0
T
O
S
T
A
.
1
4
+
4
5
.
7
5
(
B
E
G
I
N
B
R
I
D
G
E
)
-
L
-
S
T
A
.
1
5
+
7
8
.
2
5
(
E
N
D
B
R
I
D
G
E
)
T
O
S
T
A
.
1
6
+
5
0
.
0
0
-
L
-
S
T
A
.
2
0
+
5
0
.
0
0
T
O
S
T
A
.
2
1
+
2
5
.
3
1
(
B
E
G
I
N
B
R
I
D
G
E
)
-
L
-
S
T
A
.
2
2
+
1
2
.
6
9
(
E
N
D
B
R
I
D
G
E
)
T
O
S
T
A
.
2
2
+
7
5
.
0
0
"
@
C
B
R
G
.
(
S
P
A
N
’
B
’
)
4
3
4
"
@
C
B
R
G
.
(
S
P
A
N
’
A
’
O
R
’
C
’
)
4 1
3
B
R
G
.
N
o
.
2
8
8
L B
R
G
.
N
o
.
2
7
9
"
@
C
B
R
G
.
4 1
3
L
L
BRG. No. 279 " @ C BRG. (SPAN ’B’)2 1 8 7" @ C BRG. (SPAN ’A’ OR ’C’)BRG. No. 288 L 7" @ C BRG.L L
E
A
R
T
H
M
A
T
E
R
I
A
L
.
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
.
N
O
T
E
:
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
A
R
E
1
:
1
U
N
L
E
S
S
S
H
O
W
N
O
T
H
E
R
W
I
S
E
.
E
2
T U E
1 W
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
(
S
E
E
W
E
D
G
I
N
G
D
E
T
A
I
L
)
P
R
O
P
.
A
P
P
R
O
X
.
1
.
2
5
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
4
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
3
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
T
H
A
N
5
.
5
"
I
N
D
E
P
T
H
.
C
2
C
1
C
3
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
3
7
.
5
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
R
O
P
.
A
P
P
R
O
X
.
2
.
5
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
3
7
.
5
L
B
S
.
P
E
R
S
Q
.
Y
D
.
I
N
E
A
C
H
O
F
T
W
O
L
A
Y
E
R
S
.
P
R
O
P
.
V
A
R
.
D
E
P
T
H
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
C
O
U
R
S
E
,
T
Y
P
E
S
F
9
.
5
A
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
1
1
0
L
B
S
.
P
E
R
S
Q
.
Y
D
.
P
E
R
1
"
D
E
P
T
H
.
T
O
B
E
P
L
A
C
E
D
I
N
L
A
Y
E
R
S
N
O
T
L
E
S
S
T
H
A
N
1
.
0
"
I
N
D
E
P
T
H
O
R
G
R
E
A
T
E
R
T
H
A
N
1
.
5
"
I
N
D
E
P
T
H
.
P
R
O
P
.
A
P
P
R
O
X
.
4
.
0
"
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
B
A
S
E
C
O
U
R
S
E
,
T
Y
P
E
B
2
5
.
0
B
,
A
T
A
N
A
V
E
R
A
G
E
R
A
T
E
O
F
4
5
6
L
B
S
.
P
E
R
S
Q
.
Y
D
.
