1
Project Name
Burlington Park Apartments - Phase 1
2
Project Area (ac)
8.99
3
Coastal Wetland Area ac
4
Surface Water Area ac
-
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1005(4
7
!Width of vegetated setbacks provided (feet)-
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
Bioretention Cell
0
12
0
13
Wet Pond
1
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bay titer
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Organization:
Street address:
City. State, Zip:
Phone number s.:
1 Email:
Matt Lowder, PE
28
Triangle Site Design, PLLC
29
4004 Barrett Dr, Suite 101
30
Raleigh, NC 27609
31
919-553-6570
32
mlowder@trianglesitedesign.com
Certification Statement:
I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
,•` � t� C�trS�l ,'•`ri
r�~a Ci c c°ou' rasa, �I10
Via_,^��ti5�l0,��,
c
SE-L
{yr/
24434 ■ /�
.0 ,S • R Vf
amewj6
Signature bf Designer
51 ff /V
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Endre-Site
1
4
Type of SCM
Wet Pond
Wet Pond
5
Total drainage area (sq ft
391457
288103
6
Onsite drainage area (sq ft
391457
288103
7
Offsite drainage area (sq ft
-
-
8
Total BUA in project (sq ft
169291 sf
169291 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
-
10permitting)
New BUA not on subdivided lots (subject to
sf
-
11
Offsite BUA (sq ft)
-
12
Breakdown of new BUA not on subdivided lots:
- Parkin (sq ft
97178 sf
97178 sf
- Sidewalk (sq ft
16423 sf
16423 sf
- Roofs ft
55690 sf
55690 sf
- Roadway s ft
- Future (sq ft
-
-
-
- Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
-
16
Existing BUA that is already permitted s ft
17
x stino BUA that will be removed (sq ft
10050 sf
6098 sf
18
Percent BUA
43%
59%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
13910 cf
21
Calculation method for design volume
I
Simple Method
INFORMATION
Please use this space to provide any additional information about the
22
The proposed SCM has been oversized in anticipation for future phases. The
maximum overall drainage area will be 8.78 ac with a maximum BUA of 5.91
ac. The combined Phase 1 and future Phase 2 drainage area yielded a
design volume of 20,905 cf (a difference of 6995 cf).
WET POND
1
Draina earea number
1
2
Minimum required treatment volume cu ft
13910 cf
GENERAL
MOC FROM MR11 4050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump referred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC 8 ?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies lies with General MDC (12)?
Yes
16
Does the SCM follow the devicespecific MDC?
Yes
17
Was the SCM designed b an NC licensedprofessional?
Yes
WET POND
N= FROM 02M.1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl) _
Elevation of the main pool bottom (top of sediment removal) (fmsl)
374.00
21
375.00
22
Elevation of the bottom of the vegetated shelf fmsl
379.50
23
Elevation of the permanent pool fmsl
380.00
24
Elevation of the top of the vegetated shelf fmsl
380.50
25
Elevation of the temporary pool fmsl
381.40
26
Surface area of the main permanent pool (square feet
10140
27
Volume of the main permanent pool (cubic feet)
35815 cf
28
Average depth of the main pool (feet)
4.03 ft
29
Average depth euation used
Equation 3
30
If using equation 3, main pool perimeter feet
458.0 ft
31
If using equation 3, width of submerged veg. shelf feet
3.0 ft
32
Volume of the foreba (cubic feet)
6484 cf
33
Is this 15-20% of the volume in the mainpool?
Yes
34
Clean -out depth for foreba inches
36 in
35
Desi n volume of SCM (cu ft)
13910 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter inches
2.25 in
38
If weir, weir height inches
39
If weir, weir length (inches)
40
Drawdown time for the temporapool (days)
2.18
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow ath?
Yes
43
Depth of forebay at entrance inches
48 in
44
Depth of forebay at exit (inches)
42 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 It
47
Slope of vegetated shelf H:
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1
r 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Hybrid Bermuda
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
55 the wet pond(s):
Wet Pond 2 11:18 AM 5/11/2021