Loading...
HomeMy WebLinkAboutGW1-2021-02155_Well Construction - GW1_20210505 WELL CONSTRUCTION RECORD (GW-1) For internal Use Only: 1.Well Contractor Inform m f}V 14.WATER ZONES FROM TO DESCRIPTIO' Well Contractor Name A tt. ft. 5 " ft. ft. I---NC Well Contractor Certification Number 15.OUTER CASING for multi-eased wells OR LINER if a Gcable FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. O C/ Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) VV 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC.County,State. Variance,etc.) ft• ft. in. 3.Well Use(check well use): ft. ft. in. 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL Agricultural Dunicipal/Public ft. ft. we in. "ft/ Geothermal(Heating/Cooling Supply) Residential Water Supply(single) f[. ft. in, Industrial/Commercial DResidential Water Supply(shared) 18.GROUT Irrigation FROM TO MATERIAL EMPLACEME'T METHOD&AMOUNT Non-Water Supply Well: Monitoring X, ORccovery Injection Well: Aquifer Recharge roundwater Remediation 19.SAND/GRAVEL PACK if applicable) Aquifer Storage and Recove Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test DStonnwater Drainage tt. tt. �✓ Experimental Technology Subsidence Control Geothermal(Closed Loop) cer 20.DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION(color,hardness,soillroek rain sire.etc.) Geothermal(Heatin oling Retnurn)Q� Other a in under#21 Remarks) ' ft. ft. A 4.Date Well(s)Completed: 3 `v I?, Well iD# It ft. 1 ft aiow un 5a.Well Location: ft. 2q ft. � ---tr�'-w�(�• ft. L tacility(OwncrNane Facility f. a ev) �a 11 NI A W . ft. ft. Ph y icaI Address City,ani Zip 21.REMARKS 2021 County Parcel Identification No.(PiN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: `t• '^ ^j'Oil 6.Is(are)the well(S) Permanent or Temporary Signature ofCertifi d N ell Contractor Datc Av signing this form,i herehr certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: Dyes or §No with 15.4 NC4C 01C.0100 or 15.4 NC.4C 01C.0100"'ell Construction Standards and that a Ifthis is a repair,,ill out knoxn well construction information atul explain the nature of the copy of this record has been provided to the well owner. repair under#11 remarks section or on the back gjthis dorm. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-I is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: M n SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: U �v (ft•) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdij)erent(example-3(,100'and 1(tr)/00') construction to the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, If rater level is above casing,use..+-D 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: x^ (in.) 24b.For Infection Wells: In addition to sending the form to the address in 24a above, also submit one copy of this form within 30 days of completion of well 12.Well construction method: vrkaa construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, OR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 115 Method of test: 24c.For Water Supply& Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: Amount:��� completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016