F
I
N
A
L
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
R E V I S I O N S
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
4
B
-
4
4
8
1
2 3 -J A N -2 0 1 3 0 8 :5 8 R :\R o a d w a y \P r o j \B 4 4 8 1 _R d y _p s h 0 4 .d g n $$$$U S E R N A M E $$$$8 /1 7 /9 9
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
TYPE III TYPE III
T
Y
P
E
I
I
I
T
Y
P
E
I
I
I
BEGIN APPROACH SLAB BEGIN BRIDGE
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
E
N
D
B
R
I
D
G
E
2 0 ’
1 0 ’1 0 ’
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
B
E
G
I
N
B
R
I
D
G
E
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
E
N
D
B
R
I
D
G
E
D
E
T
A
I
L
S
H
O
W
I
N
G
P
A
V
E
M
E
N
T
A
N
D
B
R
I
D
G
E
R
E
L
A
T
I
O
N
S
H
I
P
DETAIL SHOWING PAVEMENT AND BRID
G
E
R
E
L
A
T
I
O
N
S
H
I
P
(NOT TO SCALE)
(
N
O
T
T
O
S
C
A
L
E
)
SBG SBG
S
B
G
S
B
G
S
B
G
S
B
G
S
B
G
S
B
G
1 0 ’1 0 ’
-
L
-
1 0 ’1 0 ’
2 0 ’
T
Y
P
E
I
I
I
T
Y
P
E
I
I
I
T
Y
P
E
I
I
I
T
Y
P
E
I
I
I
-
L
-
1 0 ’1 0 ’
.0 2 .0 2
.0 2 .0 2
.0 2 .0 2
.0 2 .0 2
N
O
T
E
:
S
E
E
S
H
E
E
T
5
F
O
R
-
L
-
P
R
O
F
I
L
E
3 0 ’-1 0 "5 ’-5 "5 ’-5 "
5 ’-5 "5 ’-5 "
3 0 ’-1 0 "
-L- STA. 14+45.75 -L- STA. 14+34.75
-
L
-
S
T
A
.
1
5
+
7
8
.
2
5
-
L
-
S
T
A
.
1
5
+
8
9
.
2
5
-
L
-
S
T
A
.
2
1
+
2
5
.
3
1
-
L
-
S
T
A
.
2
1
+
1
4
.
3
1
-
L
-
S
T
A
.
2
2
+
1
2
.
6
9
-
L
-
S
T
A
.
2
2
+
2
3
.
6
9
P
I
S
t
a
2
4
+
9
0
.
6
7
D L
=
4
2
9
.
9
9
’
T
=
2
1
7
.
9
9
’
R
=
1
,
0
6
0
.
0
0
’
1 5
2 0
2 5
GRAU TL-3 GRAU TL-3
T
Y
P
E
-
I
I
I
TYPE-III TYPE-III
T
Y
P
E
-
I
I
I
B
M
8
1
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
G
R
A
U
T
L
-
3
G
R
A
U
T
L
-
3
BM 80
.0 5
.0 6
.0 4
.0 3
.0 2 .0 2
.0 1
.0 0
.0 1
.0 2
1 0 ’1 0 ’
1 0 ’1 0 ’
1 0 ’1 0 ’
1 0 ’1 0 ’.0 2 .0 3 .0 4 .0 2 .0 2 .0 2 1 8 ’
1 8 ’
S E E X +2 5 25’INC.
.0 2 .0 2
2
5
’
I
N
C
.
+0 5
E X S E
-
L
-
P
O
C
S
T
A
.
2
3
+
5
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
4
8
1
-L- POT STA. 13+00.00 BEGIN TIP PROJECT B-4481
-
L
-
S
E
=
S
E
E
P
L
A
N
S
-
L
-
P
C
S
t
a
.
2
2
+
7
2
.
6
7
T
O
B
E
G
.
B
R
I
D
G
E
S
T
A
.
2
1
+
0
6
.
5
6
+
/
-
-
L
-
(
L
T
&
R
T
)
S
B
G
-
L
-
8
:1
8
:
1
8 :1 8 :1 STA. 14+07 -L- LT BEGIN SBG STA. 14+07 -L- RT BEGIN SBG (LT & RT)END SBG AT BRIDGE
(
L
T
&
R
T
)
B
E
G
I
N
S
B
G
A
T
B
R
I
D
G
E
S
T
A
.
2
2
+
5
0
-
L
-
(
L
T
&
R
T
)
E
N
D
S
B
G
(
L
T
&
R
T
)
B
E
G
I
N
S
B
G
A
T
B
R
I
D
G
E
S
T
A
.
1
6
+
1
6
-
L
-
(
L
T
&
R
T
)
E
N
D
S
B
G
(
S
E
E
D
E
T
A
I
L
2
-
A
)
S
T
A
.
