May 13, 2021
LETTER OF APPROVAL WITH MODIFICATIONS AND
PERFORMANCE RESERVATIONS
MCB - Camp Lejeune
ATTN: Talia Prendergast, Public Works Division
1005 Michael Road
Camp Lejeune, NC 28547
RE: Project Name: MLG Operations Center (P1801) -EXPRESS
Acres Approved: 4.0
Project ID: ONSLO-2021-077
County: Onslow
City: Camp Lejeune
Address: Gonzales Blvd.
River Basin: White Oak
Steam Classification: Other
Submitted By: Brian O'Mara, PE, Stantec
Date Received by LQS: May 11, 2021
Plan Type: Military
Dear Ms. Prendergast:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications and Performance Reservations. A list of the modifications and
reservations is attached. This plan approval shall expire three (3) years following the date of approval, if
no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the
plan not perform adequately, a revised plan will be required (G.S. I I 3A-54. 1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive
the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity.
The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to
Annette Lucas at Annette. lucas2ncdenr.gov or Paul Clark at Paul. clark2ncdenr.gov. If the
owner/operator of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
D � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
NORTH (`„gRpLihW
owwrm 1U10 W,Wqu.i� 910.795.7215
Letter of Approval with Modifications and Performance Reservations
MCB - Camp Lejeune
May 13, 2021
Page 2 of 4
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office
may require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
Rhonda Hall
Assistant Regional Engineer
Land Quality Section
Enclosures: Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Brian O'Mara, PE, Stantec
6110 Frost Place, Laurel, MD 20707-2927
Wilmington Regional Office file
Letter of Approval with Modifications and Performance Reservations
MCB — Camp Lejeune
May 13, 2021
Page 3 of 4
MODIFICATIONS AND PERFORMANCE RESERVATIONS
Project Name: MLG Operations Center (P1801)
Project ID: ONSLO-2021-077
County: Onslow
1. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity
has been undertaken, as is required by Title 15A NCAC 4B .0129.
2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation
control measures prove insufficient, the developer must take those additional steps necessary to stop
sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected
after each storm event (NCGS 113A-54.1(e)). Maintenance and/or clean out is necessary anytime the
device is at 50% capacity. All sediment storage measures will remain on site and functional until all
grading and final landscaping of the project is complete (15A NCAC 04B .0113).
3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed
development unless otherwise noted. The removal of vegetation within any existing ditch or channel is
prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less
steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed, but stripping of vegetation is considered
new earth work and is subject to the same erosion control requirements as new ditches (NCGS 113A-
52(6)).
4. The developer is responsible for obtaining any and all permits and approvals necessary for the development
of this project prior to the commencement of this land disturbing activity. This could include our agency's
Stormwater regulations and the Division of Water Resources' enforcement requirements within Section
401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean
Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of
Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that
may be required. This approval cannot supersede any other permit or approval; however, in the case of a
Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All
highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act.
5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer
is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps
of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures
that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to
installation. The Land Quality Section must be notified of a relocation of the measures in question to the
transition point between the wetlands and the uplands to assure that the migration of sediment will not
occur. If that relocation presents a problem or contradicts any requirements of either DWR, the Corps, or
the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that
an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to
do so will be considered a violation of this approval (NCGS I I 3A-54. I (b)).
Letter of Approval with Modifications and Performance Reservations
MCB — Camp Lejeune
May 13, 2021
Page 4 of 4
6. Any borrow material brought onto this site must be from a legally operated mine or other approved source.
Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction
sites without additional permits under NCGS 74-49(7)(d). Disposal at any other location would have to be
included as a permit revision for this approval.
7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 4_0 acres.
Exceeding that acreage will be a violation of this permit and would require a revised plan and additional
application fee. Any addition in impervious surface, over that already noted on the approved plan, would also
require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention
measures (NCGS 113A-54.1(b)).
8. This phase of the project is approved for clearing and grading and test piling work only in preparation of future
development on the site. Any addition in impervious surface, over that already noted on the approved plan,
would require a revised plan to verify the appropriateness of the erosion control measures and stormwater
retention measures.
9. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight
(8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more posts for support,
i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart (E&SC Planning & Design
Manual 6.63, Rev. 6/06).
10. Because the sediment traps and basins are shown on the plan as the primary sedimentation and erosion control
devices on this project, it is necessary that the traps and basins and their collection systems be installed before
any other grading takes place on site, and that every structure that receives more than one acre of drainage is
built so that each dewaters only from the surface (NCGO10000). If that proves to be impractical, a revised plan
must be submitted and approved that addresses erosion and sediment control needs during the interim period
until the traps and basins are fully functioning (113A-54.I(b)).
11. A graveled construction entrance must be located at each point of access and egress available to construction
vehicles during the grading and construction phases of this project. Access and egress from the project site at
a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the
entrances is critical (113A-54.1(b)).
12. As a condition of the NPDES General Stormwater Permit (NCGO10000), the financially responsible party shall
comply with the NCGO1 Ground Stabilization And Materials Handling requirements that became effective
April 1, 2019. The NCGO1 Ground Stabilization And Materials Handling standard detail can be printed from
the deq.nc.gov/NCGO1 website.
13. As a condition of the NPDES General Stormwater Permit (NCGO10000), the financially responsible party shall
comply with the NCGO1 Self -Inspection, Recordkeeping and Reporting requirements that became effective
April 1, 2019. The NCGO1 Self -Inspection, Recordkeeping and Reporting standard detail can be printed from
the deq.nc.gov/NCGO1 website.
14. As a part of routine monitoring of the approved land -disturbing activity, the financially responsible party shall
assure inspections of the area covered by the approved plan after each phase of the plan has been completed
and after establishment of temporary ground cover in accordance with North Carolina General Statute
113A-54.1(e).
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities