Loading...
HomeMy WebLinkAbout20100099 Ver 2_Mitigation Plans_20120101ADDENDUM TO MITIGATION PLAN PANCHO MITIGATION BANK Developed Through RESTORATION AND ENHANCEMENT OF KENNEDY MILL BRANCH, UNNAMED TRIBUTARIES, AND RIVERINE WETLANDS Wayne County, North Carolina Axiom Environmental, Inc, PREPARED BY: RESTORATION SYSTEMS, LLC 1101 HAYNES STREET, SUITE 211 RALEIGH, NORTH CAROLINA 27604 AXIOM ENVIRONMENTAL, INC. 218 SNOW AVENUE RALEIGH, NORTH CAROLINA 27603 JANUARY 2012 EXECUTIVE SUMMARY This mitigation plan includes 1) restoration (priority I) of 5322 linear feet of streams, 2) restoration of 1137 linear feet of braided Coastal Plain stream, 3) enhancement (level I) of 803 linear feet of stream, 4) enhancement (level II) of 3220 linear feet of stream, 5) restoration of 29.0 acres of jurisdictional wetland, 6) enhancement of 1.5 acres of cleared jurisdictional wetlands, 7) preservation of 0.5 acres of forested jurisdictional wetland, and 8) establishment of a permanent conservation easement to encompass all mitigation activities, as well as a minimum 50 -foot wooded riparian buffer adjacent to wetlands and streams. Mitigation options outlined in this report are as follows. Proposed Mitigation Activity Proposed Mitigation Mitigation Ratio Proposed Credits Streams (linear feet) Riparian Wetlands (acres) Stream Credits Riparian Wetland Credits Stream Restoration 6459 1:1 6459 Stream Enhancement I 803 1.5:1 535 Stream Enhancement II 3220 2.5:1 1288 Wetland Restoration 29.0 1:1 29.0 Wetland Enhancement 1.5 2:1 0.8 Wetland Preservation 0.5 5:1 0.1 Totals 10,482 31.0 8282 29.9 After completion, the Bank will offer 8282 stream mitigation credits and 29.9 riparian wetland mitigation credits as determined using interagency guidelines outlined below. This addendu►n has been requested by the interagency review team (IRT) and prepared by Restoration Systems to clarify changes proposed at the Pancho Mitigation Bank. Changes include modifications to upstream reaches associated with Kennedy Mill Branch and the Main Tributary. These reaches were initially proposed as stream Preservation and no mechanized work was to be conducted in these locations. Proposed changes include raising the channel bed with suitable backfill material to reduce impoundment of the channels and conversion of these areas from Preservation to Enhancement Level II (see Figure A, attached). Raising the channel bed in these reaches is necessary to tie the proposed channel bed to the historic floodplain elevation (Priority 1 Restoration) in the stream restoration portions of the Bank. Raising the channel bed will entail tilling the channel with suitable material. Channels will be filled to within approximately 1 foot of the floodplain surface at the tie -in with Restoration reaches and will taper back to the existing channel bed as the reach extends upstream. The result is an increase in floodplain connection, bank stabilization, and general function uplift as you progress downstream from the upstream, project terminus. Therefore, the downstream portions of channel backfill have been proposed as Enhancement Level 1, with the upstream portions of channel backfill proposed as Enhancement Level 11. Mitigation Plan Executive Summmy page i Pancho Stream and Wetland Mitigation Bank Restoration Systems, LLC Enhancement Level II areas will be tilled to the appropriate elevation to conduct downstream work, will receive spot bank stabilization were necessary (matting, bank sloping, removal of compromising woody debris, etc.), and will have Chinese privet (Ligustrum sinense) eradicated within the riparian buffer. Areas proposed for Enhancement Level II are expected to receive functional improvements including, but not limited to the following. Feature Longitudinal Profile — It is anticipated that raising the streambed as proposed in Figure A and cross - sections (See Appendix A) will improve the longitudinal profile in the lower reaches of these sand -bed stream reaches so they will no longer be considered "substantially" altered. Sims of Active Instability — It is anticipated that the raising of the streambed, flattening of streambed slope, and spot bank stabilization will reduce energy on stream banks, resulting in improved stabilization of the stream bed and banks. Streamside Area Interaction — It is anticipated that raising the streambed will improve streamside area interaction adjacent to the enhancement reaches. Streamside area interaction is expected to improve as you move downstream from the upstream project terminus. Enhancement Level II reaches are not expected to restore this function to reference conditions, however, improvements over the existing condition may be expected. Vegetative Composition — The existing, degraded vegetative composition is primarily a result of the existence of extensive stands of Chinese privet within the streamside area. The removal of privet is anticipated to result in improved habitat function adjacent to the Enhancement reaches. Mitigation Plan Executive Summary page ii Pancho Stream and Wetland Mitigation Bank Restoration Systems, LLC 2.0 OBJECTIVES These goals will be achieved by the following. Providing 8282 stream mitigation credits by the following. • Enhancing (Level I) approximately 803 linear feet of stream channel by removing invasive species, protecting desirable hardwood trees greater than 4 inches in diameter at breast height to the maximum extent possible, restoring overbank flooding /hydrodynamics by raising the bed elevation, sloping channel banks, alter channel slopes to reduce bank erosion, modify woody debris in channels to promote habitat, and supplementally planting where necessary. • Enhancing (Level 11) approximately 3220 linear feet of stream channel by slightly improving floodplain access, providing bank stabilization in highly eroded portions of the channel, and removing invasive species adjacent to the channel. 6.1 CREDIT DETERMINATION The Bank encompasses Kennedy Mill Branch, unnamed tributaries to Kennedy Mill Branch, and associated wetlands /hydric soils and floodplains. Bank mitigation options outlined in this report are as follows. Table 10. Proposed Mitigation Quantities vs. Mitigation Credits Proposed Mitigation Activity Proposed Mitigation Mitigation Ratio Proposed Credits Streams (linear feet) Riparian Wetlands (acres) Stream Credits Riparian Wetland Credits Stream Restoration 6459 1:1 6459 Stream Enhancement I 803 1.5:1 535 Stream Enhancement II 3220 2.5:1 1288 Wetland Restoration 29.0 1:1 29.0 Wetland Enhancement 1.5 2:1 0.8 Wetland Preservation 0.5 5:1 0.1 Totals 10,482 31.0 8282 29.9 After completion, the Bank will offer 8282 stream mitigation credits and 29.9 riparian wetland mitigation credits as determined using interagency guidelines outlined in Stream Mitigation Guidelines (USACE et al 2003) and Information Regarding Stream Restoration with Emphasis on the Coastal Plain — Draft (USACE et al 2007). Proposed mitigation units are depicted on Figure 6 (Appendix A). 7.2 STREAM ENHANCEMENT (LEVEL I) Stream enhancement (level I) is proposed for two reaches within the Site: l) the upstream reach of Kennedy Mill Branch and 2) the upstream reach of the Main Tributary (Figure 6, Appendix A). Enhancement (level I) will entail shallowing the channel from a depth of 5 feet to a depth of Mitigation Plan page 1 Pancho Strewn and Wetland Mitigation Bank Restoration Systems, LLC I to 2 feet, contouring stream banks, removing invasive plant species, and supplemental planting, as necessary. Channel shallowing is required to conduct priority 1 stream restoration in agricultural portions of the Bank and till is expected to taper back to natural grade in the upstream reaches. All channel work will be completed in a manner to cause as little disturbance to the existing vegetation as feasible and desirable hardwood trees greater than 4 inches in diameter at breast height will be avoided to the maximum extent possible. Enhancement (level I) should promote overbank flooding, reduced shear stress /sedimentation, improved water quality functions, and improved aquatic and wildlife habitat associated with a stable riparian corridor /stream. 7.3 STREAM ENHANCEMENT (LEVEL II) Stream enhancement (level II) is proposed for two locations within the Bank: 1) the northern reaches of Kennedy Mill Branch, downstream of Stevens Mill Road and 2) the extreme upper reaches of Kennedy Mill Branch and the Main Tributary (Figure 6, Appendix A). Stream enhancement (level II) downstream of Stevens Mill Road will entail the cessation of current land management practices, removal of spoil material along the stream banks, and planting riparian buffers with native forest vegetation. Riparian buffers will extend a minimum of 50 feet from the top of stream banks to facilitate stream recovery and prevent further degradation of the stream. Stream enhancement (level 11) in the upper reaches of Kennedy Mill Branch and the Main Tributary will entail filling the channels to the appropriate elevation to conduct downstream work, spot bank stabilization were necessary (matting, bank sloping, removal of compromising woody debris, etc.), and control of Chinese privet (Ligustrum sinense) within the riparian buffer. Enhancement (level II) should slightly improve overbank flooding, improve bank stability, and enhance the riparian buffer. 7.4 STREAM PRESERVATION Stream preservation has been removed from the Bank. Stream Enhancement level II has replaced preservation on the upstream reaches of Kennedy Mill Branch and the Main Tributary as described in Section 7.3 of this document. 9.1 STREAM SUCCESS CRITERIA Priority I Restoration Kennedy Kennedy Mill Branch, Main Tributary, UTs 5 -6 Performance standards for channels where work includes construction of pattern, dimension, and /or profile (e.g., Priority I and II Restoration) shall be in accordance with the Stream Mitigation Guidelines, dated April 2003, listed below. These stream systems, which include Kennedy Mill Branch, the Main Tributary, and UTs 5 -6 on the Restoration Plan (Figures 7A -7B, Appendix A), are subject to the performance standards listed below. 1. Photo reference sites should show no substantial aggradation, degradation, or bank erosion. Mitigation Plan page 2 Pancho Stream and Wetland Mitigation Bank Restoration Systems, LLC 2. Channel stability (monitored using cross - sections, longitudinal profiles, and photographic documentation of substrate) should demonstrate no more than minimal evidence of instability (down- cutting, deposition, bank erosion, or increase in sands or finer substrate material). Enhancement (Level I) Reaches Kennedv Mill Branch, Main Tributary (upper reaches) Performance standards for Enhancement Level I reaches shall be similar to Restoration performance standards; however, these channels would be expected to aggrade over time as sediment moves into, and through the reach. These stream systems which include the upper, forested reaches of Kennedy Mill Branch and the Main Tributary immediately upstream of Priority 1 restoration areas (Figures 7A -713, Appendix A) are subject to the performance standards listed below. 1. Photo reference sites should show no substantial bank erosion. 2. Channel stability (monitored using cross- sections and photographic documentation) should demonstrate no more than minimal evidence of instability (down - cutting and bank erosion). 3. Linear transects within the adjacent buffer to determine if enhancement efforts result in mortality of existing, forested vegetation. 4. Crest gauge should show connection of the channel with the floodplain for the downstream portions of the enhancement (level I) channels. Enhancement (Level II) Reaches Kennedv Mill Branch, Main Tributary Performance standards for enhancement (level II) reaches shall be commiserate with the proposed functional uplift. Similar to enhancement (level 1) reaches, these channels would be expected to aggrade over time as sediment moves into, and through the reach. Enhancement (level I) reaches include the upper, forested reaches of Kennedy Mill Branch and the Main Tributary immediately upstream of enhancement (level 1) areas (Figures 7A -713, Appendix A) are subject to the performance standards listed below. 1. Photo reference sites should show no substantial bank erosion. 2. Channel stability (monitored using cross- sections and photographic documentation) should demonstrate evidence of improved stability over existing conditions. 3. Crest gauge should show limited connection of the channel with the floodplain for the downstream portions of the enhancement (level II) channels. These channels will remain incised and are expected to show limited connection with the adjacent floodplain. 10.1 STREAM MONITORING Priority I Restoration Reaches Kennedy Mill Branch, Main Tributary, UTs 5 -6 Annual monitoring will include development of channel cross - sections on riffles and pools, and a water surface profile of the channel in priority I stream restoration reaches. The data will be Mitigation Plan page 3 Pancho Steam and Wetland Mitigation Bank Restoration Systems, LLC presented in graphic and tabular format. Data to be presented will include 1) cross - sectional area, 2) bankfull width, 3) average depth, 4) maximum depth, 5) width -to -depth ratio, and 6) water surface slope. A photographic record of preconstruction and post- construction pictures will also be compiled. Enhancement (Level I) Reaches Kennedv Mill Branch and Main Tributai-v Annual monitoring will include development of channel cross - sections on riffles and pools in enhancement (level I) stream reaches. The data will be presented in graphic and tabular format. Data to be presented will include 1) cross - sectional area, 2) bankfull width, 3) average depth, 4) maximum depth, and 5) width -to -depth ratio. A photographic record of preconstruction and post - construction pictures will also be compiled. In addition, linear transects will be monitored adjacent to the stream enhancement (level I) reach to access any existing mature tree mortality due to changes in hydrology. This information will be reported in the annual monitoring report but will not be tied to performance standards. Enhancement (Level II) Reaches Kennedv Mill Branch and Main Tributary Annual monitoring will include development of channel cross - sections on riffles and pools in enhancement (level 1I) stream reaches. The data will be presented in graphic and tabular format. Data to be presented will include 1) cross- sectional area, 2) bankfull width, 3) average depth, 4) maximum depth, and 5) width -to -depth ratio. A photographic record of preconstruction and post- construction pictures will also be compiled. Mitigation Plan page 4 Pancho Stream and Wetland Mitigation Bank Restoration Systems, LLC APPENDIX A FIGURES Mitigation Plan Appendices Pancho Stream and Wetland Mitigation Bank Restoration Systems, LLC Elev acell z st�ratl `� 44": �Jy 5 vlto ral !a ES« Legend Easement Boundary Major Contour Minor Contour Priority 1 Stream Restoration - 5,322 ft QgP4q Braided Stream Restoration - 1,137 it Stream Enhancement Level 1 - 803 ft Stream Enhancement Level 2 - 3,220 ft ® Abandoned Channel and Ditch Backfill IIIIIIIIIIIIIII� Spoil Removal Log Vane Cross Vane Stream Enhancement Level 1 549 ft o. o� ,Trib ry 2 Tribitary 1 Singgle Th in Wetlan Restorati Figure 7B Axiom Environmental, Inc. read Channel d Complex on 477 ft Stream Enhancement Level 1 254 ft Kennedy MITI Br Start Restoration Sta 00 +00 Eiev 91.31 \ Main Tributary Start Restoration S a 00+00 Elev 90.5 Project: Pancho Mitigation Bank Wayne County North Carolina Title: Restoration Plan Cale: FIGURE NO. 1 in = 200 ft 7A Date: July 2010 Project No.: 10-010 i Easement Boundary Major Contour -- Minor Contour Priority 1 Stream Restoration - 5,322 ft Stream Enhancement Level 1 - 803 ft Stream Enhancement Level 2 - 3220 ft Cross Vane Abandoned Channel and Ditch Backfill Log Vane { Cross Vane Kennedy Mill Br Start Restoration Sta 00 +00 End Enhancement Level 1 Elev 91.31 XS 1 (Sta 00 +00) XS 2 (Sta 02 +19) Stream Enhancement Level 1 549 It XS 3 (Sta 06 +31) XS 4 (Sta 09 +25) XS 5 (Sta 12 +39) t✓ XS 6 (Sta 13 +34) R / Start Enhancement Level 2 Sta 13 +34 Elevation at grade 7, viS r I i Stream Enhancement Level 2 785 it Main Tributa y r Sta 00 st ration End Enhancement Level 1 Elev 90.5 105 •��� *.__ XS 1 (Sta 00 +00) Axiom Environmental, Inc. 110 XS 2 (Sta 04 +47) XS 3 (Sta 05 +68) XS 4 (Sta 06 +79) l J� 'J• XS 5 (Sta 07 +87) Stream Enhancement Level 1 254 ft Stream \ Enhancement Level 2 598 it Start Enhancement Level 2 Sta 08 +52 Elevation at grade Main Tributary 98 96 94 o` 92! r 90 0 88 86 0 100 200 300 400 500 600 700 800 900 fitatien(feet) —10-Existing Channel Bed "1111-Proposed Channel Bed "t"Topaank Note: Pools are not depicted in profile due to scale. Pool locations will be determined In the field during construction. Kennedy Mill Branch 9fi 94 `— 92 n 90 288 86 0 200 400 600 800 loco 1200 1400 Station (feet) —0— Existing Channel Bed ('Proposed Channel Bed -h—Top Bank Note: Pools are not depicted in profile due to scale. Pool locations will be determined in the field during construction. Project: Pancho Mitigation Bank Wayne County North Carolina Title: Enhancement Reaches scale: FIGURE NO. 1 in = 200 ft Date: A December 2010 Project No.: 10 -010 Site Bankfull Elevation: Panclio Bankfull Cross- Sectional Area: 12.3 Bankfull Width: 19. I Stream 92.9 Kennedy Mill Branch 120.0 Max Depth at Bankfull: 0.8 Mean Depth at Bankfull: XS ID W / D Ratio: XS - 1 (Station 00 +00) Entrenchment Ratio: 63 Ratio: 3A Drainage Area s mi): 1.7 Date: ]2/4/2012 Field Crew: K2 Design and Lewis Station Elevation SUMMARY DATA - PRCCONSTRUC "PION 0.00 92.44 Bankfull Elevation: 88.4 8.42 92.30 Bankfull Cross - Sectional Area: 12.6 11.37 9131 Bankfull Width: 89 1633 9130 Flood Prone Area Elevation: 90.1 18.19 9130 Flood Prone Width: 13.0 2020 . 9130 Max Depth at Bankfull: 1.7 2429 91.30 Mean Depth at Bankfull: L4 28.80 92.19 W / D Ratio: 63 34.94 92.73 Entrenchment Ratio: I S Bank Height Stream Type G Stream Type C Pancho - Kennedy Mill Branch, XS - 1, (Station 00 +00) 94 - 93 92 91 0 90 89 W 88 87 86 0 10 20 30 40 Station (feet) SU111i19:�121' DATA - POST CONSTRUCTION Bankfull Elevation: 92.1 Bankfull Cross- Sectional Area: 12.3 Bankfull Width: 19. I Flood Prone Area Elevation: 92.9 Flood Prone Width: 120.0 Max Depth at Bankfull: 0.8 Mean Depth at Bankfull: 0.6 W / D Ratio: 29.7 Entrenchment Ratio: 63 Ratio: 3A SU111i19:�121' DATA - POST CONSTRUCTION Bankfull Elevation: 92.1 Bankfull Cross- Sectional Area: 12.3 Bankfull Width: 19. I Flood Prone Area Elevation: 92.9 Flood Prone Width: 120.0 Max Depth at Bankfull: 0.8 Mean Depth at Bankfull: 0.6 W / D Ratio: 29.7 Entrenchment Ratio: 63 Bank Height Ratio: l .l -------------------------------------------------------------- r � IIankfiill - -- -Flood Prone Area �� Preconstruction Post Construction Site Bankfull Elevation: R Pancho Bankfull Crass - Sectional Area: 1 12 Bankfull Width: 1 Stream Flood Prone Area Elevation: 9 Kennedy Mill Branch Design and Lewis XS ID XS - 2 Station 02 +19) Drainage Area s mi : 1.7 Date: 12/4/2012 Field Crew. K2 Station Elevation 0.00 93.84 5.90 93.33 .4 11.58 91.51 14.75 91.41 15.95 91.41 20.34 91.41 23.87 91.41 27.13 91.41 31.25 93.40 38.48 93.34 Stream Type G Stream Type Cg Pancho - Kennedy Mill Branch, XS - 2, (Station 02 +19) 95 94 93 92 0 91 c 9Bankfull W 89 88 ru 87 0 10 20 30 40 Station (feet) SUMMARY DATA - PRECONSTRUCTION Bankfull Elevation: R R27 Bankfull Crass - Sectional Area: 1 12 Bankfull Width: 1 11.7 Flood Prone Area Elevation: 9 91.1 � Design and Lewis SUMMARY DATA - PRECONSTRUCTION Bankfull Elevation: R R27 Bankfull Crass - Sectional Area: 1 12 Bankfull Width: 1 11.7 Flood Prone Area Elevation: 9 91.1 � SUMMARY DATA -POST CONSTRUCTION Bankfull Elevation: 92.1 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: 19.0 Flood Pronerea Elevation: 92.8 Flood Prone Width: 23.0 Max Depth at Bankfull: 0.7 Mean Depth at Bankfull: - 0.7 W / D Ratio: 29.1 Entrenchment Ratio: 1.2 Bank Height Ratio: 2.7 Bankfull - -- -Flood Prone Area Preconstruction Post Constction Bankfull - -- -Flood Prone Area Preconstruction Post Constction Site Bankfull Elevation: Pancho Bankfull Cross - Sectional Area: 12.4 Bankfull Width: Stream 1.7 Kennedy Mill Branch 12/4/2012 Field Crew: K2 Design and Lewis XS ID Mean Depth at Bankfull: XS - 3 (Station 06 +31) W / D Ratio: 7.4 Entrenchment Ratio: Drainage Bank Height Ratio: 2.1 o � 92 Station Elevation `u 91 - -- -Flood Prone Area 7.07 94.74 Preconstruction 11.29 93.50 89 13.71 91.61 0 10 20 30 40 Station (feet) 16.07 91.61 19.46 91.61 22.94 91.61 26.44 93.49 32.91 94.63 Stream Type G Stream Type Cg SU�IMAI2Y DATA - P12ECONSTRUC'fION Bankfull Elevation: 91.3 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: Area s mi : 1.7 Date: 12/4/2012 Field Crew: K2 Design and Lewis SU�IMAI2Y DATA - P12ECONSTRUC'fION Bankfull Elevation: 91.3 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: 9.6 Flood Prone Area Elevation: 93.3 Flood Prone Width: 14.5 Max Depth at Bankfull: 2.0 Mean Depth at Bankfull: 1.3 W / D Ratio: 7.4 Entrenchment Ratio: 1.5 Bank Height Ratio: 2.1 SUMMA121' DATA - POST COiVSTROCTION Bankfull Elevation: 92.7 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: 12.8 Flood Prone Area Elevation: 93.8 Flood Prone Width: 19.0 Max Depth at Bankfull: 1.1 Mean Depth at Bankfull: 1.0 W / D Ratio: 132 Entrenchment Ratio: 1.5 Bank Height Ratio: 1.7 Pandto - Kennedy Mill Branch, XS - 3, (Station 06 +31) 96 95 94 ____ ___ ___ ____ _-------- ---- ----- - - - --- - - -- ° -- o 93 o � 92 - Bankfull `u 91 - -- -Flood Prone Area 90 Preconstruction Post Construction 89 0 10 20 30 40 Station (feet) Site Bankfull Elevation: Pancho Bankfull Cross-Sectional Area: 12.6 Bankfull Width: Stream Flood Prone Area Elevation: Kennedy Mill Branch Flood Prone Width: 17.0 and Lewis XS 1D Mean De th at Bankfull: XS - 4 Station 09 +25) W / D Ratio: 11.4 Entrenchment Ratio: Drainage Area s mi : 1.7 3.4 Date: 12/4/2012 Field Cre�r. IC2 Design Station Elevation 0.00 96.01 5.17 96.02 9.83 95.17 14.92 92.36 19.92 91.75 24.54 91.75 27.74 91.75 31.91 95.07 37.33 95.75 Stream Type G Stream Type Ge Pancho - Kennedy Mill Branch, XS - 4, (Station 09 +25) 97 96 95 94 0 93 d 92 W 91 90 89 0 10 20 30 40 Station (feet) SL:14MA12Y DATA - PRECONSTRUCTION Bankfull Elevation: 91.7 Bankfull Cross-Sectional Area: 12.6 Bankfull Width: 12.0 Flood Prone Area Elevation: 93.1 Flood Prone Width: 17.0 and Lewis SL:14MA12Y DATA - PRECONSTRUCTION Bankfull Elevation: 91.7 Bankfull Cross-Sectional Area: 12.6 Bankfull Width: 12.0 Flood Prone Area Elevation: 93.1 Flood Prone Width: 17.0 Max Depth at Banldull: 1.4 Mean De th at Bankfull: l .l W / D Ratio: 11.4 Entrenchment Ratio: 1.4 Bank Height Ratio: 3.4 SUMMARY DATA -POST CONSTRUCTION Banldull Elevation: 92.8 Bankfull Cross - Sectional Area: 12S Bankfull Width: 14.9 Flood Prone Area Elevation: 93.8 Flood Prone Width: 19.0 Max Depth at Bankfull: 1.0 Mean Depth at Bankfull: 0.8 W / D Ratio: 17.8 Entrenchment Ratio: 1.3 Bank Height Ratio: 3.3 - - -- Bankfull - -- -Flood Prone Area �- Preconstniction Post Construction Site Bankfull Elevation: Pancho Bankfull Cross - Sectional Area: 12.4 Bankfull Width: Stream Flood Prone Area Elevation: Kennedy Mill Branch Flood Prone Width: 16.0 and Lewis XS ID Mean Depth at Bankfull: XS - S (Station 12 +39) \V / D Ratio: 8 6 Entrenchment Ratio: Drainage Area s mi): 1.7 2.8 Date: 12/4/2012 0 94 Field Crew: K2 Design W Station Elevation 91 Preconstmction - - - 0.00 96.47 PostConshvction 5.62 96.07 0 10 20 30 40 Slntion (feel) 10.03 93.12 13.40 92.08 16.01 91.90 20.87 91.90 22.61 94.64 27.23 96.88 34.26 96.99 Stream Type Ge Stream Type Gc SUM MARY' llA'I'A - PRECONSTRUCTION Bankfull Elevation: 92.7 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: 10.3 Flood Prone Area Elevation: 94.6 Flood Prone Width: 16.0 and Lewis SUM MARY' llA'I'A - PRECONSTRUCTION Bankfull Elevation: 92.7 Bankfull Cross - Sectional Area: 12.4 Bankfull Width: 10.3 Flood Prone Area Elevation: 94.6 Flood Prone Width: 16.0 Max Depth at Bankfull: 1.9 Mean Depth at Bankfull: 1.2 \V / D Ratio: 8 6 Entrenchment Ratio: I .6 Bank Height Ratio: 2.8 SUMMARY D: \'1'A -POST CONSTRUCTION Bankfull Elevation: 93.2 Bankfull Cross- Sectional Area: 125 Bankfull Width: 11.9 Flood Prone Area Elevation: 945 Flood Prone Width: 1 �.0 Max Depth at Bankfull: 13 Mean Depth at Bankfull: 1.1 \V / D Ratio: I I.3 Entrenchment Ratio: 1.3 Bank Height Ratio: 3? Pancho - Kennedy Mill Branch, XS - 5, (Station 12 +39) 98 97 96 0 94 W 92 -- -Flood Prone Area 91 Preconstmction - - - PostConshvction 90 0 10 20 30 40 Slntion (feel) Site Bankfull Elevation: Pancho Bankfull Cross-Sectional Area: 12.4 Bankfull Width: Stream 1 .7 Kennedy Mill Branch 12/4/2012 Field Crew: K2 Design and Lewis XS ID Mean Depth at Bankfull: XS - 6 (Station 13 +34) W / D Ratio: 9.4 Entrenchment Ratio: Drainage Bank Height Ratio: 2.9 Station Elevation 0.00 96.90 5.72 93.85 10.85 94.60 1456 91.93 20.45 92.23 24.77 94.00 30.27 94.85 35.48 96.89 42.10 97.02 Stream Type G Stream Type E Pancho - Kennedy Mill Branch, XS - 6, (Station 13 +34) 98 97 96 v `u 95 0 94 m W 93 92 91 0 10 20 30 40 Station (feet) SUMMARY DATA - P12ECONSTRUCTION Bankfull Elevation: 93.3 Bankfull Cross-Sectional Area: 12.4 Bankfull Width: Area s mi): 1 .7 Date: 12/4/2012 Field Crew: K2 Design and Lewis SUMMARY DATA - P12ECONSTRUCTION Bankfull Elevation: 93.3 Bankfull Cross-Sectional Area: 12.4 Bankfull Width: 10.8 Flood Prone Area Elevation: 95.2 Flood Prone Width: 28.0 Max Depth at Banldull: 1.9 Mean Depth at Bankfull: 1.1 W / D Ratio: 9.4 Entrenchment Ratio: 2.6 Bank Height Ratio: 2.9 SUMMARY DATA -POST CONSTRUCTION Bankfull Elevation: 93.5 Bankfull Cross - Sectional Area: 128 Bankfull Width: 1 1.3 Flood Prone Area Elevation: 95.1 Flood Prone Width: 28.(1 Max Depth at Bankfull: 1.6 Mean Depth at Bankfull: l .l W / D Ratio: 10.2 Entrenchment Ratio: 2.5 Bank Height Ratio: 3.1 - -- -Flood Prone Area Preconstniction Post Construction Site Pancho Stream Main Tributary XS ID XS - 1 (Station 00 +00) Drainage Area (sq mi): 1.1 Date: 12/4/2012 Field Crew: K2 Design and Lewis Station Elevation 0.00 92.53 1.74 92.39 4.94 92.95 8.99 93.19 13.24 92.81 15.42 91.83 18.54 91.50 19.78 91.50 21.67 91.50 23.63 91.50 25.28 91.50 25.90 91.50 27.35 91.50 28.88 91.50 30.04 91.50 31.44 91.50 33.04 92.12 36.82 93.03 42.46 93.77 45.90 9171 86 0 10 20 Station (feet) 30 40 SUMMARY DATA - PRECONSTRUCTION Bankfull Elevation: 87.8 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: 10.9 Flood Prone Area Elevation: 88.9 Flood Prone Width: 13.0 Max Depth at Bankfull: 1.1 Mean Depth at Bankfull: 0.8 W / D Ratio: 13.1 Entrenchment Ratio: 1.2 Bank Height Ratio: 4.9 SUMMARY DATA - POST CONSTRUCTION Bankfull Elevation: 92.1 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: 18.0 Flood Prone Area Elevation: 92.7 Flood Prone Width: 52.0 Max Depth at Bankfull: 0.6 Mean Depth at Bankfull: 0.5 W / D Ratio: 35.6 Entrenchment Ratio: 2.9 Bank Height Ratio: 1.0 Stream Type I G/F IStream Type C Pancho - Main Tributary, XS - 1, (Station 00 +00) 95 94 93 -- ------- - - - --- ---- ------------------- °--- - - - - -- - - - - -- 92 r 91 .` W 90 89 88 87 - - -- Bankfull - - - - Flood Prone Area +Preconstruction Post Construction 86 0 10 20 Station (feet) 30 40 Site Bankfull Elevation: Pancho Bankfull Cross - Sectional Area: 9. I Bankfull Width: Area s mi : Stream Date: Main Tributaiv Field Crew: I{2 Design and Lewis 0.9 Mean Depth at Bankfull: XS ID W / D Ratio: XS - 2 (Station 04 =47) Entrenchment Ratio: I.l Bank Height Ratio: 5.3 Drainage 0 92 91 - 90 89 --- -Banldull - -- -Flood Prone Area t` Preconstruction Post Construction 88 0 10 20 Station (feet) 30 40 Station Elevation 0.00 95.34 5.17 94.99 8.34 94.58 11.26 93.04 13.42 91.26 13.63 91.26 19.43 91.26 24.28 91.26 26.16 91.26 27.91 93.29 31.88 94.57 35.77 94.97 Stream Type G/P Stream Type F/C 4423 95.34 SUMMARY DATA - PRECONSIRUCTION Bankfull Elevation: 89.4 Bankfull Cross - Sectional Area: 9. I Bankfull Width: Area s mi : l .l Date: 12/4/2012 Field Crew: I{2 Design and Lewis SUMMARY DATA - PRECONSIRUCTION Bankfull Elevation: 89.4 Bankfull Cross - Sectional Area: 9. I Bankfull Width: 12.1 Flood Prone Area Elevation: 90.3 Flood Prone Width: 13.0 Max Depth at Bankfull: 0.9 Mean Depth at Bankfull: 0.8 W / D Ratio: 16.1 Entrenchment Ratio: I.l Bank Height Ratio: 5.3 SU'�9MA121' DATA -POST CONSTRUCTION Bankfull Elevation: 91.9 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: 14.1 Flood Prone Area Elevation: 92.6 Flood Prone Width: 15.0 Max Depth at BankFull: 0.7 Mean Depth at Bankfull: 0.6 VV / D Ratio: 21.5 Entrenchment Ratio: 1. I Bank Height Ratio: 29 Pancho -Main Tributary, XS - 2, (Station 04 +47) 96 95 94 93 0 92 91 - 90 89 --- -Banldull - -- -Flood Prone Area t` Preconstruction Post Construction 88 0 10 20 Station (feet) 30 40 Site Bankfull Elevation: Pancho Bankfull Cross - Sectional Area: 9.1 Bankfull Width: Stream l.] Main Tributary 1 2/4/2012 Field Crew: K2 Design and Lewis XS ID Mean Depth at Bankfull: XS - 3 (Station 05 +68) W / D Ratio: 10.8 Entrenchment Ratio: Drainage Bank Height Ratio: 4.2 93 0 ti -- Bani:full