Loading...
HomeMy WebLinkAbout20210511_WSWP Forsyth_WS AuditFollowup_WS Version_FINALForsyth Winston Salem Audit Follow up Questions ANSWERS ARE IN BLUE LETTERINGS, ARIAL FONT, AND CAPITALIZED BY MATT AND ANDY. Forsyth WS implements WSWP program in Winston Salem, Walkertown, and Forsyth County (except those municipalities that administer program themselves). The Forsyth Winston-Salem and Walkertown ordinances contain the majority of the Water Supply Watershed Protection (WSWP) program information, but Walkertown attorney letter contains additional guidance. Please provide digital copy of attorney letter. ANSWER: PAUL — PLEASE REFERENCE - E ATTACHED LETTERS FROM WALKERTOWN'S ATTORNEY AND COUNCIL. Salem Lake watershed offers low and high density, density averaging, and 5/70. Other watersheds offer low density and 5/70. WSWP position(s) are budgeted as reoccurring. Please share digital versions Org chart(s) and position responsibilities if available? ANSWER: PAUL, PLEASE REFERENCE THE ATTACHED TWO ORG CHARTS — ONE IS AN OVERVIEW OF THE ENTIRE DEPARTMENT AND THE OTHER IS A DIVISION -SPECIFIC CHART. IN ADDITION, I HAVE ENCLOSED MATT'S WORK PLAN FOR FY 2020-2021, WHICH INCLUDES A WORK GOAL OF ADMINISTRATING THE CITY/COUNTY/TOWN OF WALKERTOWN WATERSHED SUPPLY PROTECTION ORDINANCE. THIS WORK PLAN IS ATTACHED TO MATT'S ANNUAL JOB EVALUATION. Standard Operating Procedures were mentioned in the beginning of the audit. Please provide digital copy or link to SOPS for processes related to WSWP program? ANSWER: '. IE CITY DOES NOT HAVE WRITTEN, FORMALIZED SOPs TO MEMORIALIZE PROGRAMMATIC FLOW -PROCESS FUNCTIONS. STAFF HAS BEEN TRAINED `ON-THE-JOB' FROM THE INCUMBENT STAFF MEMBER REGARDING THE ADMINISTRATION OF THE CITY'S WATERSHED SUPPLY PROTECTION ORDINANCE. STAFF REFERENCED SOPs AT THE BEGINNING OF THE AUDIT TO INQUIRE THE LEVEL OF DETAIL THAT THE STATE AUDITOR WAS ASSESSING OUR PROGRAM. All WSWP permits are geolocated with detailed information (inspections, enforcements issued, etc.) on each. Are Salem LAKE Stormwater Control Measures associated with high density developments included in this geodatabase? ANSWER: YES, JAMAL CLARK, STORMWATER OPERATIONS SUPERVISOR, FOUND A POINT FILE (AFTER THE AUDIT) THAT HAS SALEM LAKE SCMs MAPPED IN STORMWATER'S GEODATABASE. JAMAL IS CREATING AN OVERVIEW MAP (WITH CORRESPONDING SCM LIST) FOR YOUR REFERENCE — THIS MAP WILL BE SENT UPON COMPLETION. INSPECTION REPORTS AND PICTURES, ISSUED ENFORCEMENT ACTIONS AND VIOLATIONS, ETC. ARE HOUSED IN AN EXCEL SPREADSHEET AND YEARLY MASTER FILE THAT CATALOGS ALL PERTINENT SCM INFORMATION. THIS SPREADSHEET RUNS CONCURRENTLY, SO STAFF CAN COMPARE ANNUAL PROGRESSION OF COMPLIANCE ITEMS AND SCM CONDITION. All post construction permits are logged in notebook. Beginning in 2008, these permits are entered in geodatabase. Is Forsyth WS investigating putting non WSWP post construction permits in WSWP geodatabase or separate geodatabase? ANSWER: JAMAL CLARK, STORMWATER OPERATIONS SUPERVISOR, FOUND A POINT FILE (AFTER THE AUDIT) THAT HAS ALL PRE-2008 SCMs MAPPED IN STORMWATER'S GEODATABASE. STORMWATER STAFF INSPECTS THESE PRE-2008 SCMs; THESE SCMs ARE IN THE SAME POINT FILE AS SALEM LAKE SCMs, BUT CAN BE QUERIED AND VIEWED BY RESULTS. JAMAL IS CREATING AN OVERVIEW MAP (WITH