Loading...
HomeMy WebLinkAboutNCC190793_NOT Closeout Documents (2)_20210518North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Edgecombe Project: Fern Solar Substation Person financially responsible: Amec Foster Wheeler, Kamtech Inc. - Nate Robinson, Vice President, Solar Operations Address: 1979 Lakeside Pkwy STE 400, Tucker, GA 30084 1. Project Location: Cool Spring Road, Battleboro Pictures: No River basin: Tar -Pamlico Project #: EDGEC-2019-013 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): N/A Title: Inspection report: Sent Report Date given/sent: May 11, 2021 9. Corrective action needed: 10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Others present: Date of inspection: May 11, 2021 Time arriving on site: 10:10 AM Time leaving site: 11:00 AM cc: