Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20210957 Ver 1_Meeting Request Review_20210517 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Environmental Quafity
ID#* 20210957 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 5/17/2021
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jason Dilday
Contact Email Address* jldilday@ncdot.gov
Project Name* Bridge 36 on NC561 over Fishing Creek
Project Owner* NCDOT
Project County* Halifax
Owner Address: Street Address
1000 Birch Ridge Drive
Address Line 2
City State/Bovine/Region
Raleigh NC
Fbstal/Zip Code Country
27610 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
i7 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
1 Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information.*
Replacement of Bridge 36 on NC 561 over Fishing Creek.
Please attach the documentation you would like to have the meeting about.
BR-0090_and_B-5947_Prefilingcomments.pdf 367.97KB
pol only
By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
ait.feor
Submittal Date 5/17/2021
Reviewer Meeting Request Decision
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes r No
If more information is needed,please add con II ents for the email notification below.