Loading...
HomeMy WebLinkAboutNCC212868_Site Plan or Location Map_20210511Z>A,,04 SHEET INDEX ]�- 111� y . 4 0 — EC;-1 Phase I Erosion Control Plan zCj-0 M m Mao w 00 EC-2 Phase II Erosion Control Plan q ago �o QQ0 5 , EC-3 Erosion Control Specifications — V. m Boa ���zw^ ow EC;-4 Erosion Control Details — _ aa W awa ^ �� a N C G 0 1 — 1 NCGO1 Specifications Z m o � � o 0 NCGO1-2 NCGO1 Specifications ST.P-1 Storm Drain Profiles 577.E zwm NU� _ DR-1 Predevelopment Drainage Plan DR-2 Post Development Ditch Drainage Plan DR-2 Post Development Pipe Drainage Plan•- R 1 Overall Roadway Plan / I I I I ,L ' R--2 Ryleigh Dan PI. Plan/Profile Sta: 0+00 to 11 +50 � __ � oti FLOOD p I I _ ;:..� _ . R--3 Addison Emory Ln. Plan/Profile Sta: 0+00 to 9+00 yti �i� FLI I I I I O •• i* ' ; 1, J" I ►SIN R--4 Wilhharr Ct. Plan/Profile Sta: 0+00 to 8+50 I I I I I IIP I I I II Gua.PHlc SCALE 1� I I I I I I I I � p NA�L46S4,ss, . 6 � / I I I I I ICINITY MAP o So too 200 AoELaEJ p rI''0 NO SCALE ® e t632 sDWD '6 S / ��!� l inch 100 feet Know what's below. / I �j � I I I qp I Call before you dig. / I 13i� I APPROX. SIRE / / I AM EWE E E MENT a I �d 31� aid 3 / NO3�0/0 400 o o ^o 54g4 � �� N� I. '••JJJ / S/Gz 04 B _— I 1 a 0 --- I I I I / � ,•� O 8 Addison Emory Ln. I _ y a 0 I I I + L 50SPBkh 'csftht of Way MAILBOX KIOSK PREPARED FOR: 80Mfi4LLC ' — — — — _ OWNER/DEVELOPER: Q?" Pis' N ' APPROX, GAS R/W — 2.26 AC. W OAKSPRINGS, LLC �0 I � / / I _ CO / — I / PO BOX 5350 * I I PIN 4654-68-8991 z I /-,ANDY T. WALDEN ETA D.B. 12E Pg. 643 MOORESVILLE, NC 2811'7 \ _ � / I I \ \ 77.37 ACRES 2 _ _ r 3 / / / —� � I I (919) 38 e'7 —45'00 \ 23 PREPARED by: 71 \ � � / � � 2 / / / I I I I °g• 22 ENGINEER: \ — 3 I , — / / / / \ I / ►►III„ PIEDMONT DESIGN ASSOCIATES, P.A. — J / / \ / / \ I I I / ENGINEERING/SURVEYING/PLANNING � — \ _ N7 0 I I --< _ / —\ — w °°" \ I I � SUITE 101 WESTFIELD CENTER w � � rn NW � L Waz E. omZv qE:o014 — II —I O3o8 N— I I I IL I I I %tiqa;o. M: 125 EAST PLAZA DRIVE --------------------- 00 Nt,m MOORESVILLE, NORTH CAROLINA 28115 Z \m� �a,9139 �E (704) 664—'7888 — 3 / o 54- OR g1D ^ w ^ / / LL PAN A6 Sx 632 _ rr rn o L1 / / �" / P9 I d s,e / 2 O 29 1138) L°Go8.2665 NCBELS No.: C-100'7 N78. 26' 15"W I ` I o^ N1 \ 30'x 20'SGN EASE oa rn w Sbte way—, 15 n y 60Rihtof N76• 0, do 112-5-B1 SURVEYORS: 08-W I / / T. p8, 21� a,SS ZZS 60. \ m 0 x /5S\de5/ 51GJ �Av Z�p9• S0�6a0P9686��� PIEDMONT DESIGN ASSOCIATES P.A. � � 3op2 v� ENGINEERING/SURVEY ING/PLANNING N73° 51' ..W N ��, sr\ \ / / � � 5�,�8' 1,EE O 4654 017 STIR 61.49' --LN73' 21' 00"W 29, W \ I N72' 51' 47"W / / / T0�\oe6�2�0/ 5ga 11676 5 -4p62 �33., ' SUITE 101 WESTFIELI) CENTER 9. 126, -PWALT 100.74' 9.72' °r 125 EAST PLAZA DRIVE Road — Q93� �o � 6p-R1htofWa (SR' ll3) 219-R-j5g11 65�,���$� MOORESVILLE, NORTH CAROLINA 28115 2p2 is 3 P 9 PAN 6,9Eg 1°e 1n A %? A r`1 Q Q Q JAMp�4 65_5,_,, n65A,- ri SRC NCBELS No.: C-1007 PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES P.A. Owner: Approved: Date of Issue: Location: a I 4 .k * 4 / E� / _____ __—L __� — — I1 \ � _1\ - I" 11 -_ — ___J — — / 0 1-t \ /-,� --� � \ \ — ­1 — — — — — \ _", — _,� / , \/ — — ___ / ) \ 1-1 �11 ____/ �_ . ��\\\�\, / \\ \��1-\EAA_C�Nasss_s� _�� / ��a �� \\ x� \ \\ �4 -�� \ I / 1� /\ \ \ /�—/ - J \ \ \ \ \ \ B.e. 26 _1GfELq / �i �— 1 v — \ . � J ( / / — \-11 \ — i / / — — — — \ I \\ \ \1 \\\ \\ �, rr �" I f�7; \ \ \ �� \ \ j _J/ / \\ \ / / / � r _\ '\ L \\ \ \ \ \ \\—\ \\ /—- __ \� \ \ `,,, \ \—_g�d , U) �:) ,— —/ I—\ \ /— i/ \ It— _�, ,_ / / / / I� �\ < 1 \\ \ ^ ` \ \ \ I I �- Z \ \ v \ / / -- \ \ \ z� aH `*Wo — _44ti / w _ -r , 5 \ \ y c� `� J \ \\\\\ \�-�\_ - \--�' /�- \ / /A /_ "I, `\ 1 �\\ --,-__,�aa \J / �a��/i'/ \ \\ % I - -l/ \ �\ / F ///�) / \) \\\ \ / � \ \ <\\\ \\ \\ \\ —7�°� ��\ \ I I \ \ I \J` �Wo \ — am \� —y w`�/ 1�4,-0� I \ \ \ I / I // ) / / / \ \\ \ ��\ �\ \ �\ — \\ `�� `-W ^ --- \ \�_/ 1 /_ — \\\-72'�2` � \ r '�C-w ,F, � NU ~// _—^___� // /� ,_ ` /\/ /_^I p�� - \\ YEAf� FLOODLINE N� \ \ / \ \ -� z m .p,� - 1° / - I i \ \\ \\ \ \ — -gyp \ \ — _ 72° A� \ _ �� - Ei— 1 — ��a cr f�O N / — / J I I \ \ \ r y ' — \\ \\ �\\\\ \ \ Jai( ` \ \ \ — / \ \ \ \ \ — ~ \ _' — /L— S � 11/ \ h J \ �� / o0 11 / 1 Nr/� \ l \ \ i * t i \ \ \ \ \ \ \ �� .\ - \ \ \ \ — ` — — — — /' — '\ J l \ — I4Q_ _... �r� = i _ v N p — r, _, \ 1 - \ - - - , -0 � - \ - _ate -44 - , � ) -i v �x.�y i i I i 4 \ \ \\ \\ \ \ \ \ \ ," J \ \ \ \ — `� — — '/\ _ — — — 5.73' \ — — ./ - f\ n� / — co \ \ _ _� / / 5 \ \� \\ \\\\ � \ '\— J —� / \ \ i� / aio /J / \ \ E — \ \ \\ \ \ \ J \ 101 ( \ \L,,'_ / avid Cq \ \ --- — --\ -11 — ----_ 'A _J / -\ \ \ \ \\\\\\ \\\\ \� 1 \ \ \ �� o s `�— \-�-� \--_-� \ / / — — \ / 1130 �\ \ \ \ \ /(/ I / \ \ INITY \\MA\\�/// / - \�\� \\\\ \III \\\\\\ \ \ \ ,�� ��� \ �, �_r, \____� /' / f J -\--\ - \ / I-,- \ \ \ \ \ \ \ \\ \\ \\ \\ \ \ \ r , -�_ 1 -\ _ / 11313 / \ \ - ,I / lI II \ -� \ - - _ __�ij j/ —_ ���\\\\\\\ ��\\\\\\\\\1 \\ �!\\ /d �� \^�� / / -__`-\ \ // ///// \ � - l _­01 - .\\ -_--� -/--�` \ . \\\ \ \\\\ \\\\\\ \ \ \ \ `\\ \\ \ \ \\ \\\ \ \ \, - � / GENERAL NOTES: � \\ \\�\ \\.\ � \ l �\ ;� \ 4) �w /// 1. Current boundary based on information from ��\\\ \\�\�� �2j o \\ o o �� ti� `\ _ 100 YEAR FLOODLINE �� �,§I" ',/ Iredell County GIS. Boundary wil I be verified by I \\ \ \ \ \ \ \ \ \ � � 6 ,, \ _ J - - - ; ` - _ \ _ _��.. ,ry field survey. l \ \ \ I 1 I I \ 11 I I II\I\ \\�,\ � > -�` � _� \ q. 2. Contractor o maintain all weather drive access for j 1 I I i I l �I I J l I 1111 I I j I f ( I- \r J- -- � � — ' _ - - - \_ \\ _\ �w / / n CN' / // I I /) 1 \ / f existing house of Pamela Edwards. J / // / / f / /// (I l \ �/ _ // , \ /� / /� _ _ _ ``�\ j/�= - - -` \ \ \ \ \\ f g / // / OO C� , // / / ti� r ( / / _ _ \� J \ \\ \\ \ \ \\�� II I I l Contractor to verify use of timber bridges for ' /// ' c / ///, // /' > 1 I f f Jul / / , - ,,�, ,\ -/ %/ = �� \� ��\\\ - - _ I / //i -/ /ol I / // l / / / / \\� //� _ -\ \ \\ ", \\ --\ L_ �� _ I I crossing of existing gas lines during construction. // /// /,!/ / / / J I / < / / //�_ I I / / , _ \ \ ✓ // _ \\\ \\ \ \ \\ SEWER — - < I J /�/// / �� / // l ) ( \ \�_ / / / \1 / / �// / -\\ \�// , --� \\� \\\�-`� \, \\\\\\ \ ` VVER LI�� 3/ -�-_�_ `s9o- /---f / 4. Proposed driveway locations to be submitted with , /// / / / \\ � _ _ _ - 1 / / \\ - / \ \ \ \ \ \ \ \ \ 1� — — ( _\ / -74a \ \ \ \ \ \ \ I- \ EgSE d / future erosion control of individual lots. (/ (/ / / \ —_� J / �/ / � - � - / � � - � \ \ \ � \ \ I I 31d f /� / J / �/ - \ \ \ \ a° \ I J \ -- ,II / / / ) /)) \ / l / / -�� g'� ( / /) I \ / - �- \ / / T P�(P.,R6CK VINIER O1�TLET - - \ \ l \ \� �\ \ \ ��\\ \ \ 11((l \1 _ - \ \ 31d _700 —�� � -= 11 / / /( / ( ) / // / /�/ / / / / / / / // ,' �5c75o 0�,_ / (( L \) // _ \T bL OW POIi�TS IN SEDIMENT i \ \ ^\ \ - - - - / I / / � / / �� ___ \\1 \ Irl \ ) I Nc�G P s f \\ lj\\\ �� II/- \ \� \ 3 _ - --__41 � I I I / / ( / / Dti % 1 1 (�Y )• FEDEiA�LON� -� \o\ \ _ J �/ I) I \ I 1 / // I / J I I I I �/l / / - �_-_-/ L\(I/ //� / �PC4NSHEEZEC-4. _ \ \ \ \� ��\\\\\\\\\ \\�//-_ \\�\\\\ \-\ - � - — �� ?