CORRESPONDING SCM LIST) FOR YOUR REFERENCE — THIS MAP WILL BE SENT UPON COMPLETION. PLEASE NOTE: ALL POST-2008 SCM INFORMATION, WHICH HAVE BEEN PERMITTED, RESIDE IN A SEPARATE EXCEL SPREADSHEET AND MAINTAINED BY JOE FOGARTY, STORMWATER ENGINEER. WSWP permit system has flagging mechanism to show if proposed project is in WSWP area. If proposed project is not compliant, applicant must submit request to city or county zoning board of adjustments. Regular applications are handled by WSWP program, but variance application requests must go to either Forsyth or Winston Salem Board or Adjustments. ForsythWS will investigate improving variance submittal requirements, so that it includes specific amount of increased BUA. ANSWER: PLEASE REFERENCE THE ATTACHED EMAIL THREAD BETWEEN MATT AND THE INSPECTIONS DEPUTY DIRECTOR, CHRIS MURPHY. AS PER THE EMAIL, MATT WILL REVIEW WATERSHED VARIANCE APPLICATIONS AS A SHORT-TERM SOLUTION OF TRACKING BUA. CHRIS AND MATT WILL WORK ON A VIABLE, PERMANENT SOLUTION, ONCE THE PLANNING DEPARTMENT HAS COMPLETED SOME UPCOMING PERSONNEL CHANGES. THE REQUESTED, ADDITIONAL INFORMATION THAT THE CITY WILL REQUIRE 1) EXISTING BUA ON THE PARCEL 2) THE INCREASED BUA THAT THE APPLICANT REQUESTS 3) THE TOTAL PARCEL BUA (AND EXPRESSED AS A PERCENTAGE). 5/70 tracking - entire project tract acreage is subtracted from total as opposed to just the BUA area portion of project Erosion control staff field verify that developments are built according There have been no WSWP — BUA or vegetated exceedances WSWP exceedances would use E&SC NOV notice as a template, could also be like floodplain Density averaging/paired parcel - metes and bounds description meant that plat did not have to recorded and the presence of council resolution. Sorry, I do not remember meaning of this note. Please explain that NCGS 143-214.5 (d2) (6) The property or portions of the properties that are not being developed will remain in a vegetated or natural state and will be managed by a homeowners' association as common area, conveyed to a local government as a park or greenway, or placed under a permanent conservation or farmland preservation easement unless it can be demonstrated that the local government can ensure long-term compliance through deed restrictions and an electronic permitting mechanism. A metes and bounds description of the areas to remain vegetated and limits on use shall be recorded on the subdivision plat, in homeowners' covenants, and on individual deed and shall be irrevocable. After NOV issued, entity has 10 days to respond and 90 days to correct deficiency 2008 program improvements: - - All post construction permits entered in geodatabase AND EXCEL SPREADSHEET - - WSWP permit holders must submit inspection report by qualified professional, earlier ForsythWS responsible - O&M AGREEMENTS, CREATION OF escrow account FOR CATASTROPHIC FAILURES - were there other major changes? ANSWERS: 1) SCMS MUST BE DESIGNED TO MEET THE MINIMUM STANDARDS (WATER QUALITY AND QUANTITY) OF THE STATE'S SCM MANUAL 2) RECORDED ACCESS EASEMENTS FOR INSPECTION PURPOSES Site Visits Infiltration Basin — Dollar General, 3103 Kernersville Rd, Winston Salem 2. Cluster development with swales, please provide address ANSWER: 212 STEWART ROAD, WINSTOW SALEM, NC 27107