Loading...
HomeMy WebLinkAboutWQ0039666_Regional Office Historical File Pre 2018Water Resources ENVIRONMENTAL QUAL iTY June 4, 2018 Rick Howell, City Manager City of Shelby 824 West Grover Street Shelby,. NC 28150 SUBJECT: Final Engineering Certification Acknowledgement Kennedy Gravity Sewer Extension Permit No. WQ0039666 Permitee: City of Shelby County: Clevekand Dear vell: ROY COOPER Governor MICHAEL S. REGAN Secretary, LINDA CULPEPPER Interim Director The Division of Water Resource's Mooresville Regional Office received the Final engineering certification with record drawings for the subject sewer extension project on 6/4;2018, Enclosed is a certification page for your records, A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certificationindicates compliance with all. regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance.„ Please he reminded that the Pennittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form 'PNOCF since the permit is not automatically transferable, Form PNOCF can be downloaded from http;/!_portal.nedenr. r veb/wq/swolpsics/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori,tuviancdenr.gov. Sincerely, mola.Gzir Ori Tuvia, Environmental Engineer Mooresville Regional Office Division of Water Resources, DI Q cc: David Odom, PE (E-Copy) Central Files, MRO (Laserfiche) State of North Caroliw Eruarournerual Quality I 'Aiaer Resources Cernef Au e Anne 301. kleveneMe. NC 2811:5 fehenee $134-563.1649 :eiernee WAVAIdelf .90V AST TRACK SEWER ENGINEERING C PERMITTEE: CITY OF SHELBY PERMIT If: WQ0039666 PROJECT: KENNEDY GRAVITY SEWER EXTENSION ISSUE DATE: DECEMBER 6, 2017 FICATION This project shall not be considered complete nor allowed to operate in accordance with standard. Condition 7 of this permit until the Division has received this Ceriificatia n and all required .supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater Flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. AFinal Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Pernrittee,hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable designlctrnstruction information to the Permittee, and the Pcrmittee is prepared to operate & maintain the wastewattelr collection system permitted herein gofiVel Printed Name, State of North Carolina, ng been auth xed toy observe perioadicaily, weekly, full flora) the construction of the project naine and location as referenced above for the above Perntittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000, as applicable; and other supporting materials, North Carolina Professional Engineer's Seal wlsignature & date: Final © Partial (inciuu#e description) Certification Comments/Qualifiers (attach if necessary): NC DWR - Water Quality Re to Ntooresville Regional Office ion 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699 FAX; (700633.6040 Water Resources ENVIRONMENTAL QUALITY December 6, 2017 Rick Howell, City Manager City of Shelby 824 West Grover Street Shelby, NC 28150 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Permit No. WQ0039666 City of Shelby Kennedy Gravity Sewer Extension Wastewater Collection System. Extension Permit Cleveland County Dear Mr. Howell: In accordance with your application received December 4, 2017, we are forwarding herewith Permit No. WQ0039666 dated December 6, 2017, to the City of Shelby (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this pemiit: Condition 11.1: This permit shall not be auto ally transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Pennittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. State of North Carolina I Environmental Quality I Water Resources Water Quality Regional Operations Mooresville Regional Office I 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 �f any parts, requirements, or limitatio contained in this permit are u ceptable, you have the ri request an adjudicatory hearing upon written request within 30 days following receipt of this This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this pennit shall be final and binding. If you need additional information enncerr or via e-mail at oriauvia nedenr.ov" Sincerely, gto sa pie e can t Ori Tuvia at (704) 23 2190 by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: David Odom PE -. py) Mooresville Regional Office Files Water Resources Central Files PERCS (E-copy) Page 2 of Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Shelby Cleveland County for the construction and operation of approximately 260 linear feet of 8-inch public gravity sewer, to serve 5 homes as part of the Kennedy development project, and the discharge of 1,800 gallons per day of collected wastewater into the City of Shelby existing sewerage system, pursuant to the application received December 4, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. _41.by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0039666 Permit Issued: December 6, 2017 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET City of Shelby is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the City of Shelby First Broad River Wastewater Treatment Plant in accordance with Permit Number NC002453 8. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 1,800 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304 (b)]. 11. STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-21 5.1(d3)] This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 021-.01 10] This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1 For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3 Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easenient width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6, Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted wi the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: . One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis.. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.01 t15(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted. June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T ,0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [GSS. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER, ENGINEERING CERTIFICATION PERMITTEE: CITY OF SHELBY PERMIT #: WQ0039666 PROJECT: KENNEDY GRAVITY SEWER EXTENSION ISSUE DATE: DECEMBER 6, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction infoiniation to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION , as a duly registered Professional Erjgineer in the State of North Carolina, having been authorized to observe (El periodically, El weekly, Di fun time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal \No/signature & date: [1] Final [11 Partial (include description) Certification Co F ments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 II on of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: �4 )((, (to be completed by DWR) All items must be completed or the application will be returned APPLICANT INFORMATION: 1, Applicant's name: CITY OF SHELBY (company, municipality, HOA, utility, etc.) 2. Applicant type: D Individual © Corporation ❑ General Partnership 0 Privately -Owned Public Utili El Federal El State/County 1.i Municipal Cl Other 3. Signature authority's name: RICK DWELL per Title: CITY MANAGER 4. Applicant's mailing address: 820 W. GROVER ST City: SHELBY State: NC Zip: 28151- 5. Applicant's contact information: Phone number: (704) 484-6840 Email Address: david.hux@cityofshelby,com 11. PROJECT INFORMATION: 1. Project name: NNEI) G VITY E E TENSION 2. Application/Project status: posed (New Permit) Existing PermiUProject Ha modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: CLEVELAND 4, Approximate Coordinates (Decimal Degrees): Latitude: 35.264167° Longitude:-81.562778° 5. Parcel ID (if applicable): N/A (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION:. 1, Professional Engineer: DAVID W. ODOM Firm: ODOMENGINEERING, PLL Mailing address: 169 OAK S.T City: FOREST CITY State: NC Zip: 28043-____y Phone number: (828) 247-4495 Email Address: davidodom(codomengineerinttdcom License Number: NC 21.130 IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: CITY OF SHELBY Permit Number: NC0024538 Owner Name: CITY OF SHELBY V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):. Permit Number(s): WQ Owner Nam Downstream (Receiving) Sewer1lSize: 8 inch WQCS FORM: FTA 04-16 Page 1 of 5 GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public U'tility,, has a Certificate of Public Yes ONojN/A 2. If the Applicant is a Developer of lots to be sold, has a 0 Yes D No N/A If the Applicant is a 4. Origin of wastewater: (check all that apply): F�1 Residential Owned Residential Leased © School / preschool / day care 0 Food and drink facilities 0 Businesses / offices / factories N/A 0 Retail (stores, centers, malls) 0 Retail with food preparation/service 0 Medical / dental / veterinary facilities 0 Church Nursing home venience and Necessity been attached? been attached? been attached? [.] Car Wash 0 Hotel and/or Motels. 0 Swimming Pool /Clubhouse 0 Swimming PooVFilter Backwash ❑ Other (Explain in Attachment) Nature of wastewater : 100 %© Domestic/Commercial % Commercial % Industrial ) 1.----9.1s there a Pretreatment Program in effect? 0 Yes 6. Has a flow reduction been approved under 9 If yes. provide a copy of flow reduction appr 7. Summarize wastewater generated by project: Establishment Type (see E' RESIDENTIAL HOMES ? Yes 0 No 0 No Daily Design Flow "'e 360 gal/DAY gal/ gal/ gal/ gab gal/ No. of Units Total Flow 1800 GPD GPD GPD GPD GPD GPD 1800 GPD See for caveats to wastewater design flow rates (i,e minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located nearh'igh public use areas; and residential property located south or east ofthe Atlantic Intracoastal Waterway to be used as vacation rentals as defined in ). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other treasured data. Wastewater generated by project: 1800 GPD (per ) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: o, Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement taf"existing sewer with no new flow expected 0 Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & M DC (Gravity Sewers): I . Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material elAPAR.IMAIMOXIM 8 260 > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable)— 02T .0305 & MDC (Pump Stations/Force COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5, Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with IANCAC arr .o3o5010): El Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(hX1)(B)i > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than l5,000 gallons per day: El Portable power source with manual activation, quick -connection receptacle and telemetry - I 5A NCAC 02T .0305(h)(1 XC) or D Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1 XC): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations° storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 SETBACK'S SEPARATIONS (On ,0200 t SA NCAC ,33050Th 1, Does ihel,:Troject cxprt ply wit.11 sepalltions f6und i u Yes ID No I 5A NCAC'011,030an contains minimum separations that shall be proyi,ded, for er system Setback Parameter* Separation Required 24 inches Storm sewers and other utilities not listed below (yertical) Water mains (vertical -water over sewer including in benched trenches) er mains (horizontal) d water lines (vertical - reclaimed over sewer) Reclaimed water lines (horizontal - reclaimed over sewer) *Any private or public water supply source, including any wells, WS-I waters of Class 1 o Classll impounded reservoirs used as a source of drinking water 100 feet 50 feet 18 inches 10 feet 18 inches 2 feet Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from nonnal high water (or tide elevation) and wetlands (see item IX.