� — ----�ii/� �Wi / / I I \ \ / - /6 I J �/ -� - \ \ / \ , \ \ //20 \\ \\ \ - _ - _ � —�� / �) 1 J \�o`� 4c 9, / / r 101 \\\ / I// I I I /� J /� -r � \ \\ \\ \\ \\\\\ - \\,\"-\\\ \\� -\ \\ ___-__ /- // _ �/ _ - / /, l b aaN t}4`s j /l / I I I rn \ I ( �_`—/ / f / // \ L \\ \ �/ \ \ I \� �j//�— J/ --o�Z / J /� al 12S�NS4g4 / I I I 1 J I I \ \ \\\ \\l / -- /// 1 I r /I / / / /' S ��5° —� \ \ \ \\ \\\ //�—_\ \\\ \\—�\\ �� \ J� r _____� �—� \\ —\/ /i��l--�_- /�_\` __—� �//// \ - \ - ------ �i�Xk// \ \ / J- \ \\\ / — \ v/ �I // _ __� _ / \ \ \\ \� // r 1 /� / / \ \ \ \ -� \ \\ (\ - °- \\\ \\ \ \\�- � / \\ \\ /-- --,�� / �/ / ` \ l 80\ \ \ 1 \ \ I ( / 1%--/ / / / j \ - \ \ \\ \ \ \\ � \,-� I I V - \ \ \ \ \/ /� / -/ \ \ \ \ \ \ I I I \ 1 \ \\\\ �/ Ire / l / // / /r I� � \ 1 \ \\ \\ \ / \ \_ _ \\ \ / \ \ \ \/ / - / / / -- -- -- /� /� \\ \\ \ \ I I I I 1 \\ \\((/ � � /-� " 1 I / / \ \ \ �- �\\ I l J ` \ \„- _\ �, \ \\�\\ \ \\� JJ �/ I 1 to ( -� \ \\ \\\ // �\II/ / / / _ / / \ \ \ \ \ \ \ I / I / I I I1 1 \`1 // / I 1 ( \ , / / \ - \\ \ �` \ \ \ 1 I / \ \ / / / '7� �, _/, _ — J-- , \\ 1 J/ �// / / / / \ \ \ )\\ - \ 1 I 1 \ \ \ / I� - /�� \ \ \ I I / I / 1 \\\\ \ / ,_ / I / / / - \ \ \ -\ \ \\ / / // — � \\/� \\ \\ \ I o I 1 / / I I I \\\� � � I lli / / \ �\\ l \� \���/� \ \��� _\ \ \\\ � / / \ \\� I I �Q C\\F� a _�` / / / d - / ----' %/ / I \ \ \ 1 I I / / I \ \ \ \\ \ j / _- // I / \, \ r \ � 1 \ I \ / \ 3EE 9 A�L� _ \ \ \ 710 / J \ �F `" - _ - - ---�` �, \ \ \ \ ' 1 I I � / I 1 I \ \\\\ \\\\ / <�Jl I \-/LII ITSOFCLEARING/ I / I6° \ \ \J- \ \ ( 1\ \-/- �� \ \ \ 1 \ \ \ 1 \\\� \ \\ \ \ / �/ r/ / / / �� // / \� \ \ I / I \ - - \ I �-_- f '-, __ F\11=�f � __\ \�\\\ ,,� / / \\ \ \ \ \ \ \ / / J ` - -- -_\ \ \ \ \ 11� I I ( \\\ \ \ \ )\ \ r II I I \�/ &CONSTRUCTIONI�, \ l I I ` �,o/- -�_ \�� \ � \ \ \,-�- \ \ \ \\\ _/ \ I \\ \ /- \\ \ �/% // / / 0055� / / / "— \ --. \ \ \ \ \ \ \ \ \ \\ \ \\ \ \ \ I I \ \ \ \ \\ \ ( 1 \ I1 I I \ I n \ �' \ \" — \ \ / l \ , \ _ \� \ \\ \ � �_ < \ \\ \\ I \ \ \ \ / \ \\ \\\ \/ J( / / I / �"A� / \ / o� 1 \ 1 ( I —� V \ J 1 � \ \ \ / i'.r --- ,,�- \ \ _ .i-- c, ---� 1 I \ I /--' / / ci.?. / J \ \ \ \ \ \ \ \ \ \ \ 1 1 \ \ \ � \ I \ I / ( / � l� � P.) ShLT �ENCT - / _ \ \ \ 1 \ \ \ \� \ 1 I \ II 1 I ( �, /� /� /-/ - J�` \ �P�RD I�QNIS1iE�TEC J�.r�- - \\ \\ \\� `\ _ \ 1l\ �\��� o�---- l 1 �\ \\ \\\ / /I /� / ��� /) I I / \ \/ \� \ \\ \ \\ \\ \ \ \ \\ \ 1 \ \ II 1 \_ 1 \ ` \ �1 \ 1 I ( \ \\ \\ /// / / f 1 \� \ \ \ �� \ \\ \ \ \\ __J \\ \ \ \\\ \ 1 o I \ \ 1111 I I / J /(-�/r J' (\ I\- \\-^ \ \ \ \\\ \ \ �/ \ \\ _ \ \ ---- / \ _ \\ \ _ - I o \ \\ // w �l / \ / \\ — —\� _i / / — rD -,\ \ \ / � \ \\ \ \ \ \ \ \� \\ \II I I I 1 \ 1� III Ill / / \-- - � �� / ) \\ \^ / \ \ le J / \\\ /� / / �/ ( G / - ( J \ \ ,_ \ �30— , — N / I \ \\� - I I/ _) �f / �� - J \ I I / \� \ \---�I 1�� �\_\ \\ I I \ , � / 1 / \ 1 \ l \,\V _- \\\\\\\\\\�\\\\ \\\\ 1111 1 \II I I // I) / / // ✓/ \ 1 I) x l_ \740 \ / i \` / / �� ( \ l \ \ \ \ \ ((- J / \ \ ) j�5o / kernporar \ \ - - 1 J �� \ \ \ \ I j /) ( I I I / i- /� 1 \ tock \ \ _ �T P BROW UTI�ET / \ / \ \ \\ \ \ I �I / r ---� �(� \ -=A` LL L0 POINTS IN/SE IMENT \ \ / �,� --\, `\ \ \ ( \ \ \ \ \ \ \ \ \ \ \ I ) I III ,J / �, �, 1 S Pile Loc\ - \ \ / / / / \ \ \ \ \ \ \ \ �\ \\ \ \ \ � \ \ \� \\\\ \\ \ \ 1 I I I / / / N I / J) I I r \ / / - - — �I \ \ �,.-�\ --� � � a,� / - \ \ \ _ - \ \ �N 1\ / � / / � 1 \, \ \ °i \ \ \ \ \\ \\ \� \ \\\\\\\ I , /I // JI / I I _J \, -� / \ / / \ \- - \\ � -- - \ \ - \ eo / I \ \ \ \\ \ � \ \\ \ 1 1 I � / \ �o / \ '- - \ \ / i / \ '� = LL , _ - - \ \ \ - -F P O (TYq. -S F UET _L/O \ \ do / rr, m - / \ I \_ \ \\ 1 / \ \\ \ \ \\\ \ \\ \\\\\\I I I �I / /��I1/ 1 I / I I I / 1 / \ 1 l \ 1 ` \\ /J '� \ \ \ ,-- \ / / /J - � \ \ \\ 1 1 \ J / I �� \\\ \ \ \ \ \ \ \ 1 I I I I I i I l I / J) \ I I I I ) 1 ^ I / I \ 1 ) \ \ ,, / \ \ \ •� �,� Aso \P�AN�51 iT�EC-4. / \! r' \ P I \ JI J� 1 \ \ \ I I I ( I I / 1 l / \ �-t- " —< / - \ \ \-_-� ^ ,��_ , -� O \ / ". Ar o / �� I \ \ \ 1 J 1 �� 1 I / // / 1) / r o / ` ll 1 1 \ \ \ \ I l \PAN 4654 s ss17/ 1 ( / / / I \ 1 I I `i —��� \ \ _ � J � \ \ _ '� \ I 1 r J o _ J/ \ / , _/ \\ 1 l � _ I I I 1 I I I I 1 1 \� \ \ \�,/ ljllll I\L� \\_/ I l / P I l I / l l l / ) \ I \ \ I� \\ \//\/ / 1 � 1 \ \ /� � ° � �� / /� I \ \\ J \ G V / '\ / LC \ — 1 74 O l y / YEKOOK fdAlvfES L/I 1 ( r �- 1 / / / 1 �\ \ \ I 1 i 1 II 1 I \ ) I / \ \ \ 1 I \ I o G / G \ G IT) 1 \ Lc \ `c �'ic \ \ \ \ — I \ / i / '\ "I i- 10 � f i _i \ \ \ .B. 27 6 Pg. 1654 / J 1 1 \ 1 \ I / I \� P G � i \ / \ 7=�\ 1 1 1 J � � > \ \ \ ' \ \ / 1 1 J I , �' \ I 1 I I ) , \ I A 'ROC AS R �✓ J � _7 ^� \ I (�! \ '\ 1 I/\ `= f\J J� ��) / / / / / / J \ l I Pill I I I 1 / c \�- - \ \ \ \ a10- u, /�/ / /� l LTI�IT� ILC ARI // I - --� --/� ( 1 G / / / I l I \ _ �__ �� - \ \\ \ \ \ / / / \ \' �� i l f \--j 1 ~ \ \ - ) / � III I / 1 / / / I / / - 1-1 _- - - G_ _ \\ \ \\\ /) \ \ �� / �, / / .,-/ / / // J CO TRUCTION �j \ I / / \ \ I I \ - G - \ 7so \ \ \ \ / / J \ c� / \ \ \ \ 4/ / - it \_ \\l 1 \ I I( 1 I/� 1 ( \ �\ \ \\ \ )\ I \ \t �� _/ --IL \ \ \ \ \ I� �-I // �'/ /// —_�,- ////' �/� ���_ ^��\\�\ \ \ I H I I / I I / l r = \ \ \ \ _ -/ - ��� \ --\ \ \1 \ \ \ / \ \ s - - \ / /' / \ \ \� \ \ \ \ \ �\ \ l / \ \-\ \ I / / // z/// !; �/ / (� I�I I 1 I l /' ( \� \ \\\ 1 � r � \ .- `�'_- - I cl ! _I \\� /\ \- ( - \\ \ \ \ \ 1 / / / / / \ g = 1 I I I I I I / ! / \ �_ I - IL FEN& � � '� - � \ \ \ I I \ ` / � \ I / /// / - - // //// "i — \� � \ \111 III / I / / / / / o C-, \� � y -\ \ 1\ \ \ ` 1 ( ( � I I - / / / ,\ \ ^\` I - \ t 1 I I I //� / /� / i ii///� 1 i�:_� \\ I / / / / \ \I a 1 I PER DEFAIL N SH T 4. , �.'' 1 \ \ / l / - \ \ / / \ \ \ ( / / \ l 1 /l l I \ / i� \\ �`�/j / r � \ \ I I II /// // / /// , / \,�/i/ \��\ 1 I III II11 / / ) � \_ I G //� _ \ P _( \ \ I I I /// // / // / /sir/ \,�5��///i/ �� 7 �\\\\\�\\\ \\ I I / / / / I \- \ \__ \ I- , \_/-\ \ \ \_r-�__- / ll / /i \\ \ \11 1 I I 1 1 \ \ \ Ill l / L _ / \ \ \ I / //-/i////--\\\ \\\\\��� / / / \ / \ \ / / / III I �) I / I ll 1 / / / / / ---% �-/- -� \\\�\\ \%\ \\1 11\1 1 I --\ s \ \ /_ I / �/ / f / I ( III 1 I // \v "j60%/ --\ \\\\\\\ \\\\\\ �1\ \ \ ( ( ) I I I J "` \ '\ �\ ��/ // \- ( \ \ ��\ I\ \� I �I \\ \ \ \ \ \ ^mil / ( \ \ 11 / ) I 11 I I I / � \ 1 i-- / % - - \ \ \\\ �\\\� \�\I\\ 1 \ \ 1 1 I ( / � \ \ \ \ \ \ - _ � I 1 \ � \ I \ \ / \ I / / / / I I I ,_ 770 - - \ \ \ \\ I 1 1 r I 1 I \ � f � _ o ,o / l TEMP. SILT FE CEl1 I \ \ I I \1 \ _ - // �- \ \ \ \\ \ \\\\�\\\\\ \\\\ \` I I \I ) /� \ �\ \ J i 1 I I \\ I 1 I\ 1 0 "o' �-16 i� e� / \ // -, %` PERD AIL ON SHEET C . \ \�\\\� I � _� �' / --__// \ \ \ \ \\\\1 \ \ �\\\ I / \\ , \ ) 1 \ 1 \ I \ �I �\ Q zz �P \ \\ \ \� \\ \\ \ ' c\\� /o \ \ \/%i�``�- \\\ 1 \ 1 I I / / ) l o \ / �,� 2 \ - / \\ \\ \ \ \J�//�/tl\ \� \\\I\ i ( ( II I \\ `\ \ I ( 1 II n (\\\\\\\ \- so og2� r -,-,-" _T/_�_�\ \\ \ \ \ \ - - / / _ - �\ \ \ �J��;��\ \�\ III\\� 1 / / i / \\ \, 1 J L E G E N D \ \\ _ _ \ \\1�f I I r\ \ \ 1 �/ �i J/ -/ o // /I ll j \ \\\ \- \'so Ilr-\/\ 1-1 I / BEM ROCC�I€R_O�TL�T \ \ \ \� \)1(() F' -- I I �\\\ \ \ I I / o \ �, __ LIMI S'rOF CLEAR NG-11 / i / / \ — — TEMPORARY SILT FENCE ---- - \ ) � I I \1 �I \\\ \\\\ -� "_ /� ,2 '\ )/((/\\, �.-%�\ �\,�\ I �1 I I / J / 1 �c \ l \ & RUCTI N / � / /' ,AT L/ OI S IIV)SEDI N� _ \ ) ( ) �"��\\��\`\ \ \ \\ \ / / � ` SF \ \ - PER DETAIL 6.62. �' \ \ \ \\\\ f \��\ \\1/ ° \ / __ / _ - / / „ FENCI�II G P �S E ETA L ON\ \ \( ) \\ �� \�\� \ \\I ` I / I Q .�' v \ \ / / / \; \ �_ \ \ \\ ) ��) \ \ ( \\\\\ \\\ \ \ I I / �,�.tQ I \ I > \ r / / �o J / - . - , J TEMPORARY ROCK WIER OUTLET - - - -/ �� \/ I \ \ \\\ \ ���\ - - - / / / ` PLVr5HE�EC_j \ \ \ .'_ � \�A, 1\ \ l\ 1\\I / / J o I ) / / / / - ( I- - /—SF�I—SF— w J 1, \f(� \\ \��� o� / J _-�\ \ \� ) \_ \ /�� �. \:�:,\\11I IIII\\\ 11 I II / I \ / 1 i 4 / \ ) / 1 _ / --- \ - PER DETAIL 00.00 / &� H� /^ 4d \ / — I / n \ \ \ _\ \ \ 1 �O� \ \\\\ III1�- )I 11�/ I I I I / J > / / / / / — / \ < / ,� STABILIZED CONSTRUCTION ENTRANCE o f (� \�� ,_\ _/ / 1- \l\ �-\\\\\"I �\ \ \�\\\I/ill/ III ( I (�I ` --� �` / I ��� J / / / � �// _-/ � , \J �� --'> �J `� v / \ \ / \ \ \ \ 1 \II\1\ r-// I \ // J I I I I / I I / / / / / / / / > % �- -Oc�, �a i� 1fN \ \ \ ��� \. - /��_� - -\_ 1 I �I)� \ \ \�-` 1 I J I IIIIIIIII�J(/��/�) //i/ / / ( / / / �/ / l / ��� j- ��- � --\ /� r�� n O PER DETAIL 6.06. -- Itt�o ". _\� - \ L \ I I rr 1 I J\ , / J 11 /- _ . ,\� ^ zoo\ \ I �= g°o�-� �� -���r` \� \\�\ \ \ \\�� \ I II�IIII�`II�%/P��/ ��I / // l // // / P >' 1 // // //_/-�- __ -� _'- /-� \\ j -/ I- ___� - - EXISTING CONTOURS z m L z \ \ ^�. / \ \ \ \ - \ \ \ I I I 1 I \\�///J/// - / / / / / / 1 / / - // / aUo N Z a — \ \ J -_/ \ \ ) \ � l \\ ////// / / / / / P P / / / _ � l PROPOSED CONTOURS �� \ ( -� \ w \ II1\/ / ( �) / , �� ( I � / - ) - --�\ 9\ \aq \ \s-J JI , - \_ 1 \ \ \ `-, \\ I / II /�,/// / / 1 / ( i t / - -- r .� / _ \ I\ __,--/ 4 \\ \ \>,l_ l -\ \\\I�1 I� )(I / / // / a 1 I �( to r / ) I / / / _ / B-�� E- ) t \ / / x �,rea / / , I �— — \ / �/ j LC LIMITS OF CONSTRUCTION (TYPICAL) �/ \ \ \�� \ \ (�/-\�\\� /�\�w�\11IIII I�\�J ///I/ I� / ��� I �) 1 \ 5t�9`�91 I // / / � J / - j /-\ j A 4F 6 f^J \ Te _ �/) -\ \ \ ° � P ^ I I1 \\j � \/ / r / I I l I I / 1 / - r� _ � c,°��.� ?/ ----- --- \ \ .S 1 \� ` \ w °, I I l' // / I / / � I n \ � I ` -- f , :- \ ' !'� / �/ / / --� --� \ N78' 26' 5"W \� to t po \ a l \ � \ '� \ ) \ i - / - \ —/^ 31.99' \ oAi/eroY � _ \ \ ) � � 7, ( I I I - I / I \ \ \ \ l _ � i���� — \v/ , /� / i --^ \ l a� / \ l -, � / / -- \ 5 hoc \ / L \ co\ ' ?) / I �\_ 1 // / / TEMP. CONSTRUCTION ENTRANCE/EXIT I \ \ ` \ - � ° /, ij / r J \ \ - J/ice -� _ \ - � - /, - - \ \ \ \ N7 4'43. \ F — 1 am , \ \ r \ -.? I \ / / / PER DETAIL ON PLAN SHEET EC-+� `'> ( ) / \ 81, > �j J,l� / / / - \ - _ - / - �/ C � , J � \ - - - 10' 0 j `> \ \ \\\\ �-: l \ 1\ \ \__ -/// / / ( �i�/ ��12 / / \ ` `\ Eleb- .i J-- \ \ j^__ \�- / �J-1 / J / -� \ / �- \--- -�- - eon _ - aw \ \ I \ \ \--/ / / I I r I / ` "\,\��5`I \ /�\ r r�\_�J / \ -J/ �1 / l % / \\ �-\\ I ) )\.o\- N , \ \ J / / / / ( ` t Pa --, \-/ _/ / - /\ / '\_ \ \ I I \\ >� � 1 / � - \ / � �.�1 \ �p6a \ � r\- / \ / / � f� —8po \ \\ \ \ / / l � \ \ /f / o ( o` \ `1 $. I i ) \ —� ----- / \ / / / / / `� \ ` \ TEMP. C NSTRUdTION,E TRANCOUIT. \ \ \ \ '�o -` / I � J / / / � \ \ � � \ \ 9� I I (1))/\\\ - _ / \\ - - - _ _ \ - J / / ` - �' \ / i /11, \ �\ 3 1 PER DET IL ON P N SH \T E� / - - - - - _ , 1 \ \ SAArDRA�JD ss4,s� 4ps 81.49 \ "W \� \ b�2. ' 3' I \ / J I I 1 \ II / / / \ / / - / _ \ \ j ��6Y,A�V9 5a�- \ \ \ 1\ \ \ \` ` \ l> _ _ // / / J- r - - - - _ - - - - \- - - _ _ \ \ \ \ ° - 716�SON STIREw / 0 ��_� _3" ) l \ \ / / / I / 1 �� \ / / gyp) o g. '�523 I \ \ \ \ \ \ � 1 \ \ � :— - , - % J� / / ( � /_� - _ � _ - -� - . \ \ N73� 2 O W N�2' S1 \ 47" / , \ �\ \ __\ \ \263 A \ 1 4 - 9.7� ) f t \ \ \ \ - \\ \ \ \ \\ ( ( / \ �� / / I I \ I // �V_/ __ \ \ �& \ \ \ \ I 1 \ 1 \1 \ \\\"I, 1�,_,_-� -� \ I ,-� ,_ �A I �I'E \ \ \ ___\ \ \ " - J ( \ \ _ — —k l k=758.11 ' � o°-/ _ �/ ) 5 r 11 e \ \ \ \ l I 1 � i I P 1 � \ \ \ \ \ \ \ � ) I Q � � 0 \ 50 100 J l — \ \ \ \\ \ \ \ I \ � \ I �`J _ _ _ - _ /�,_ -� \ ) 1 1?\ P9I 21p2 I \ \ \ \ l I ( \ I / / l \ � \ \ \ ) 1� \ � \� I r - �__ _ _ _ _ \ \ ` 1 \ pIN \ � 6° 7�9`, g I 1 og. �1;1 1 \ \ \ � \ ( \ \ � \ - "I \ \ \ \ I I / \ /ram \ \ \ ) 1L \ \ \ \\ _ l _ _ _ \ \ \ \ \ \ DAMES ds4-ss )9g �_— - ° ! i_ \ 465�-� p,RC� \ 1 \ \ \ \ I 1 / I — — \ \ \ 1 I ) \ \ \ \ \ \ I I I / � ) 1 I r � I / \ / ; _KnD�F W_h�dt'Si1� F0 \ �� _ � \ \ \ 1 I 1 _ - PAN �3 \ \ \ I \� \ \ 1 I I \ \ /� \ / l I / "I / _ �� \ _ \- �inctr��0 ee�t \ \ \ \ \ \ N, / B' I s g0 s9�N� ( J —z-v \ \ / I \ aE�RR�e ��E �\ \ \ \ \\ \ \ ` \ J > -\\ \ ,1_ � \ ) 11, I, l I \ - / I / / l / r r , // - - b 01'��LOI�� - _ - - , _ / \. \ > �� I \ \ \ PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: z 0o • � U N 73 id . W Q . 3 3 A ,� a '" 3 � � v -,000 � to W o.~ �n �.2 4 U U" �% F�1 ,, � 0 0 o�._ UZ *��_l �00U..~.�wW)a)U Q,ta "�zoA W O � A) � O l a :z :s �- 0 Z riv = �-4 F-, I.-4 000 O 0 O � -) �Loz U �� x I-• O_Jr,r) w 00 �4m__J^ O�0 0 ��� LL_o 0) �4 O� o w O o- Ow a_ Cz �� a ill Cn • Z "--4 O Cz I..; � �4 C..) 0 O1_0 W N W � � � 0 =ate 0 'Z Q O 0 OoQ� U --!!!4 0�0(1) = = O � W Z = -, � 0- 4 1.4 t W � Q E4 .`4 w � V) V 1 CU U) " _<� W 0 = 0 = S�` , _'4' _ c' AN ' $4 ; __ ' 0 : 4? 0 : *,i7�, �,//��� 111\\\� REVISIONS BY Date: 12/03/20 Scale: 1 , -100 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet EC-1 of 4 Sheets f _ _ • \ \\ \ /E_ P/N 4655-�— \ \\\ \ \ ' 2s I1GIELA w',� \\\ \ _\7L71� / SUN \ \ \ x �` / / / , \ \� cy d \ \ 04 A L \ \ \ \ —_--\J \niti7� ti _ / v / / / / / / \ < \\\\ �\\`C /\ \ \ 1 °moo -�-c�i \ \ \ / J� // \\ \\\ �- \ \ \ \ � _i - 1 \ \ \ \ \ \ \ \ \ \ \ %O 1 \ ' ^tea ��—� \ \-- /— / \ �/ / / / / \ \ \ / v \ <-\ \ \ \\\ _7�0\ -'J\_- \\ 1 \ I I \\ ado ^\ �o- \� - �r�/ �0�v , \\ \\ YEAR FLOODLINE C, \ , / \ \ —� _ Z m �o�� 1 \ \ \ — \ 720 A \ -2 —o— / — y- \ \ y \ Fr J< r \ \NI am- 1- - \ \\ \ �\ \ \ \ \ I! r - \ < = \ r- _n r �/ 3 E \ - x J \ / - w a ) / J o N\ \ ( i \ \ .;F■ 1 F \� �\\� \�\\\ \\ \\\ \\ �\ \\ \� \mil O \ \\ `-\--- \�\ -//' / / \-_ �- --- '� / \ \ \ /.��ti\� \\\ \\\\\\ \ \\\\ \ 1 \ `\ \ ` Q . `f \\ AI \ — \�\ \ \\ \\\ \ \ \ FLOOD �'\ INITY--\� _ \\ \ \ \\\ \ \ GENERAL NOTES: ���\�\ \ w�� `\\ 1. Current boundary based on information from l` \ _ n � 100 YEAR FLOODLINE Iredell County GIS. Boundary will be verified by field survey. I I 1 III III\ \\ \ — 2. Contractor to maintain all weather drive access for I I nCN" //// I )/J II \ / /^ 1/f/ --\� /ice— _�� \\ -` existing house of Pamela Edwards. /oti` -•�i / / `�\�� \\ \\ \� �\ APPR)r 3. Contractor to verify use of timber bridges for o ///, //� /� > 1 I f f Jul / / , _ \\\\ �, // _ \� — _ 3/d I ST,QLAM crossingof existing as lines during construction. / //�/ "' //� I I I / / / / / / / / , — \` _ �� \\ \� — gg g /, //// // I / /�/� III / / \\\/ // \�\\\ \��� \` $E E — ---< 4. Proposed driveway locations to be submitted with ,''�'// / �� / / / ) \ \` — / / / ! 1 / / /,' / / �%// /� — — \\ ��\ \ \\� \\ ` ` ' w R Lll�j, 3/d ` 69 — o--/ p Y / / _ _J 1 \ \ \ \ \ F nn future erosion control of individual lots. /�, /I (/ / — ___ =/ /, / / i _ _ \ \ \ \ >3 \ \ l) I \ \ 'V 3Id -�' 9� ! //1 \/ f�\I / / \ \\ \ I I \� _— \ \ 31d - 700= __ = Tic75o 0� - / (( \ I L \) - \ i / /'�EMP CK WIER OUTLET / \ Il 11\ \ ^` l ((> l \ 1 _ -_ \\\ \ - - - / ��e ) 1 \ 1 \ I I O \ /A'f A�L LO�N POINTS IN SEDIMENT - \ �� \\` \�° \ \ 1 II / \ \ \\ \ - 3/d - r — / f \ \\ \ \ PPP* SEE DETAIL ONE \ \ 1 \\\ \\ \\/T�A4P CFE�E�( P�LL�WA�( ` - — — o 1 D� // I �f I f 1 / �' / / -r3 C-4.. / \ \ \ / \ \ \ \\ \� SON ��� _& '10� - - _ _ _ _ \_- J s9 / /CI / I I 1 \\\ I ( -/ / f / �� / S °� \ \ \ \ \ \ \ \�kIEI -_— _--- N r _/ \ \ \ �2ro�sl p 549 / I I I \ / / 1 0 ( I 5 \\� — \\ \ \ \ \\ / \ Cw \ \ _ --- \ \ 1'9. lg � I I I I I \\ \ \ \� \ \\ � � _ _--,. r I � l I I 1 � / ,�_� \ \ \ ✓ / / \ \ _ I ALA RALL PROTNY « \ \ \ \ T N�SECT Iy�OFORI�h �P \ / / / -� \ \ / v ,8p \ \ \ \ \ I \ \\ \ \ \\ // N1POR�R HAR WAR �L(�TH J \ \ - \ \ 6ETAIL�� ON �I LIfl \\ / \ \ \ I I I \ \ \ /ram p rE / / \ \ _!'� \ \ \ I I 1 \ \ \ / �8A �L I / - I� D€Ti�IL & S�HnT FC- FE)"I�I \ \ \ I \ 1 I ( I / \\ \ \ / / 1 \ \\ II\ / / �/- DET L6. 1O SHEET \-� / -\� \ \�\� \ \\ \�_ J \\ 1 /- \� \ \ \\�' /� �I // / �7� � J \ \ / / / / \ \ \ \ \ I I I / I 111\\\\\�f I�— �/ 8EW N- \ \ 1 I I I I \ / %/ _ / _ 1 J )I TEMPORARY-STOJCKP1ILE �C7CATII S\SUB CfiIo I��EIS Dl� N PLAN S�IE, (zR-\\- i III ( / I _ _ �PZAN 3'H1=E — \ \ \ \ ) \ r I \/ \� \ \ / \PLAIN\ G�2-3. J LIM17fS OF CARING CHA�VG�, UP M FN �P�RQV L SLTB�I \ / \� S OFFSISF�EETIC�- - - \ c �� \ > _ - J - \ \ \ r& CbN Tt UCTION / J� � / / \ 1`CHvI�. tFENCE-_- 5 � \ / \ 1 \ \ \ \ \ \ \ �- \ PERD IL�01�1 \�\���\ --�/ \\\\ \\ JlJ /- J I J a 1 s \ \ \ \ / \ 1 1 \ / \\ \ \ \ \\ \ I \ \ )1 111 I 1 (/ J/J/~ / �_ \_ \ 11 \ \ `�—/� \ CF �`� \ \f ,\\ \tc\ ��)\\ I I ( \\ \ \/ \\ \\ \\ \\ \ \ \ \I J I\ \ I I11 r — �— \ l N \ \ \\ \ � � ` \ \ ^ / \ \ � � C-4\_ I\ \ � \ \ \\7 p J � v � \ \ \ \ \ \\ \\\ o I / �/ J / (\ I / \� �\ \J r \\ \\\ \\ \\ \\ \\ \ \\ III ► \ ► ► ► 1 /IJI , , /J f ) / \ e , — \ \ , \ \ \ \ \ \ I I I v / Il1I l / I0 �- \ �x�as n r y �/ \,_- I��I\� \�� \ \ \ W�go / kemp?aryl \ \ \ �� I CHAI�NEL\LI�VI(IVC�S/MA IIN� �NST�LL \ \ M b1�A `I( C�i C�K D MS/ I I I J) I ( I I I (� J / /\ /i- as 1 \ tock \ �S6_ �o�--'T P BROW OUTLET \ PER DETAi� Or\V EG` MAT�LIST� \ \ \ \\ \ \ \\\ \ \\q� f I / a�-hanel�>--�s�-�/ Pile Loci \ ` \ / / w to \ \ \ EQ-3. \ \\ \ \\ \\ \ \ \ \ \ \\ �LE� I / I / /III LL LOW POINTS I IMENT \ \ \ \ \ \ \ 1 V. / \ �\ \\ �\ \\\ \\ \ \ \ \ \\ P 1618� I / /! I l l I I I 1 J \ �, b _ _ �� \ - -� \\ \ -�P�Z� (TYP}'. ET UOI�I \ \ \ \ \ -T' IEC ' I I I I r� 1 / I I / TEMP R`� C HECK DAMS/ - -/ -�® LL 750 � y� '--\PdAN\SRFk�E (J7 I / r-ST W WATTLE U��. = fi « /�,� _ are \ \ �� / PER DETAIL 83 ( 1 ' I / + > a n_e # > I FIL IN PREA TO DKAIN / c _-_ z cr Q N_ - \ \ /) o v PIN 4654�58-6817/ al ; I i \ \ \ \ \ J I l/ II I I (\�� \` J / J \ / I I I J I / / / / 0 SHEET �C-4. I �'\ \ -�ITCM TO YI3 / i �c -ns - \ �S I I 1 \\ \ - / / J \ 740, / o a 1 \ \ \ \ d.6. 27�F6 Pg. 1654/ I I L�1 T� f I / I ✓ \ �� -J o G G G - J \ �c �c\ _ �c �c �. \ I / YMMOK I OM -ES L/t \ \ \ ( \ \ I I I I 1 1 / / \ �- \ \ 1 -� \ \ \ \ \ / f ��� ► I I I I ,— 1 I A P'ROiX I AS R V!�` =� G \ _ �� .... , \ / \ J o �/ \ \\\ 8,0- w \& 9� /�l/l/ ( —/�_= r I I J � / / / '�� -� 1 I / 6 AC. \\ \_\ \\\\\ \ �/ O / / \�-� �^ �1� \ - o / �, / / ) / / // / / / / / J / M-P.-SILT FEN I I / / i / \ 1 \ / / _i P R\,-MArILONS ETEC-4 I \ )�\�- \ \ \�\ �� ,�I Y i/ /�/ =—/ \\\ \ l,�l�ll I I I ( / 1 / —I =I 1 1 ( / 1 \ \\\—`� / / —�G \ \ \ 7 —/ /l \ �JEMPQRARY HA R�DW�R T & 1 \ \ \ \ \ l \ I \� \ \ 1 / \ N \ \ `- GRAVEL MLL;T�ROTE I N •P€� \ \ - - \ I I I ! 1 I \ \ - \ ( / IN, \ \�" / o� " 1 \ \ \ 1 \TEMP: SILy fEI�� i \ $E�AIL 6.5 N SHE EC-4. 111 1 II / I / / r� �`\ \� I III/ / I III II1I I/ /// I 1 I PERDEff�ILO�SH TES -4./- \ f \� \-r- - // ( ��� / J\�i \ \ \\ 11/ Jr' I \ \ __ / \ \ \\11 111I1 I % / I \ / \ I I l l \ \ `I \ Existing 14' Wide Drivew�y Acb I / // /�\ O _ / �Jb�� I Y`\ 1 L / �� r— \ / — — \ \ _ 7 1 1 \ 32 I / \ \ \ Easement per DB 16 2 P e6. O / \ \ \ \ \ 1 \ \ \'� �II� E OCA ONS / ~ \ `rj� — J / — J \ \ L� \ \ S° \ \ a I — / _ >` \ � �I ( !( � I II I I % a FES9 _ .760bo' / ,— \\\\\ \\\\\ \1\ � I `�\ '� \— � _ � � �^,\ � I 1 \/— �`� \/ / \ \ SI \\ IVJE T TO CHA�IG . PUN FINAL i \ \ - / \ I l lL \ I \ \ \ \ JB8 /i/ / �EMP�EIW \li � C� \ \I AP�f290V(A I rBJEC�i T NSIT AND ( - / I \ N ST K 0 \ `"1 1 , \ `�'�� \ ��, 1„\\ \ \\ \ \ I (0 FITE SPTIC. \ \ \ ` 1 ) 0 1 \ \ I ` „�0�50 �° A� Z26� L E G E N D ) I TIC�SI'II\\\ J//�fll\�\\\ \ ( 1 I O ` I ( \ ( ) 1 1 1 \- �`�� �'p9. �% \\��o _ - _ _ _ \ \\ \ ,�� ��� 1,`\1 �I 1 \ 1 I ( I I 40) \ / ) n \ \ \ \ \ `\ so og' TEMPORARY SILT FENCE fT \ \ \ \ \ \ /j=€@IM�� l\Y C�I F S\\ \\ \ \ 1 \ \ ( / 1 ) I i / / , / J �) \ \ \ \ \ -- \ s I l r - \ / SF PER DETAIL 6.62. INSTALL RIP P/OUTFAyL P CTION\ \ \ \ '`' %\ I J \ \ - o I I \ \ Q \ \ RERLS�ON PL`A S RA \ \ \\\ 1 I ( I I I \ / / 77 / 1 - �\ _ I N AT END SECTIONS OF STORM DRAIN PIPE (TYP).\ \ \ \\ \ \\�\y / \v /1 ' \� \ \ \� \ I I I I / LIMITSOF CLEAR NG - \ - \ TEMPORARY ROCK WIER OUTLET C SEE DETAIL 6.41 O EC-4 FOR INS TION I \) I I 1 \\ \ ` - / ^ \ �PLA1dSH` G�.\ \ \ \ �)�((�/ll L"'\���\ �\ \ \\ I 1 \ Jam° /v / / / / ) \ `� - SF�SF PER DETAIL 00.00 - \ t\ -%\ \ \ \ \ \\��\\\� �\ \\ 1\l & fiRUCT N / -DIET-AIL SkIEETEC-3FO ZN \ \ / /v / _�� \ \ \ ( j\�^ \\ _ \ - /ct: \\ \ \� C1l j_`_ �_ l\ \ \ \ \ \ ( \ ����\\\y�\ \ 1 I I / // / o / // - / / J' O STABILIZED CONSTRUCTION ENTRANCE F ^ \� /o �/ - \ - \ \ ` \ \ �� 1�,l`I1) \mil 1�,, �l\\ I ,11I / / / / I \ > / / / / _ // - - - -- \ J J \ \ < \ V PER DETAIL 6.06. (970 f /� \ \ d \ - - 'T€M P. RdcK V1(I� \ \ ` \ \ I 1 / / I I ( ►--� \ / / / - / - _ - / EXISTING CONTOURS / AT ALL L)0 POI1V SIN SEDIM T� wa \1\VN\ N>G >TP) ! I L\O % ° —' -- PROPOSED CONTOURSt o o) NN 3 00 ^ bol) LIMITS OF CONSTRUCTION (TYPICAL)\/ C14 z m rn \ r-) o ­4 g v CHANNv L \ LININGS/MATING INSTALL TEMPORARY CHECK DAM PER DAIL ON/EC-4 & �ATERIAL\ PER DETAIL 6.83 ' DL `� _ .C� I I / / 2 \N i8' 26' S"W \� took PorO r I J -� / / OAN/J PER HARDWARE DETAIL CLOTH &INLET PROTECTION 31.99' pl/e .Y I n \ / ` a M I I / I 0' 20' �IGN EASEMENT\ \ 6' • / / `� \ \ / / / / \ 5 oc. \ co\ J / I �� - / / TEMP. CONSTRUCTION ENT X T \ \ \ /, /j / r \ '�J� `}3' 30 / / PER DETAIL AN SHEET EC-4 '> ( ) / 87 J� / �/ / J - _ \ \ - - PER DETAIL 6.41 \ r �s \ n / / � / � RIP RAP OUTFACE PROTECTION \ F 4. 1 / o, 08 w n o \ \ \ l�\\ o[ �: �( l \ 1 \ \ z // / / / / f , o. T. f 112 / / / \ \ \-z -� \� - r - = \T �/ / I J FEsz / / ( \ �'-� --\�� r �/f�\-�J // <Channel< f / �I 4 I o z \ \ J 1 / ��1 ) \ - / HARDWARE CLOTH &INLET PROTECTION / \ 70.T P. —800 C NSTRUCTION E TRAN�FXIT-� \ \ \ / / �' \\� _ - \ \ \ I I / I /\\\ - - �- �/� \ _ / PER DETAIL 6.51 / /\ � P,, oPER DET IL ON PLAN SH E� EC 4- \ \ \-R173� „W �T I \ SAIV \ P/N 465 \ \ ° 332. - \- DRA\JO 4 57_4 61.49' \ R3 n 30' l \ \ \ o H S\. STIR \ \ N73'� 2 p0"W �' 02'1 51'l 47" \ ) / I l \ / / / \ / o°' %\�\\ \tom. / / �p�5 og �523 P� I \ \ \ \ \ \ \ \ \ I \ \ �l(/ ���\ / // J� /( / - - - • - _�r _-� - - \ \ 12s3 1 „0174' \ \ \ \ \ I \\ \ \ 1 \ o \ 1 I \ \ \ \ \ \\\ I�`ME I °9�� �. \ \ 1 I I — _ — to — — i ) \ -4= .79, k=758.11 5 O�V _�� / i{ \ pQ� — \\ 1 a65� 77�Zg ol2 I o \ \ I I 1 I \ \ \ \ \\ -`1 / �� \� I I r l�l - o \ so o� J � ,1 \ P\N 11P9 2\ \ L\ \ \ 1 I I �� ( J ( ` \ \ \ i 1 \� '\�� I J 1 I / / - \\ \ zf \ \ \ \ \ \ \ \ JEIPIN 4a54-Sg� ` —_> e°° f �_ _ 54-�7� C� R 1 I o8 \ 1 \ ( \ \ \ �\ \ I 1 �� I 1 ) 1 J \ — _ l 1 I 1 1 \ I o ES R J 9946 / } \p\N 46 w Q+g �32 \ \ \ \ \ �\ \ \ \ \ \ ` \ \ \ \ I I / 1 l / J 1 I (� / \ n�D w�11�t1�% F0\ �r _� _ e �si P OHNSON l �v - - ,Rg� ,1E �a \ \ \ I \ i ) \\ \ I I \ ^' 1 � \ l I s l �/ \ - \ I gl 125g 1 ( \ / SE tee. \ \. �\ \ J �\ \\ \ 11, \\ \ 1 \I \, I, I l ( \ \ / I /l / l /; �( Jr /,� \ // f � b Ore-�OI�� ` �inctr��0 ee�t �\ Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: z r/ o • U N 73 cl cl N 3 � 00 Qi �NO W•�~~ �n ��U �UZ 0 0 �a Uzun 0 o W A A a)0 rA "� o �z _a a 1 � 0 Ln N o Ln � Lo �� xW00 O _J r,­� �m_^ O�0 0 U���o) o � O� o w O Ow 0 E C� Q O V 1 O • Q TO v c) ION." FEENNNNIII O 7 O ( 04 � W � � � O 0 � M••�•H P-4 �r ; 15 \\\`��� REVISIONS BY Date: 12/03/20 Scale: 1 , -100 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet EC-2 of 4 Sheets NARRATIVE: Oaksprings, LLC is proposing to construct a new residential subdivision off Presbyterian Road in Mooresville, Iredell County, NC. The scope of work will involve stripping topsoil & stockpiling along with preparing subgrade, lot grading, storm drainage, utilities, and placement of asphalt. Offsite areas will be protected from sedimentation using temporary construction entrance/exit, temporary sediment fencing with rock wier outlets, rock pipe inlet protection, hardware cloth and gravel inlet protection, lined channels with temporary check dams/straw wattles, and two temporary sediment basins. The limits of construction shall be as shown on plans. Total disturbed area is estimated to be no more than 8 acres. Upon completion all disturbed areas shall be permanently stabilized with asphalt, concrete and grass as per the seeding specifications. /' r-A 1 r-M A I _ The work shall consist of furnishing labor and material, equipment and performing all operations necessary for a complete installation of all work as specified herein and as shown on the drawings. 1. Work shall consist of installation of temporary erosion control measures; stripping topsoil, preparing subgrade, placement of stone, concrete & asphalt; redistribution of topsoil strippings, and permanent seeding. All disturbed areas shall be left in a stabilized condition upon completion of this project. 2. The Contractor is expected to examine the site to familiarize himself with site conditions. The Contractor shall carefully read all the specifications and examine the drawings and details in order to thoroughly familiarize himself with the work to be done. Any work shown on the drawings or included in the specifications, or reasonably implied by either, shall be performed the some as if called for by both. 1. A temporary bench mark shall be established on site. 2. The Contractor shall be thoroughly familiar with the Erosion Control Sequence as stated hereafter and shall follow this sequence to insure that no off site pollution occurs during or after construction. Any deviation from this stated sequence or plans and details shall have prior approval of the Owner's Engineer and Iredell County Erosion Control Office. 3. Top Soil: Strip all top soil from the area to be graded and stockpile on site for redistribution upon completion of grading. 4. If required, soil borings shall be taken in the area of the buildings by a certified soils engineer and the results reported to the Owner's Engineer. This work shall be done if directed by the Owner's Engineer. 5. Fill Dirt shall be placed in the areas indicated on the plan. Fill material shall be free of brush, rubbish, and other material that will be detrimental to construction of a stable fill. All fill shall be compacted to a minimum of 95% Standard Proctor with proper moisture control.Maximum thickness of layers of fill to be compacted shall not exceed 8". No slopes shall be steeper than 2:1. The entire sub -grade after compaction shall be smooth and uniform slope. 6. Subgrade and fill to be verified and tested by Geotechnical Engineer. 7. Cut Material to be excavated is assumed to be earth and other materials that can be removed by power -shovel, bulldozer, motorized pan, or normal excavating equipment; but not requiring the use of explosives or drills. If rock (as defined herein) is encountered within the limits of excavation, the Contract Sum will be adjusted in compliance with provisions for "Changes in the Work" of the "Conditions of the Contract". When rock is encountered, Contractor shall notify the Engineer immediately; and shall not proceed further until instructions are given and measurements made for the purpose of establishing volume of rock and the value of excavating some. Rock is defined hereby as that material which cannot be ripped by a crawler- tractorrated at a minimum of 50,000 lbs. drawbar pull at one mile per hour, pulling a single -tooth ripper. Equipment shall be in good repair, and shall be in proper working condition. Rock is further defined hereby as boulders larger than 1 /2 cubic yard in size. No payment will be made on the basis of unit -price for rock unless minimum -sized equipment or better is utilized as required hereinbefore. Rock work is defined hereby as removal of material by drilling, blasting or wedging. Rock shall be stripped for measurement before excavating, and no rock excavated or loosened before measurement will be allowed or paid for as rock. Measurement and payment, therefore, shall be by number of cubic yards required to bring the excavation to the required surface or grade as required by the Contract Documents. The Owner may adjust the grades should excessive rock be encountered. EROSION CONTROL SPECIFICATIONS Requirements of the Contract Documents apply to all work in this section. GENERAL: Provide the work of this section for erosion and sediment control as indicated and specified as follows: Construction entrance; temporary sediment fencing, rock weir outlets, hardware cloth and gravel inlet protection, rock pipe inlet protection, rip rap outfall protection, channel matting and permanent seeding. CONTRACTOR'S RESPONSIBILITY: The Contractor shall furnish the Owner a system of temporary controls to minimize soil sediment erosion during the construction period caused by storm water runoff. Work shall be performed as called for on the drawings and as site conditions warrant. All erosion control measures shall be constructed in accordance with the NC Erosion and Sediment Control Planning and Design Manual Latest Edition. OWNER'S RESPONSIBILITY: After the acceptance, it is the Owner's responsibility to properly maintain the work. EROSION AND SEDIMENT CONTROL: The Contractor shall provide erosion and sediment control during the period of construction of this project. The Contractor shall protect and maintain the temporary erosion and sediment control structures which provide temporary sediment pollution control, as shown on the drawings. The Contractor shall protect and maintain the temporary facilities as necessary to trap soil erosion and sediment pollution created by storm water runoff. Maintenance of these facilities shall include, but not be limited to, regrading and filling of washed out areas, adding erosion control blankets, adding silt fence, and reseeding and mulching of the swales during the construction period if deemed necessary by the Owner, Owner's Engineer, or the Iredell County Erosion Control Office. EROSION CONTROL SEQUENCE: The following sequence of construction shall be staged as required to provide acceptable erosion and sediment control. 1. Contractor shall arrange a pre -construction meeting with the Owner, the Owner's Engineer, and a representative from the Iredell County Erosion Office prior to any land disturbing activity. An Erosion Control Plan Approval Certificate shall be displayed and a copy of the approved erosion control plan must be available on site at all times during construction. 2. Barricade off construction area. Construct access drive which shall receive a minimum of 6" depth of 2"-3" coarse aggregate in loose measurement at locations shown on the plan. Any sediment accumulation on adjacent public roads or areas not within limits of construction as a result of this project and traffic from this project shall be immediately cleaned off by the Contractor. (Minimum Stabilized Construction Entrance Length = 100' as per detail 6.06.) 3. Install construction entrance, sediment fencing with rock wier outlets as shown on plan sheet EC-1. *No prefabricated silt fence is to be used on this Dro iect.* 4. Strip topsoil and stockpile in areas as shown on the plans. Due to the lack of space, stockpiles may need to be shifted around as necessary. Contractor is responsible for providing adequate measures around stockpile areas at all times. 5. Rough grade site as shown by proposed contours. Stabilize disturbed areas as the sites are brought to grade. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegitative cover or other adequate erosion control devices or structures. In any event, slopes left exposed will, within 14 calender days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, sufficient to restrain erosion. The angle for graded slopes and fills must be demonstrated to be stable. Stable is the condition where the soil remains in its original configuration, with or without mechanical restraints. Additional measures to control and sediment may be required by Iredell County Erosion Control Inspector. 6. The Contractor shall install gravel base on roads and sow groundcover (including fertilizer and mulch) on all exposed earth areas within 14 calendar days following completion of any phase of grading; sow permanent groundcover for all disturbed areas within 14 calendar days following completion of construction or development. Contractor shall inspect seeded areas at 14 days after initial seeding and repair all bare areas. Non -stabilized areas shall be stabilized with erosion control blankets or other acceptable methods as approved by the Engineer. (See Stabilization Timefrome table this sheet). 7. The Contractor shall be responsible for maintaining all sediment and erosion control measures throughout the duration of the construction project. Maintenance shall include, but not be limited to: cleaning silt out of drain structures, adding extra gravel or riprap; regrading swales and washed out areas; repairing, replacing, or adding silt fence, etc., all as required. 8. Contractor shall clean all all impacted existing storm drainage structures, flumes, pipes, culverts, etc. prior to final payment. Contractor to clean affected pavement areas daily. Contractor shall communicate directly with the Owner or the Owner's representative to coordinate the relocation of autmobiles to prevent damage directly or indirectly as a result of these site improvements. 9. At the end of the project construction and after the paving and permanent ground cover is established, the Contractor shall request an inspection from Iredell County Erosion Control Office prior to receiving permission to remove all temporary erosion control structures grading these areas as shown by the proposed contours on Sheet EC-2 and seed all remaining disturbed areas, including any areas of poor quality vegetation. 10. Contractor shall "hold the Owner harmless" from financial penalty, which could be invoked by government authority, due to Contractor's negligence. SEEDING SPECIFICATIONS: SLOPES 3:1 or FLATTER 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate: DATE TYPE PLANTING RATE Aug 15 - Nov 1 Nov 1 - Mar 1* Mar 1 - Apr 15 Apr 15 - Jul 30 Tall Fescue Tall Fescue and Abruzzi Rye Tall Fescue Hulled Common or Bermuda 200 Ib/ac or 7 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 25 Ib/ac or 1 /2 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 30 Ib/ac or 1 Ib/1000 sf Jul 15 - Aug 15 Tall Fescue and 200 Ib/ac or 7 Ib/1000 sf Brown Millet or 35 Ib/ac or 7/8 Ib/1000 sf Sorghum -Sudan Hybrids 30 Ib/ac or 3/4 Ib/1000 sf * Heavily mulched during January - March period. Coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. 4. Mulch with straw applied at the rate of 75-100 Ib/1000 sf. and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. SLOPES GREATER THAN 3:1 TO 2:1 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate. DATE TYPE PLANTING RATE Mar 1 - Jun 1 Sericea Lespediza (scarified) & Mar - Apr Add Tall Fescue or Jun - Sep 1** German Millet or Small -Stemmed Sudan Grass Sep - Mar 1 Sericea Lespediza (unhulled-unscarified) Tall Fescue Millet or Sudan 50 Ib/ac or 11 Ib/1000 sf 150 Ib/ac or 3-1/2 Ib/1000 sf 40 Ib/ac or 1 Ib/1000 sf 50 Ib/ac or 1.2 Ib/1000 sf 70 Ib/ac or 1-3/4 Ib/1000 sf 150 Ib/ac or 3-1/2 Ib/1000 sf 20 Ib/ac or 1 /2 Ib/1000 sf ** Temporary - Reseed September 1 at recommended rates. 0 cc 00 OC 4. Mulch with 3" straw applied at the rate of 50-90 Ib/1000 sf and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. 0In Ln 00 ILLJ n AS 0 co Cn NVIN:$TMILlZ4TI0N 71MEFR .MEFx Sloe Area antdpaon Sfahlllrallon Tl"frwTre Exarpi RIP lono- Rrrirr.nrr d Ats, ioaIa, ePkFrts and slwos 7 dais Wrtir WO y WO+y wra4er -CI'hI Za"s 7 dwfs pkr" son �tiY Olin 3 � � drys II 3�OFli an 10r or Ira n iYr�l mid merror SbllPlr R4n ? 1. A G4}e am O7we4 � ,tJ ath& arras w?h slrgrs Ilalwr rhrti 4:1 id daYc Nratir, *5oeyetier prhWe.a andliOW Zenei TORh11 DRAINAGE OALOULATK)N. C AREA SUB cUMh+I, PIKE MIN, LOCATION LOCATION SUB INTENSITY FLOW FLOW n SIB SLOE FROM TO AC C IN M R C FS FS VALUE IN M #FE-1 FES- 2.46 0.60 7.08 10_45 10.45 0.013 16 0.98 6YI-3 Y1-4 3.40 0.60 7.08 14.44 14.44 0.0 1 � 24 0.41 yI-4 �QMJ-I-5 1.51 D.60 7.08 5.84 21.28 a.013 24 0.8$ 'FED-7'" JB-8 3.71 0.50 7.08 13.13 13.1 0.013 24 0.34 J13-8" FE�_1q 0.00 0.50 7.08 0.00 13.13 0.013 24 0.14 IND IC ATES E EO IN NINE OF NEW RUN *INDICATES AREA OF MOSTLY UNDEVELOPED OFF SITE AREA. H AN N E L a ES pGN CALCU LATION S ; INTENSITY INTENSITY 1 D Yr_ 2 Ye_ MAX- CONST_ FLOW TEMP- PERM. LOCATION AREA C 10-YEAR 2-YEAR FLOW FLOW SLOPE DEPTH DEPTH ELOCIT LINI0. N LINING CHANNEL 1 2.05 0.65 7.26 5.50 -9_67 7_33 3.00 1.50 0_78 3.61 SC250 GRASS CHANNEL 0.93 0.65 7.26 5.50 4_39 3.3 6.40 1.50 0_48 4.28 SC250 GRASS CHANNEL 3 0.12 0.65 7.2E 5.50 057 0.43 6.40 1.50 0.24 2.21 5C250 BRASS CHANNEL 4 0.0I} 0.65 7.26 5.50 0_38 0.29 8.30 1.50 0_19 2.22 SC250. GRASS CHANNEL 5 0.11) 0.65 7.26 5.50 0_47 0.36 3.20 1.50 0_21 0.95 SC250 GRASS CHANNEL 6 0,3� 0,65 7,25 5,50 1,79 1 36 3,00 1,50 021 1.17 SC250 SSE CHANNEL 7 0.95 0.65 7.26 5.50 4_48 21.40 2.30 1.5Q 0_64 2.37 SC250 GRASS CHANNEL 8 3.91 0.65 7.6 5.50 18.46 13.98 3.20 1.54 0.76 3.76 250 GRASS CHANNEL9 0.16 0.155 7.2E 5.50 0_T6 0.57 8.30 1.50 0_25 2.71 SC250 GRASS CHANNEL 10 0.24 0.65 7.26 5.50 1.13 0_86 3.00 1.50 0_58 1.71 SC250 GRASS CRANNEL 11 0,34 0,65 7,26 5,50 1.60 1.22 7.00 1,50 0.39 3,66 SC250 ERASE CHANNEL 0,3!a 0,65 726 5.50 1.84 1.39 7,00 1.50 0.30 252 5C250 ERASE -121 CHANNEL 73 0.215 0.155 7.26 5.50 1.23 0.93 7.90 1.50 0_29 3.11 SC250 GRASS CHANNEC 14 0.11 0.65 7.26 5.50 0_52 0_39 7.90 1.50 0.22 2.30 SC250 GRASS NOTE: NAB-0575 & O1 25 SC250 REFERS TO NORTH AMERICAh1 GREEN REINFORCEMENT MAT OR ENGINE E R AP P ROVED EQUAL. RAP OLITFALL RROTECT0N DATA STRUC. as Q a60 La 1Ar Ri e YIf End amax Thickness I.D. Inches IFS Inches Feet Feet Fit Inches Inches FES-2 18 10.45 3.0 8.0 4.5 9.$0 4.50 6.75 FEES :24 21.28 3.0 $.0 6.0 10.00 4.50 6.75 FED-9 4 13.13 3.0 8.0 6.0 10.00 4.60 �.75 ALL RIP FLAP OUTFACE P ROTE TION AS P1= R D E TAIL 6 .41. Slab Top Inlet Calculations Structure ID Q Inlet Side Length Inlet Side Width Total Length Height Depth Inlet I.D. CFS Ft. Ft. Ft. Ft. Ft. *YI-3 14.44 4 3 14 0.5 0.461 YI-4 6.84 4 3 14 0.5 0.280 Calculated Using Orifice Equation and Weir Equation Taken From Charlotte Storm Water Manual 5 EDIA+IEf4T aR&dN . DE N LFaED MIN. R = Q. MIN. REP. �E�• QED• QED. U4'EIR 5T1C]RArm E STORAGE 5 TD R.KGE V.-E; R FLOW TOP TAP SOT. 9 DT. 60T. 5M4lVIhf R :SKIMR RASIN AREA AREA STaRAGE � 5 LJ R F. ARE 13EPTN w9I0YN LENGTH LE N :2 TH DEPTH WIDTH LENGTH WIDTH LENGTI-! 9 AS IN 51EE 4R IFiC E N4JMIRER {AORgSh JACkESf [CFI CPS �s P] lFtJ [FTj 1�11*1j IFT1 IF7j IFTj I;FTf {FTf {FTf ELEV. {N} f]LL(IN) 1 4.C?3 1213 3394 20.2a 6591 5.0 57 115 10 0.72 -55 � 23 37 95 7511010 1. 5Q 1.20 Qes lign Requ iremerrts; F l;Qaro 2,00 Fmk 10 Yr Storm InhensiPV 7.30 irliFlr C= 0_6 ALL TEMPORARY SKRWME R SEIDIM ENT BASINS TO BE C4>6TITEAS D PER DETAIL 115. Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: r/ o U � �N000 v w•�r"'� A �o4 0 0 r� r o 101 r7tiAtil t c.lr�,sT�t. .. . . 0. iQ . L�l ......... .... Z' X . z1viz 50, 11711� i+'•ar � rt: •�:iNv'�y�• �.. �r�/ �yfL►w•••�.i�R•�.LwI✓re\ate- i �f�x Rl..•��i�� M* l��S�.��+1 •\+tea .:�r• . vita:: s�..'T�,-�•I��,./i `�;�• 4 •� 4 �%j• W •r h r• e .♦ 1 N min 2-3"I coarseag gireg. ....rc rigure r . Construction 6.41 09 Pipe Outlet to Flat Area — No Well-defined Channel -;,- .-.---- 3d ;- PI n .. a r�-. ... . . i,,•yt.T,- wSII! . 1 d =: '- 1 _ . Sealers AA }Filter Notes blanKet 3. L,i is the length of the rip -rap apron. Pipe Outlet to Well-defined Channel 2. d = 1.5 times the maximum . . stone diameter but not less than 6". . 3. to a wah-defined channel ex• tend the apron tip the channel { A A banks to an elevatiD[T ❑ 6" ---- above the maximum tallwater - dep;h or to the top o€the bank, I whichever:s less. . 4, A fi8tes blanke', or hater fabric . should be installed between Plan . the riprap and sail fourldatiorl. , . . . = r~ r :1. .... ter.. -ram "I� �It -� 1 r l f" F ifteC blar,xet figure 6.41t Rlprap outlet prcaecfan {modi:iud IrerrL Wa 5'tYCC.J. I_ ifLalY• that oh•� h,•xd• for i• il• -sat rixas'i,llxrs[ > i •, �Qf15tTEiGtIQEI }. L.0 g, L 1L the f ] vl , d ] p s t }sL rL•yuir d l n4: and T'i&. shn.v'u in Lhc pinr. CentP aciany h31 rcc su 1 uircd ill the b•,,m& 10 the } S eciffcatiofTs dcn,it L L t.1C,urruundin , undislurhod nia[u•ial. Law�amas in the suh�'reJd Lit :t, „ ` 4 L s. it rk et3 .�L it rlrn• aria hC 11EIcs3 h ' 1[1tre53: r31 _ tl lr 3'I ]CAI) Eh IckllrSY. _ 7 8 3 E 2, lhc rilpruf, a1sL1 ssravcl filter uu:Si auL]bnn to tJ1c spccl[iLtiJ f:raL111Lg bouts Shown on line plans. 3. Filler clutlt vvilelt LL eii nw•t net doO_m rc u; anent: and ha r 11 Lrl • 5 s C S rL S t 4 4 Ll P ] - I ' u •s• n ti [ less' Lin ttr,[u rr vl unclriL. 1 harm^duriva•in�;:Jlaliilr, Howirsln car it. by L P r f rcrosrvinp the riprap and },kacing:u,cxhi:r pica offilter clollb 45VCT the damaecd . area. gilt car l•C t' , •1'sit5 : h r il „•rl• sn :• w 1 311' i, oce t 11 L I[ L Joint.' ) L L d t i s [1 L , L[ , ab Ell I P 3 d,11171M WII LL5'ar a Minimum of I Root. If the danmgA� Is C%LcILSisc, rtphkie rho cJuirc Filter cloth. . S. ]t 1prap playhe J1tsced hp ryuipnse ill. but lake care W avoid dtl slag ink 8)c JHWT. 5, 7hc uliuilsium tlii;:krins of dun rn should he 1.7 linos Eric maximmu P P stone diameter. 