HomeMy WebLinkAbout20130160 Ver 1_CAMA Application_20130219FZZI " `
2013
4
—ir ENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis
Governor Director
February 14, 2013
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
Karen Higgins
Division of Water Quality
Doug Huggett
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Robert Kennel, Joseph Tarlton, et.al
0 160
John E. Skvarla, III
Secretary
Pamlico County, adjacent to the Neuse River at 171 Live Oak Rd., SR 1114, in
the Kennels Beach community near Grantsboro.
Proposes to construct a 6 -slip docking facility for private /community use in
the Neuse River.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
March 6, 2013. If you have any questions regarding the proposed project, please contact
Brad Connell, Permit officer at (252) 808 -2808. When appropriate, in -depth comments with supporting
data is requested.
REPLY: This agency has no objection to the project as proposed.
SIGNED
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
DATE
400 Commerce Ave., Morehead City, NC 28557
Phone: 252 -808 -28081 FAX: 252 - 247 -3330 Internet: www.nocoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
►Ir� ►i���:�- -� ilk
FEERI q [013 �s
„ I -_tWV - t UGAL�iry
a '
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Robert Kennel, Joseph Tarlton, et al.
2. LOCATION OF PROJECT SITE: The project is located adjacent to the Neuse River at
171 Live Oak Road (SR 1114), in the Kennels Beach community near Grantsboro, Pamlico
County.
Photo Index — 2006: 215 -6257, grids M -17; 2000: 215 -910, grids M -16.
State Plane Coordinates - X: 801212.141 Y: 143364.924
Longitude: -076 54 00.03 Latitude: 35 0126.83
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Date of Site Visit — several since 9/1/2010
Was Applicant or Agent Present No
Photos Taken — No
5. PROCESSING PROCEDURE: Application Received — cc: 2/8/13
Office — MHC
6. SITE DESCRIPTION:
(A) Local Land Use Plan — 2005 Pamlico County (01/28/05)
Land Classification from LUP — Rural with Services
(B) AEC(s) Involved: PTA, EW
(C) Water Dependent: Yes
(D) Intended Use: Private /Community
(E) Wastewater Treatment: Existing — None
Planned -None
(F) Type of Development: Existing — Multiple docking facilities (totaling 11 slips),
boat ramp, and a bulkhead
Planned - Six -slip docking facility
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION:
DREDGED FII.IND nvf'nRP /CAADV"
(A) Open Water 1,430 ft2 shaded
3,530 ft2 incorp
(E) Total Area Disturbed: 3,530 ft2
(F) Primary Nursery Area: No
(G) Water Classification: SB; Sw, NSW Open: No
(M Cultural Resources: None
8. Project Summary: The applicant wishes to construct a 6 -slip docking facility for
private /community use in the Neuse River, Pamlico County.
Field Investigation Report:
Joseph Tarlton, et al.
Page 2
9. Narrative Description:
The property is located in the Kennels Beach community, near Grantsboro, at 171 Live Oak Road (SR
1114), Pamlico County. This community parcel is developed with multiple docks that support 11
boat slips, a bulkhead, and a boat ramp. The lot is 3.1 acres and is adjacent to the Neuse River. Both
of the adjacent lots are privately owned and are developed with single - family residential dwellings,
bulkheads, and docks.
The elevation of the high ground of the parcel is about +4' above the normal water level (nwl).
Vegetation on the lot mainly consists of lawn grasses. There are no Coastal Wetlands on this
property. This lot has approximately 541' of continuous shoreline along the Neuse River. Immediate
offshore water depths adjacent to the lot range from 2' to —4' nwl. The subaqueous substrate is firm
with shell.
There is not a cultural resource in the nearby vicinity of the project area. This waterbody is
approximately 3.8 miles across at this location. These waters are not classified as a Primary Nursery
Area and there is not any submerged aquatic vegetation present. This area is closed to shellfish
harvest and is classified as SB; Sw, Nutrient Sensitive Waters. The defined Federal Channel in this
area is approximately 2.9 miles southwest of this project site. This project area is subject to the Neuse
River Riparian Buffer Rules.
10. Proposed Development:
The applicant wishes to construct a six -slip private /community docking facility adjacent to the Neuse
River, near Grantsboro. The proposed development will take place at 171 Live Oak Road (SR 1114),
Pamlico County. The purpose of this development is to support additional slips at the community lot
at Kennels Beach. The community lot currently supports 11 slips, a boat ramp, and a bulkhead. This
proposal would bring the community marina to a total of 17 boat slips.
The proposed docking facility will be situated between two existing groins on the lot. The proposed
docking facility will have a main access pier that leaves the bulkhead and connects to an uncovered
"T" platform with a "step down." This proposed pier will be 5' wide and 130' long. The proposed
"T" platform will be 10' wide and 30' long with a 10' wide and 6' long step down attached on the
east side of the "T." The six proposed boat slips will be supported by six independent tie pilings
adjacent to the main access pier. Each slip will be 14' by 30'. Slip #1 will be located on the inside of
the "T" platform's northwestern side. It will have a covered boat lift. Slip #1 will be accessed via
traversing through Slip #2.
The water depths in the proposed slips range from -3.5 to -4.0 NWL. This proposed docking facility
will extend 140' waterward from the existing bulkhead out into the Neuse River. This proposed
docking facility will be more than 20' from either adjacent riparian property area.
Brad Connell February 14, 2013 Morehead City
Field Investigation Report:
Joseph Tarlton, et al.
Page 3
10. Anticipated Impacts:
The docking facility will not pose a hazard to navigation because it will be less than V4 of the width of
the waterbody and approximately 2.9 miles from the channel. The proposed docking facility will not
be longer than the pier head line established by the adjacent docking facilities. The docking facility
will be greater than 15' from both of the adjacent riparian property lines. This proposed docking
facility will be approximately 50' from the existing dock to the east, and it will be approximately 47'
from the existing boat ramp's staging pier to the west.
This proposed private /community docking facility will usurp 3,530 f and shade 1,43011 of Public
Trust Waters. This proposed docking facility will result in six new slips to the eleven existing slips at
this community marina. The proposed docking facility will extend 140' waterward of the bulkhead at
NWL. The Neuse River is 3.8 miles wide at this location.
Traditional marine construction methodology will be utilized during the construction of this private
docking facility. Temporary, short-lived turbidity impacts are anticipated during the setting of the
docking facility's pilings. There is no proposed change in the usage of the community marina by
the residents of Kennels Beach.
There is not a cultural resource in the nearby vicinity of the project area. This project area is
subject to the Neuse River Riparian Buffer Rules. Water depths within the proposed boat slips are
deep enough to prevent scouring of the bottom habitat. These waters of the Neuse River are not
classified as a Primary Nursery Area and there is not any submerged aquatic vegetation present.
This area is closed to shellfish harvest and is classified as SB; Sw, Nutrient Sensitive Waters.
There is a defined Federal Channel 2.9 miles south of the project area.
Brad Connell February 14, 2013 Morehead City
& - sU6VAt - o2J/q� /Zot3
'5ce X t'LJ& k % ne '9a,r+otG�, a p� i.
PROJECT NARRATIVE
KENNELS BEACH JOINT USE PIER & SLIP CONSTRUCTION
This project consists of the construction of a six slip docking facility as detailed on the project work plan(s).The facilities are
proposed to be attached to land(s) under the ownership of Kennels beach incorporated. Kennels beach incorporated has
provided it's consent (copy of consent statement is herewith included) to allow the construction of the proposed facility. The
said lands have been previously leased to Kennels Beach Improvement, a North Carolina Corporation which has likewise voiced
Its consent by signature of corporate officer(s) (copy included) to allow the construction of the proposed facilities. The
proposed facilities will be a joint use facility to be used by but not limited to Joseph. Tarlton, Patsy Vann, Marvin Cherry, and
Alice Ackerman. Also included is the "Kennel FamlW which has been given rights to use the proposed facilities. The facility will
consist of 5' wide hog -slat concrete panels with appropriate stingers and headers anchored to 8" diameter piles located @ 5'
spacing center to center. The main walkway will be 130' linear feet in length terminating into a 10' feet X 30' feet Tee platform.
Included within the six slip total is a 16' feet X 30' feet coverd boatlift located at the western side of the walkway at the outward
end. There is proposed to be six(6) tie off piles for securing watercraft alongside the proposed facility. Generally, the slips will
be used for temporary dockiniExcept for the covered boat slip which will permanently house a watercraft, the remaining five
slips will generally be used for temporary docking and tie-off during the summer boating and fishing season.
Construction of the proposed facility will be from a barge mounted vibratory hammer for pile installation and installation of
dock support timbers and walkways. Construction is expected to be not more than 15 working days from commencement to
completion. Protective measures will be in -place to minimize any possible contaminants from entering State waters. All debris
and construction waste shall be promptly removed from the site upon completion of construction.
bcm MP -7
APPLICATION for
` 1
Major Development Permit
(last revised 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant( Landowner Information
Business Name
Kennels Beach Inc.