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage di he Any building foundation Any basement Top lops of embankment or uts of 2 feet or more vertical height systems and interce tor drains ontains alternatives where separations in D "Stream classifications can be identified using the Division's D. If noncompliance with see Section X of this application 10 feet 10 feet 10 feet 6 inches cannot be achieved, 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) El Yes J No N/A D. See the Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per D This would include Trout Buffered Streams per 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? D Information can be obtained from the El Yes D No N/A Ej Yes No 5. Does project comply with (additional permits/certifications)? Yes Ej No Per , directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per , "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. D Yes 0 No N/A > If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the perrnitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 CERTIFICATIONS: 1. Does the submitted system comply with and the , the as a p bie Yes DNO If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal (1 ithe Fast Track ALkpli o d c ts. 2. Professional Engineer's Certification: DAVID W. ODOM attest that this application for (Professional Engineer's name from Application Item IRA.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, sign ture, and date: 'I 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, RICK HOWELL, CITY MANAGER attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments axe not included, this application packLe is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes and , any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exec $10,000 as oI1 as civil penalties up to $25,000 per violation. Signature: FORM: ETA 04-16 Page 5 of 5 Divi'sion of '4N, ate t" Re-sott State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation; City of Shelby Project Name for which flow is being requested: James Love School Rd - Kennedy More than one FTSE may be required fOr a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater,flow. 1. Complete this section only if you are the owner of the wastewater treatment plant, a. WWTP Facility Name: First Broad WWTP b. WWTP Facility Permit #: NC0024538 Allflows are in MGJi c. WWTP facility's permitted flow 6.000 d. Estimated obligated flow not yet tributary to the WWTP 0.590 e. WWTP facility's actual avg, flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 3.09 0.0018 3.682 61.36% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) ((2) (D)=(B+C) (E)----(A-D) Design Obligated, Pwnp Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firru I pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MOD MOD MOD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximumpumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 0416 Certification Statiment I Rick I I avr ll certify to the hest of my knowledge e that the addition of the volume oaf v e\v ter to betapermitted in this project has been evaluated along the route to the receiving wastewater tr ent facility and that the flay from this project is not anticipated to cause my capacity related y sewer overflows or overburden any downstream pump station en vacate to the receiving treatment plain under normal irc ce , ,liven the implementation of the planned improvements identified in the pl = 'fig assessment where applicable. Tins analysis has been performed in accordance w`th local established policies and procedures using the best available data. This certification applies to those items listed Mauve in Sections I and II plus all attached planning assessment addendums for which I the responsible party. Signa of this form iodic' accepttan .e of this e ster flora, Page 2 of UNITED t,TATCS ,AR'TMENT OF ME ,NE"E'REOR GEi3C.GCN AL SURVEY ai I E NORTIhM CAROLINA nAfi1,1,NENT ar NATUWAY, RESo4lkkcAs scan CONMUNrrt onVELOPt,O T £Ski€LBY C?tlMBRANaLE NeRTM COMA.,,,C.A6NRAND 4A7 KENNEDY SEWER November Q„ 2017 des Bell Mooresville Regional Office Water Quality Section 610 E i Center Avenue Mooresville, NC 28115 Subject Fast Track Sewer System Extension Application Cleveland County — Kennedy Gravity Sewer Extension Dear Mr. Bell We are submitting a Fast Track Sewer System Extension Application for the Kennedy Gravity Sewer Extension project located in Cleveland County. This submittal will include one original and one copy of the following items: Fast Track Sewer Application Check for application fee Flow Tracin/.cceptance'Forrr USGS Topographic Map Aerial Map if you have any questions or need additionaorrra tion, please con Sincerely, David Odom, P E.. ct rrae 828-47-5 or Nov tuber ail, 2017 Wes Bell Mooresville Regional Office Water Quality Section 610 E. Center Avenue Mooresville, NC 28115 Subject: Fast Track Sewer System Extension Application Dear Mr, Be Oak trE t F rifst r its: rid, 2 0, f 828,' .Jt fax Cleveland County — Kennedy Gravity Sewer Extension We are submitting a Fast Track Sewer System Extension Application for the Kennedy Gravity Sewer Extension project located in Cleveland County. This submittal will include one original and one copy of the following items: • Fast Track Sewer Application Check for application fee ■ Flow Tracking/Acceptance Form USGS Topographic Map • AerialMap if you have any questions or need additional inforrnatioru, please contact me a 28-247-4495 or Sincer David Odor, P.E Cen Files. APS t Nu Permit Type r Extension, Puna 003 Primary Reuaewer ori.tuvia Coastal S Permitted Flow 1.; Fad rty Kennedy ra a Location Address Owner Ion Pressur n Extensions Permit Tracking Shp Status Versio n A Permit Ce a SWP 1275/2 17 Prot t Type New Project Permit Ci:assifacatdn Individual Affiliation Facility Contact Affiliation ty Cleveland Owner Name City of Shelby Oaf Events Type prat - Muniolpel r Afflliat Rick Howell Ci Manager PO Box 207 Shelby 281:a1020, rlg issue Apo Received 12161 171 /4/2017 Regulated Activ`rtaes Apartment complex Subdivision Wastewater coilecii 0utfall 4n hedull Mated issuance Public Notice 12/6/2017 Requested received Events Additional information ruet Additional information received Effective 121612017 Expiration terbody Name She ndex Number Current Class Subastn