Loading...
HomeMy WebLinkAbout20080662 Ver 1_Certification of Completion_20130114OF 14V NCDENR Certificate of Completion o DWQ Project No . U000- 0(,* (0 a- County E)AP-C Applicant bcd� 2- SlGiyy-i A &QeA- U It`e / C&A114 Prod ect Name P(A S S(o ) 2yO - Z } TA �40L \nl Date of Issuance of Wetland Permit �: Upon completion of all work approved within the 401 Water Quality Certification and /or Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these. Applicant's Certification I, (14 �PX�t0/ �"�; hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting mater is Signature �� Date 01 f 0a-1 x2013 Agent's Certification I, used in the observation of the construction compliance and intent of the 401 Water specifications, and other supporting materials. Signature , hereby state that, to the best of my abilities, due care and diligence was such that the construction was observed to be built within substantial Quality Certification and /or Buffer Rules, the approved plans and Date If this project was designed by a Certified Professional t t� f � 7�F. ttjd 3y I, , as a duly registered Professional (i e, Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting materials Signature Registration No Date