Project Name (if applicable)
Proposed Pier & Slip Construction - Kennels Beach
Applicant 1: First Name
Robert
MI
P
Last Name
Kennel
Applicant 2: First Name
Joseph
MI
H
Last Name
Tarlton (see additional attachment "A ")
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1624 Pulley Gordon Rd.
PO Box
City
Zebulon
State
NC
ZIP
27597
Country
USA
Phone No.
919 -422 - 9361 ext
FAX No.
252-249- -2052
Street Address (if different from above)
City
State
ZIP
Email
2. Agent(Contractor Information
Business Name
Dennis Fomes & Associates
Agent/ Contractor 1: First Name
MI
Last Name
Dennis
A
Fomes
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
1266 Roberts Rd.
Grantsboro
NC
ZIP
Phone No. 1
Phone No 2
28529
252 - 249- 0488 ext.
- - ext.
FAX No
Contractor #
252 249 2052
L -3042 NC PLS
Street Address (if different from above)
City
State
ZIP
Email
NCSURV @GMAIL.COM
<Form continues on back>
Form DCM MP -1 (Page 2 of 4)
"Revi-O cd lte-VA A C-R.
APPUCA71ON for
Major Development Permit
3 Project Locadon
County (can be multiple)
Address
State Rd. #
Pamlico
!17 �ILU
7ve Oa k Rd.
SR 1114
Subdivision Name
City
State
Zip
Kennels Beach community
Grantsboro
NC
28529-
Phone No.
Lot No.(s) lif many, attach additional page with list)
- - ext.
The project proposes to construct a joint use docking facility to be attached to a community leased parcel owned by Kennels
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Neuse
Neuse River
a Is the water body Identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Pamlico Sound
e. Is proposed work within kitty limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city fimfi the proposed
❑Yes ®No
work falls within.
National Register listed or eligible property?
Pamlico County
4. Site Desctripdon
a. Total length of shoreline on the tract (k)
b. Size of entire tract (sq.ft)
541.3
135036
c. Size of individual lots)
d. Approximate elevation of tract above NHW (normal high water) or
N/A, I
NWL (normal water lame!)
pfmanylot sizes, please attach additional page wM a Ii Q
4.0' ❑NHW or ®NWL
e. Vegetation on tract
native grasses
f. Man -made features and uses now on tract
boat ramp, wooden bulkhead
boat launch and retreivai and pier access
g. Identify and describe the existing land uses ad'ace to the proposed project site.
The project proposes to construct a joint use docking facility to be attached to a community leased parcel owned by Kennels
Beach Inc. The adjacent parcels are privately owned parcels with single family residential structures and privately owned
docking facilities.
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Residential
(Attach zoning compliance certificate, if applicable)
®Yes []No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ®NA
If yes, by whom?
I. Is the proposed Project located in a National Registered Historic District or does it Involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Fonn continues on next page>
: > .. :t 8, r? kT, 1w ir., •i�l .:� :.,' +�� .n .,_�.� �o� a. r ..
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (r) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes []No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
none
o Describe existing drinking water supply source
Pamlico County Water system
p. Describe existing storm water management or treatment systems
None
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovernment
®Private /Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
This project is a proposal to install a raised stationary walkway and platform along with tie-off piling(s) for temporary docking
of small watercraft. the proposed facilities will also be used for recreational fishing and boating activities.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Walkway(s), platform(s)and appurtenant stuctures will be constructed from a barge mounted vibratory pile drive and
associated construction equipment.
d. List all development activities you propose.
construction of a raised -rigid walkway, end platform Tee and covered boat lift, consisting of 5 wet -slip docking spaces and
one covered boatlift.