1
5
+
8
8
T
O
2
1
+
1
4
-
L
-
R
T
I
N
S
T
A
L
L
R
O
C
K
P
L
A
T
I
N
G
(
S
E
E
D
E
T
A
I
L
2
-
A
)
S
T
A
.
2
0
+
2
5
T
O
2
1
+
1
4
-
L
-
L
T
I
N
S
T
A
L
L
R
O
C
K
P
L
A
T
I
N
G
L
T
&
R
T
(
S
E
E
D
E
T
A
I
L
2
-
A
)
S
T
A
.
2
2
+
2
3
T
O
2
3
+
0
0
-
L
-
I
N
S
T
A
L
L
R
O
C
K
P
L
A
T
I
N
G
-L- STA 14+45.75 BEGIN BRIDGE
-
L
-
S
T
A
1
5
+
7
8
.
2
5
E
N
D
B
R
I
D
G
E
-
L
-
S
T
A
2
1
+
2
5
.
3
1
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
2
2
+
1
2
.
6
9
E
N
D
B
R
I
D
G
E
(STRUCTURE PAY ITEM)TO ELEV. = 28.0’RIP RAP CL ’II’ /w CL ’B’
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
T
O
E
L
E
V
.
=
2
8
.
0
’
C
L
’
I
I
’
/
w
C
L
’
B
’
R
I
P
R
A
P
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
T
O
E
L
E
V
.
=
2
8
.
0
’
C
L
’
I
I
’
/
w
C
L
’
B
’
R
I
P
R
A
P
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
T
O
E
L
E
V
.
=
2
8
.
0
’
C
L
’
I
I
’
/
w
C
L
’
B
’
R
I
P
R
A
P
0401 0402
0
4
0
4
0
4
0
5
0
4
0
7
0
4
0
8
0403
0
4
0
6
0
4
0
9
TB 2GI TB 2GI
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
w / E l b o w s 1 5 "
w / E l b o w s
1 5 "
w
/
E
l
b
o
w
s
1
5
"
ELB ELB
ELB ELB
ELB ELB
0410 w/ Elbows 15"ELB ELB
0
4
1
1
w / E l b o w s
1 5 "
ELB ELB
0
4
1
2
w
/ E l b
o
w
s
1
5
"
ELB ELB
50.00’
5
0
.
0
0
’
6
0
.
0
0
’
+00.00
+
7
2
.
6
7
+
5
0
.
0
0
+
5
0
.
0
0
+
7
2
.
6
7
E
X
.
R
/
W
6
0
.
0
0
’
E
X
.
R
/
W
5
0
.
0
0
’
EX. R/W
1 1 0 ’ R /W
1 1
2
2
+00.00 60.00’EX. R/W L I V I N G S T O N C R E E K
L I V I N G S T O N C R E E K
1 6 8 .3 0 ’1 1 8 .6 0 ’171.10’BOBBY RAY MOORE DB 241 PG 389
D
B
1
3
9
P
G
5
9
8
W
P
A
R
N
E
L
L
A
P
P
L
E
W
H
I
T
E
W
P
A
R
N
E
L
L
A
P
P
L
E
W
H
I
T
E
D
B
1
3
9
P
G
5
9
8
BOBBY RAY MOORE DB 241 PG 389 SR 1831 SWIMMINGHOLE RD
T
O
W A T
E
R
T
A N
K
R
D
P R O P L I N E W I T H R U N O F C R E E K
P R O P L I N E W I T H R U N O F C R E E K
EXISTING R/W EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
N E L S O N A P P L E W H I T E J R D B 4 8 4 P G 5 2 9
6 0 .0 0 ’ R /W
9 ’S O I L
-B L - 3 P I N C
-B L - 8 P I N C
-B L - 9 P O T
-B L - 2 P I N C ELEV=23.05 TOP OF WA
T
E
R
F F
F
F
F
F
F F
F
F F
F
N A D 8 3 / 9 5