W 91 - -- -Flood Prone Area Station Elevation Post Construction 0.00 95.90 0 10 20 30 40 8.66 96.17 14.03 95.70 16.89 91.18 18.72 91.18 22.10 91.18 26.10 91.18 27.63 92.65 32.76 94.73 36.77 95.55 Stream Type G Stream Type Gc SUMMARY DATA - PRGCONSTRUCTION Bankfull Elevation: 90.9 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: Area s mi : l.] Date: 1 2/4/2012 Field Crew: K2 Design and Lewis SUMMARY DATA - PRGCONSTRUCTION Bankfull Elevation: 90.9 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: 9.9 Flood Prone Area Elevation: 92.1 Flood Prone Width: 1 1.0 Max Depth at Bankfull: 1.2 Mean Depth at Bankfull: 0.9 W / D Ratio: 10.8 Entrenchment Ratio: 1.1 Bank Height Ratio: 4.2 SUMMA121' llA "CA -POST CONSTRUCTION Bankfull Elevation: 92.1 Bankfull Cross - Sectional Area: 9.2 Bankfull Width: 10.7 Flood Prone Area Elevation: 93.0 Flood Prone Width: 13.0 Max Depth at Bankfull: 0.9 Mean Depth at Bankfull: 0.9 W / D Ratio: 12.4 Entrenchment Ratio: 1.2 Bank Height Ratio: 3.9 Pancho -Main Tributary, XS - 3, (Station 05+68 97 96 - 95 94 93 0 ti -- Bani:full W 91 - -- -Flood Prone Area 90 - 0-Preconstruction - Post Construction 89 0 10 20 30 40 Station (feet) Site Bankfull Elevation: Pancho Bankfull Cross - Sectional Area: 9.1 Bankfull Width: Stream l .l Main "1'ributary ] 2/4/2012 Field Crew. IC2 Design and Lewis YS ID Mean Depth at Bankfull: XS - 4 (Station 06 +79) W / D Ratio: 12.8 Entrenchment Ratio: Drainage Bank Height Ratio: 3.2 20 Station (feet) 30 40 Station Elevation 0.00 96.53 8.12 95.84 12.68 94.02 16.60 91.13 23.04 91.13 25.81 91.13 2950 94.61 34.97 95.11 42.18 96.23 Stream Type G/F Stream Type G/P Pancho - Main Tributary, XS - 4, (Station 06 +79) 97 96 95 94 5 0 93 92 �] 91 90 89 SUMMARY DATA - PRECOtiSTRLICTION Bankfull Elevation: 91.3 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: Area s mi): l .l Date: ] 2/4/2012 Field Crew. IC2 Design and Lewis SUMMARY DATA - PRECOtiSTRLICTION Bankfull Elevation: 91.3 Bankfull Cross - Sectional Area: 9.1 Bankfull Width: 10.8 Flood Prone Area Elevation: 92.5 Flood Prone Width: 13.0 Max Depth at Bankfull: 1.2 Mean Depth at Bankfull: 0.8 W / D Ratio: 12.8 Entrenchment Ratio: 12 Bank Height Ratio: 3.2 SUMMARY llA "I`A -POST CONSTRUCTION Bankfull Elevation: 92.0 Bankfull Cross - Sectional Area: 9.2 Bankfull Width: 11.4 Flood Prone Area Elevation: 92.9 Flood Prone Width: 14.0 Max Depth at Bankfull: 0.9 Mean Depth at Bankfull: 0.8 W / D Ratio: 14.1 Entrenchment Ratio: 12 Bank Height Ratio: 3.2 Banl:full - -- -Flood Prone Area t Preconstruction Post Construction 0 10 20 Station (feet) 30 40 Site Banktull Elevation: Pancho Banktull Cross - Sectional Area: 9.1 Banktull Width: Stream l .l Main Tributary 12/4/2012 Field Crew: K2 Design and Lewis XS ID 114eaa Depth at Banktull: XS - 5 Station 07 +87) W / D Ratio: 9.9 Entrenchment Ratio: Drainage Bank Height Ratio: 3.5 94 0 93 ___ Bank£ull � 92 - - - -_-_- -_- - -_-_- -___-___ ___- - -__________ �___- -_____ _-- _Flood Prone Area Station Elevation � +preconstntction 0.00 96.55 90 7.01 96.88 9.82 96.23 12.88 94.93 15.49 91.10 22.12 91.10 25.44 92.52 30.16 95.56 34.82 96.95 Stream Type G Stream Type G SUNI MARY DATA - PRECONS't12UC'I'ION Banktull Elevation: 91.9 Banktull Cross - Sectional Area: 9.1 Banktull Width: Area s mi): l .l Date: 12/4/2012 Field Crew: K2 Design and Lewis SUNI MARY DATA - PRECONS't12UC'I'ION Banktull Elevation: 91.9 Banktull Cross - Sectional Area: 9.1 Banktull Width: 9.5 Flood Prone Area Elevation: 93.1 Flood Prone Width: 12.0 Max Depth at Banktull: 1.2 114eaa Depth at Banktull: 1.0 W / D Ratio: 9.9 Entrenchment Ratio: 1.3 Bank Height Ratio: 3.5 SCDIJI:4RY ll:�T.4 - POST' CO \STRUC'I'ION Banktull Elevation: 92.2 Banktull Cross- Sectional Area: 9.2 Banldull Width: 9.9 Flood Prone Area Elevation: 93.3 Flood Prone Width: 13.0 Max Depth at Banktull: 1.1 Mean Depth at Banktull: 0.9 W / D Ratio: 10.7 Entrenchment Ratio: 1 .3 Bank Height Ratio: 3.5 Pancho -Main Tributary, ,l"S - 5, (Station 07 +87) 98 97 96 d 95 5 - - 94 0 93 ___ Bank£ull � 92 - - - -_-_- -_- - -_-_- -___-___ ___- - -__________ �___- -_____ _-- _Flood Prone Area � +preconstntction Post Construction 90 0 10 20 30 40 Station (feet)