6. Ho fa play t, • held . to a ,r e•, •ill llirrti• nu. : E , dd b � •, n r t u_ s,u It } x t L hex. P P _ y . ungulai' hI'•lflo' v1cLLtl1cr-resMLa3L[ ailid weal ••r dcd. . L L L 'v •• ' .. L []1 s.Yru CL lhC a %CC ❑ Lill 'l.CCU ' .1,.L. With S1U [ ❑C]'[Ilt :u dx• end. tsL t.l. U 3 _ Iu,ur•hcri rat', E^ rvsn:tr••rn•nE1^v•s,c[1htE• •••ivin„ •' orili,hd• ] p E•[ i 1• do •, u= L c L 1L rvLL 6 arLa t y n. hLIL ... . S. J:3ISLITV IheL t}:c aprsrsl is pn5perly Ulicncd ''ill; the Tc-Cr ,•illg slrcaln - Lind rct'umhl • s[rao gilt tluuu,�oui its len,ih. 1f a cane i- ed t 1 fit : iic ] Y A g g nwLJ s tLill diliolls lkwc. it in tbV. a er SBCtiult kd'OLU cl lrulli. •P PP f 5Y. ilnnlcdi:Ltc[YORCICcmatruciiull,S;: Ili liZell lldib[Ill hod !I]iaswviI]IVcgelation E Iaeticcs t. [i] 7reu•n;raz•5•.Seeclbr'. and G.. ] Nrrrezu,zrzx .SeerlLr' . 6.83 hI, Illl ■e Construction i. Place stone 3- lips I; nes aneE dollVllsiun5 shown in tile plall Lill a illter fabric Specifications f oundatiml. . 2. Keep the• center moilc' Section at ]cal 9 ]nclw,, t, Ao}v natural ',rclujid lcvcL . ' wl«lrc the daln abuts the sham Lrl batiks. . . 14 ,rL•, s'-tit l •• p'•',i1! ' Ip�3 '•L' 3. fiXRdl .0 L.11 va. 1._ 1eL,lLy. c[f.rdi;ih..11h(€l�urzG.83bltukcep . water from cutting around t:le ends ofthc check dare. 4. Set spacing between darns to assure that t1w elevation at the top of the . . lower dani is the sank as the toe cicvanoil aE-the upper dam. . 5. P1i,l"T 111 • clml)mn •l i111ar llle ILisaasl Est k [blow 1iof0 i108ti•'y flow that caul l VausL • •rusinn. . . . G. Make slue that Elie channel reach above the host upstream ciani is stable_ 7. }_msurL't31aL L Uur areas of ihccha nit't_ such as callVcricntranucs bciolVthc .. chock dawns, are no: suhioli to danluipr or hlL ka{;r 1se„n 1153,Iaced stojies. L = Tf.5 distance, Such tl:al points . A and B are Of equal elevatlorl . i A E1 '- ' Figure 6.Saa 3pz, check dare' in ... -.- . -, •-_ -- •tom a chann,:1 so that the crest of downstr©arn eJWji is at orovation of"foe Of us3snearrl Cam. 1.5' *min. 9, min : 1. ti, r: .. n .. •-' . .. Filter Cloth ' . Pion Vhew a r 00 Cross -Section View Figure 6.636 Stuns check da{rl stone sllauld be placed over the cl:aniei oanks to keep water front a t rig aruwld the Jam. Ma3ite12fG2 ELis cc[ checkdamsandchanncIsaticasiwrekl} andafw reaL.lsr_•nlfrantJ[•_r inch or greater) rainfall elent ii,.d re air imntedmVI '. Clear: out sediment l w P . 5iravv, hnibs, or other debris rhat could ::Ii]2, the ChalinVI wholl Heeded. Anlicipmc submcrgenVr k1UNI eEfi,sition ahOvC the Vhrc: r11M and orobiull fiU[ll 3:iell Howl eru«nsE flu cd&!e, idtlw dam- Corracl ,ill dmikll e iinri tdiawly. If significant efosinl: occurs between dams, additional measures can N taken such as. in,Gillils•, a prntcctivr ri; rap liner ill that portion of thv ch:uin7A [Practice 6_3 t, R;prup-licit• au:I Trf:,ed (71amicis)- R,c.suov: wdinLont ticcunlulawd behind she dkirm rla uccdaal ill prcvtm darlta LC todinnnrl v'LL!oation. allo,vthe 011rsilQ; Ili drairo lhrk,43 the szuneCheLk dawn. and plrevenr larL•e flon's Front C33•rv?n 6Cdiin.eix ol'er the dani- Add stonL•e [0 dani5 a5 needa, to maintain i:e,IIl lleik:lt and cross section. spas . • • - . IF ------- —AR I1.1I I I....... _ a 4, fnax 1 19-gunge herclWn^e dotal mesh openings) r,l T Ji r #i _ _ CDC 5 0 57 _ 2' h to washed stone ... ..... .... .................; ........-.. -.. ------- - t I6" S 1 2' NCDOT ill t ered wasshhedd sttoonee Wri ter A - F' 5 Hard -are l Jh n I ml 1 n 1 tare 6$ s cloth and rave e[ protection 99 P w. , w • , • s , • r 1. UnrtL r1.li rests t1 , 11a1h LIL n. sus n a 3 .s tuhlne illy u11c[. Construction . t. F IP _ Specifications 2• [)lire 5-11101 s1"i pns:a? feet into the ground sUticoun&lg the in[e1. S ace posts eve around Eli erinieter ofthe inlet a max hnlun of 4 feet P C P apart. 3 i 1 - . .. Surround du l sail x7L1. vsn n:c:h ]lard .uL cloLli. Sccurc thv ,vire 3 reSlI I [hu steel pasIs m Ihr lup, middle. and hulto w. PIacis I a 2-Brut flap ollllc wki rrkc,h L111L1e1' 11w L•:avcl 1Vr.1n0wrltiv is rees,lnrml rldcEi. 4. Place dean gravel (tie i)() i ,5 nr ]rS7 stone} an a 2! 1 slope va'ilh a height nr 1(r inches around the wire, and smooth w at-. even grade. 5. Once the contributing ,krai: airo =r has bL%-n stabilizes, rc2novc 6.62 I � Construction h9ATERIAL$ I' L'sa a sVnthere filter fahric Lis at leas; 95".'u 1)v '.vet �ht of glnlVnlclills t,r S peGl iCatIQEiS polycster,,vhicli is cenificd by the manufacturer or supplier as cnntin•nling to the requirenients in AI "T:%t 1) 5461, which is shown ;I: pan ul'lable 6.636. S}'Iethetif filter f:Lbric shnul4 contain ultraviolet ray' inliibitors and slabilizas M ])MVLdC a 311LIUM T11 of 6 months ofcxpccted usable conslruczinn life at'a Lem oerlai re range of 0 IV �0" F. 2. hns_Lre that posts for sedlnienl tances are ]..i; Ih'hnesr It st a nlinin:urn lcny_h of 5 feet. hake sure that steel posts have projo lauhlxtc lusicning Elie fahric. 1 • ,rLL, .. I-Lr re3r.filnrnt aJ standard 5lrL:3l6Lli fdtcr fabric 11SC wL."L' fen: n:inhnuin 14gLniecallda,naxinLilnL3n,eshspacingt,f'oinC]Lcs. Table 6.62b Specifications For Sediment Fence Fabric .. .... . .......................................................................................................................... . Temporary Sfit Fence Material Property Requirements Supported' U-Suppwled' I TasL %imofis Units S:Ir ['. : . -11 I:eoce I Gran Strenoth AS7h1 D 4632 N [IDS) I Macn:Lie 0ifeman ............................................... ....................................... 400 55O ........................................_........................ E9D]._.. alto . _ -..__ X-Machine ❑ire:tion 400 3130 ,_Gi [90s Peml'•llimy' AS"hl L, 440E see - 'I C c1b 0 OS Apparel); Opening Sizes ASTM D 476v mm 0.60 0.60 Mt iUS Sieve p3 -------------------------- ------------------------------.....--------------------- ----------------------------------- (30i (30) --------------------------- -------- G ulrraviolei G:anili: f,5'h1 D d3S5 retained y 7 " f 7 :J, - D a, a per 0 , sfter 51+ength 5LX}1, .1 a ;3.! use 600h of exposure --......__........_....._........ ...�..._...............-....._. ...........,--�.j-Ot...._...._....-7.._...............-.............._..,......_ SiI: Fen:.e support snail consist of 1a gage steel ,visa w;tn a mesh spacing of 154 nlnl i6 ii}.^.nus;, Dr prefabrica:nd poylnlar equi•aa:ent strength. ' Tlle5e Vefauit values are baste] on empirical evidence with s variety of sediment For Environmentally sensitive areas. a r e. r oleos w rience andyur sae or re sarla3P s 1.1C ea � i � e e e tzxt le [ells lr p A 9 L' � , ^ � r � � Y T1 � 1C L � r cLC4 JdrLce w•II: Test h � ad Q 5 1 SI sold L'L• e r b• tea a etc to con 111 suiwoi4i! • of these r 1lirements. i 9 r s �4 'As measured m accordance vvith Test fvlethod D,:v"32. CONSTRUCTION .. 1. Construct the sediment harrier of standard strength or extra strcu,,th . ' sy whct;c Ill to tabries. . . . . 2. Ensure that the I1c110L[ of the StLLmcln hive does lwL exceed 24 inches .. . aboac the grouJ:d surailCnCCS eta;• irIL?w L:ns? VVILIIEWS of water sutlic;tnl tUA riUUSC fl;pure, of [hc etnlcillrt'.l . ' 3. Coii s! rILCT [hc h1tCl' fit b]'r(" l'iO3T3 a CO!1Lr1nU:1S J'L1I1 QLE su dsc lrnLth or [hr. harrier to avoid joints. wilcn joirm are iwceSsatt', .Su-,twely' lisslea il, 1111er . cloth only a[ a eupjlo,l pos: ,xiin 4 fccz minirlu ni ovoisp {Li [he lwxt post. . ' . A. SuppLin Standard strength 1;L•cr fahric by wire nie%li fastened securer} to . Ill,' rf J>srnpc side of the ]hlSts. E xtei)8 the [care nw,ll suppwJ7 in the hattanl of . the trencli. Famen the wire rewiforceinenl, then fahric Lin the upslope side of ' talc fence bast. NVire or plastic xip ties should have :1161Mwn1 50 pound U=i Lc . strength. 