e. Are the proposed activities maintenance of an existing project, new work, or both? new work
f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
i. Will wastewater or storrnwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA
j. Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additionallnformatlon
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross- sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee Check or money order made payable to DENR
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Martha B. Wren Phone No. 252 - 291 -1893
Address 4729 Quaker Rd. Wilson, NC 27893
Name Shelton W. Stallings Phone No. 828 -989 -2126
Address 2601 -31 Avenue CT NE
Name Phone No
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Unknown
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner j
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S 113A 1 -10), if necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 12 -17 -2012 Print Name _Joe Tarlton
o e— 'rAA 1.'T -o ,J-1
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development f -ICL; ; f
®DCM MP-4 Structures Information
le•`5 4i hJ1Y ."__
A 41 ,G,,
I ✓i I t Ga A � I�Q wleS
A� } o P�
-71 ��_Ie
V6,
5007 ba4��C�O
a5a- 433- aaCr -,L, 14" 1 et v2z -q3 bI
A4
1
l
r � /
c
I N �,t9
i
Form ®CM MP-4
,!h li z
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
❑Commercial ❑PublicJGovemment ®Private /Community
c. (i) Dock(s) and/or pier(s)
(ii) Number
1
(iii) Length
130'
(iv) Width
5' hog -slat
(v) Floating
❑Yes ®No
e. (i) Are Platforms included? ®Yes []No
If yes:
(ii) Number 1
(iii) Length 36'
(iv) Width 10'
(v) Floating ❑Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
6
(ii) Number of slips existing
11
1. Check the proposed type of siting:
❑ Land cut and access channel
[]Open water, dredging for basin and /or channel
Open water, no dredging required
[]Other; please describe:
k. Typical boat length: 21'
m. (i) Will the facility have tie pilings?
®Yes []No
(ii) If yes number of tie pilings?
6
[I This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes ®No
d (i) Are Finger Piers included? ❑Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating []Yes []No
f. (i) Are Boatlifts included? ®Yes ❑No
If yes.
(ii) Number 1
(ui) Length 30'
(iv) Width 14'
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips ") only, number of slips: 6
❑ Dry storage; number of boats
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served ,(e.g., open runabout,
charter boats, sail boats, mixed types).
open runabout
I. (i) Will the facility be open to the general public?
❑Yes ®No
1
Z DOCKING FACILITY /MARINA OPERATIONS 0t►is kCapri')Pt applicable
a Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number ; Location
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live- aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes []No
n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
[]Yes ®No
o Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), 'shell bottbm
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None J
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
13. BOATHOUSE (including covered lifts) ❑This section not applicable I
a. (i) Is the boathouse structure(s):
❑Commercial ❑PubliclGovemment ®Private /Community
(ii) Number 1
(iii) Length 30 feet
(iv) Width 16 feet
Note: Roofed areas are calculated from dripline dimensions.
14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
15. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length
c. Maximum distance beyond NHW, NWL or wetlands
b. Average distance from NHW, NWL, or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s).
❑Commercial ❑Public/Govemment ❑Private /Community
C Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
t �
a. Proximity of structure(s) to adjacent riparian property lines
135'
b. Proximity of structure(s) to adjacent docking facilities.
42'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body d. Water depth at waterward end of structure at NLW or NWL
3 miles +/- - 4' NWL
e. (i) Will navigational aids be required as a result of the project?
❑Yes ❑No [DNA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER ®This section not applicable
a. Give complete description:
J;L'IN iz
Datez`�
Project Name J A IN
5LOe TO A)
Applicant Name
�.r.1
App nt Signature
aYVA iz�
L Dennis L Fornes, certify that this plat was drawn under my supervision from an actual
survey made under my superimon (deed descripition recorded m ImL.._
, page......_..__..; that the boundaries not surveyed are dearly indicated as drawn from
h6 maadon fond in BooL.____....w., page ___ . _ _; that the ratio of precision
as calculated is 1 . _.__._ ._._ .._ _,; that this plat was prepared in accordance with
G.S. 47 -30 as amended Wituess my original signature, mostratiou number and seal
this..._m.__.._day ai.. _._ .._.._, LD. 2011
w 1
Aq
Surveyor.._...._...._ �..._._ _.
tiw
0
Registration
TRACT INFORMATION:
P
1. TRACT IS OWNED BY KENNELS INC, 86 ROLLO RD., GRANTSBORO, NC p
% MR. ROBERT KENNEL- KENNELS BEACH INC.
2. TRACT IS BEING LEASED TO KENNELS BEACH IMPROVEMENT ASSOCIATION.
3. TOTAL AREA IN TRACT IS: 0.30 ACRES.
TOTAL IINEAR JMIPF SHORELINE IS: 572.5 LINEAR FEET.
\A cAAa
®® ° °eooeoo°
° °OFESS /p°°
'
,iu42
L
p c�
us p9 °° �V
®r��J C1 e C (y'�" %
tkO \
?' \
\
\
LEGEND: ICO
S0
DUCK CREEK
C js
le
aaRR" �`�� ��Cl
�o
4' 4 ��
3o \� ? •��g \
O {�
\ e o x
IPS.... ........�..._..._._........1xOD PIPE S):P \
PIPE FOUND
DR .........__._........._....DEED BOOK �wYc
PC. c o,,�
PP _. _ _ _ __ _ . POWER POLE 'qR�
R/W .._ _.... _...__...._ RIGHT of WHY
CMS _ �.__ _. _ _._collcREiE MONUMENT SET
CPU __...._._.r....._... ... CONCRETE MONUMENT FOUND
NONUMENTED POINT
x x x x— FENCE=
DENNIS FORNES & ASSOCIATES, PROFESSIONAL LAND SURVEYING
1266 ROBERTS RD., GRANTSBORO, NC 28529 Tele: 252.249.0488
te, _�N- a1%
4
n
pmed
sue Padua. '
L bcm05A Nao a, ° am° (N,cs taus)
IL . 1114
At�ehoe
`\ �.csg• qua
SHEET ONE OF THREE
MASTER SITE PLAN
EXISTING CONDITIONS
PROPOSED PIER AND SLIP CONSTRUCTION
KENNELS BEACH COMMUNITY
BY MR. JOSEPH TARLTON, ETALS.
NUMBER FIVE TOWNSHIl', PAMLICO COUNTY
NORTH CAROLINA
SCALE: 1" = 50' DECEMBER12, 2012
0 25 50 100 150
GRAPHIC SCALE
SHEET ONE OF TIMEE
PLAT REVISED JANUARY 21, 2013 TO REFLECT THE LOCATION O:
PIERS AND SLIPS CURRENTLY EXISTING.
� l
!ar ----------------------
URVEYOR ia�o06886811,f �
o ®®
7
°
8 c" C- 3,';42 a
\ .�
G® °OOSOa°o ° °a `k"
��ZS(tot3
CHRRT ONE
+- -y'
x �% \ \ o
% d\
)c \ \
o.° \ \ \ \
ell
4%�n
\Tf �
F
SHEET THREE OF THREE os� &4N o-dS
MASTER SITE PLAN Giro ��- 1o��`Svti4�
PROPOSED SITE IMPROVEMENTS ohs\
PROPOSED PIER AND SLIP CONSTRUCTION
KENNELS BEACH COMMUNITY
BY MR. JOSEPH TARLTON, ETALS.
NUMBER FIVE TOWNSHIP, PANILICO COUNTY 6•
NORTH CAROLINA �, z 00,
SCALE: 1" = 50' DECEMBER 10, 2012
0 25 50 100 150
GRAPHIC SCALE
SHEET THREE OF THREE
\ o
140'
SIDE VIEW OF PROPOSED DOCK
SCALE: 1" = 20' HORIZONTAL
RAMP DOWN +/- 6 INCHES
5' WIDE WALKWAY/WITH 6" x 6" STRINGERS & HEADERS
depth of river vanes from 2.5' feet deep to 4.0' feet deep
8 " diameter
treated piling @
10' center to center
REVISED JANUARY 21, 2013 ADDED NORTH ARROW, SLIP NUMBERING AND DIMENSIONS
SCALE FOR INSETS, AND WIDTH OF RIVER ADDED WATER DEPTH INFORMATION.
x
a
0 0,
PRECAST
PANELS
covered 10' X 30'
boat lift Platform "T"
(open sided)
0
< C
2-9
M P—
y y
Plan View
Typical Dock Construction
Precast Concrete Panels
1" = 5' APPROX.
�
6x
s
x
ro =_
0 0,
PRECAST
PANELS
covered 10' X 30'
boat lift Platform "T"
(open sided)
0
< C
2-9
M P—
y y
Plan View
Typical Dock Construction
Precast Concrete Panels
1" = 5' APPROX.
'� IiIP� � IIIE
..tei .. a.,. ws.,
vaaan4 m.m.ur
REVISED: 02 -08 -2013 TO REFLECT NAME OF RIVER
DENNIS FORNES, PLS- L3042NC
S
o i
ao
ro _
�o
M
m
a
P
k
r
N
m
a
m
m
, , .1
s
—
ro =_
'� IiIP� � IIIE
..tei .. a.,. ws.,
vaaan4 m.m.ur
REVISED: 02 -08 -2013 TO REFLECT NAME OF RIVER
DENNIS FORNES, PLS- L3042NC
S
o i
ao
ro _
�o
M
m
a
P
k
r
N
m
a
m
m
, , .1