5. 14'ilrll a u•im mesh s:IppOTE JIMICC is used, Space posts a nlaNhUoIn 01'9 fist . apart. Support peals should ch driven sQQUCcly into ills _rRALnd a nullit17LL111 V1 24 inches. 6. I::xl3'a S[1'cr3L111 6LIWT tilb3'hc lw]L}:6 CtYit POS[ c],athIV,, d0eb 3Lat regUiEV wire niesh support Ccnvx, ticcLmJy ras[ci: the wilier l3t,ric directly lu posts. wire or . prasiil;Ap 6s sriould ha,c minimum 50 pound [c nsilc sllc5l{'111. . . . 8' max stardexd g nth fmo c L,,th u r9m extra srrerc�rh,.i,,,.L wit[wur -- - - g- . ai';r_V V.alai ._...... _- _.. r.T.-..,lr._t!.,...•.,.•.,,••,- ,.. Figum 6.62a I:,slg�ntlon deter! -J.sa a '.1.ner1..i1. The Slicing Method 3 1- 1'�r sP.,,cNG. N _ lV ,rr= . w, ,w" uo-a ' FDsl jY11gA 117 /. / / / / - / //%j��1/ / \ �lti\j� j tj/\\ / / r•, I f \- '♦ \ \ i,\� /// . \•. \ \ /ti, \/�\!\ \ \' \ /'�\// J ; \i �i \/\' / / / J4 / / / \ \ / / / \ / / 1 \/\ / e ` , // j�\ . No mum than 24" ofa 30 fabric is alip—el above ground. m d,I d, : J, . W1-i ATT Cllk1EM Dr.T.VLS' Na • sr 1 r '..ern U VD cq ws S.RI 8'nl rob<z f>4, Sb KT • rnril'ra, Mir' lie die 1 ,IiW hee„I.' . n hnlm .I 1ow l'. • Ken each Ke o I ni ant 1' hlen aB er . pea t - 9 O else eves Lies laors;a eon wee. Rat or 5ii; fare act u i n c 1 a [cd acLJ i i ncni. an d s--.,tahl s] L f i rtal grad ing c 1 c valious. 11.,E i.^.s!Cll� n' ]n,uctr, ra5i.]llc 'i1'L]`iuletiW'CCk]L"ll ilcrss•,ndscaat L_Jn^fix ,rester _ l 1s � a da s r. ., anew { ] 6. CL m act the: area ra per[ •and st:thiliecd it lath •roundcL ace. lillallltei'iar3Ce 3 p} = 11 P P} 7 _ _ c,•,rl.,x::..r, - 3• rsinsall ucv3rt, to sec 3] any �nsusn aruvina „i�brluw i.IL riprap has [rikan pia::••, ........., rut=x: nr ]1 buanes Euvc hcdil dislns!,cv. Inuncdiatcly make all nccdcsi repairs tot.................................. ° :w>=• F r 1 • 511 e lL.e I 'e" C sL�.•� , , / urn ha LLl I[71CI5;1[ Ir;l.[ cLkly and aihv cac11 bis=nific;lea -� Inch Lr rralc€s [,rbvdn[ fitrthcr dnnlagc- Malflt2E"iailce } _ - [ s, �_0(� f g rtialfalL rvcr5l. Clew t3,c nosh wire up'any debris or other oh.jecis io piovi:[e __ c adequalL Finn' for slLb,equenf rains_ take care not rn,[iEni,,V or ur:dercut the TK.,.,;':- ::?(:: - -- :;'^v�.�... wire nxeli Jurint, srdEnlezlt ren7L11•a1. Re place stone as deeded. } 6.20 .. ... ��z• • --r 1). y GDmp.a,Ctep soil 2' j+c min I. -I x'Y-- i,l - hL lC,„kJ t;r bL, S_a,ng Cl�]aL -- n,'.1 I'. I I ,,. r '. "11'.I Cr,rrCA,�IFK� VV 4t 1,',10; . '.`:D:ot - ew, s nc,T cloc,& tome' because pf-rcuoltci CGYn ac IOrl a"J P rf p Fig— 6.62b Sehemal:es fee using Lhe slzmg rrrthod to Inslell a seuur, nl limps Adapted from SA FefK':• Oil WcAs 7. E= cavate a ;renew: approxiislate ly 4 inches wide and 8 inches deep along 1. .;•;"�^''- r-�- - -^- the;rnpilscd1uu,)I posts a:ldup.,lopcfront talcbarrlcriT-u ire6.62a). :a; -:i ;'!' _ ` .':,..- 18'• min_^" 8. Place 1= inches of the label: along the bottnln and side ilr the trench. .:;::. IIII�fIIII • III III —flu Ili - o. €]ackfill the trcn:h willi soil ]aced over 111c filter fabric and compzxl. - i - lli ll rt I E E iilt f^ /��� t IlC,MULh CUrilp:l 11L,1: L!Fthc backfiSl is rit;cal [e, wince IxrfeSrrtlttnec. -- 6, tyr71CaI-••--�••I. ... I0, Do 1 of all ash Il 11oI'rubr is fu cxi8li I;g lrccs. dour- 5.209 Tonoararyoa:thdn dw,,,,s;dn&kn SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD n,tcsd of aaVava[in? a trench, plrt6nn fabric: add ;had ba kfIUing tall}, Coarse aggreeale ,cdinunt fcncc ma} bQ inAalLcd usilig special€y dcsiLjncci cquip,r1QJn that 3a *flax t inserts the fahric into a cut sliced in the ground with a disc (1 1glJ fe 6.82h3. 18' MLiD �y� Installation I. I he? seal c of both end po,1, shou3:.l ;,, at Eea,t Lille• Rsnt higher than the middle of the Finco. Check with a levet il-ileeessar �. E '-` _ Ili = ] Specifications i Install posts 4 rcct apart in CriLiCW areas and b lcct apart on standard _ „� -,Y _ r- �_ Id - w '=iTt- R - I _ i it — II I ..-.�' -�- 11 - applications. 1.��l#tr � ��typlcal �� yp � E I �� 3. fsls[aLl pulls ? ]cc[ uccJp 1,n Shc Llux•3s!rcllns lacier o[ the list levee, and ... L .. 7s catue as possible Io Ih: fabric, L:nahlmg pos[> to supi3int the if3h;ll' 1U317 . .. ... a:1S[TL•tlnl WkIICr l,r[.SslE:d. Figure 5.201s7errsporary ryrzl, ' di'.•gfsien a-lw faa,.•a wll lasrru 44 {morSTlod fr ,m Ya swcr)- . 4. NsialI pi15i5 pith ihr nipple's 1' vine awrlp ti'os11 [ha sir[ ioN ic- 7, Atlaeh thz fabric :tI @aeh 4s[ with [hrut t;,:g, all 5,aCC'{d w•rihill the [u & CoilSttuctEQ�l 1- H;l:wvc a:d Aril}rcrEv d�pss put rill rrCes;. f.uats, tutaps, turf vihts nthes:,rthrra1),ic. IL[tachcal ill;e 3iaslunail} 3Sdc rerslhrnugbthc [;7bfC, Specifications with each pulcture nt lean I inch vertically apart. Alin, each tie,iould he .. EmloV lhlll (he mirrimUll) VIJIMMVIed eels 'section ❑stets tell dv.wgn pumtioncd to hs;ir on s pos nipiskc- :.;ter ti 1_31-ned to 3,rcVert a;�in . requircmenis. 6. 14'3'ap approximately 6 :fiches of fabric around tile• rni posts and secure ,1'ith.i lies. 3. ELS511fG' tiler lair lopPl r11,^ di3:e 15 11P1 iCrIC4r 3[ ;lea• j59111[ Shan Ilic 41Cti1$n dtVML0l; PILLS lhd specified S'.01MICILI. . . 7. No inoie [hall 14 irches of a 36 huh lh:3 bric is allowr,ldbovc ground I evc 1. 4. NOV idL• su 01u; w311 lQuIll 11:01ltlP di vVxs was ti, pe rani t 17mdiilli• r.L•tifai',i rig and ck:enuaL, S. -F}sc iussLltlativn should bL: chct•kcd anti rorrcc[,tt loran; afcviations hr[orc cumpac[icon. S. V'cu¢[g1c III,:ndL ;,G inuliod-ll C3 .4J es q, in5l:kpiiPi:,.utllC] it l%0I fc1iwiIl 1,11 V, Compaction is 9i[.YIiY Jrlipul'tant FuT cffimivc results. CLanp ici lllt soil giaac less that, 14 WlL rkiJ[z Jrq's. irnjncJiLltdl ,cal tEl the sill Pence fabric wth [hc front u-ke1 of the via JLIr, ,kid s{ter. or rolls`r I,.wtiine_ at JErlst 60 poullds ptl square inch. compact free MalfiteilBrtCB I[:sJ1L'e.'i LS"1_]}p[Ir3r)'diversions U[3CCaw1'aef::Jfid :ti tC3'L'1'Zij'ra:Jlf 1L. Enimsxlia:c ly cpa[reant side timl.;old dacn earth m4,E twvite far;s heal Of4 trip,. fejnokY sudimen[ ILI-um ENO slow w,---: and ftpair lhrdivctsiuu rkig.e. Carcfu'ly eh"olnl,Z;UiJ ov.ikC tlrmti:' SCplulss aS JICCJcJ- ll'15C?1 rho afie4-;vuleCILM is Maintenance hisp— sedi-ant lcnce5 at [cast []lice a lviz& and aflereach 3snifall. "AAcany Nruiancntly a3bi3;lcd, reo:un- r}LU ridL,C• and the charillL'l to hlcnu ,with the rcyuirod repairs on Diediawly. llalurlp VIOLIL5d ]rvcp aJtd spllrt3}rrku:eA M.IJh31ii.,: it. - - l s Location: 64 f . . .. hem Asswrioly . .. . ' 'C• Enclosure . ■. PERSPECUVE.VIEW. . -tVnentry Pi'C E,¢ PVC L[t,Gw PVC v`cnt rs[hc` slat ,cL' d \ P1Pc , Fv-Pipe Y : _ schenuie 4, r . av[ YcC PVC Pine- P'JC P,px � PVC Tcc ,, kimg i, . G,ii'c . . u„d1rs,Jc FLcx �EcPFate 14it L t a . END VIEW FkQNT VIEW Figuto 6.1i4n S:Jwntim w a :x:nunal, l=t F t?r:ii,,y?iiklJld F:rsl5:on ano S6o:rem PazLwion CoflsoF 1Asn Iu4!, . . r,=a I_:(*[). . Plug Yaw I'I I'' Itl . Ir,Aosv { . 5•rUel lfrat I .� c :.�i{ ,. , ,t. ,tLu art}'% . ]�;. r.: I}�.i',/� ;ti i ., tie' i•] a : ti3 >31;j::i )tSig'� sy, Ltl -.- i• ;; ; r6.1�:A r T. >.. }_ ,:' ' r; . 5 1 „s �� •,r i ,/I ;r : ,j, ''f. V" 1f �, 1 i r r::3 Ass :% . `'r,• l ! ?'^> %, ids 4 . E:tLarc,•ar,e7' . .. spilfxcy 2; ;; 3 . .. ?r44f bwir--:-,'t,wo 4:C O, :off". top °i 1 ixeiPC SFilleny o,i�,:lr i7h .. i' Free rd Frnbdeknent YnfSaw Bai`i3cs / sir-JC::I!'� E .. • .. I I$ :':: : •�S' :D`5:(( 'r)' ''Gi}•. 1s,,�.+nyerr sc"...on of v'•L 1 Fi] cr to rip s .jj •� 5e4irten3 Cross-SCetign . slave3 z: xer .e View rigwri 6.EAi Lpcerl:plu Of a rw6:nnal bairn vvitri a skirnnlor ca-'t'rl afl� r:fiicc ,cncy 4F,1i5,•ap'.. Frame Por:1:s�[Y4 n a. Cfosior%a ie" rS oifrk-fil 51o]lu;lUfl C, Nntf(A malnaaL. lzwch• 2D17d. .. Construction 1. i lraLr.-,f,h, m)J a:rip, k,t:ucA 5k+,i lllc cl::?w,};5;!er:la,r Nil ley 1ti1,41:LLJ : ;MILL. RV4114 a a43 s 1 fa v 11 � „ia'l; nns I,i: l aum Lu::s urn: ,a .c ne3-- ... Y. s +, S 2C31lCEI Of15 . and s:. cis Ake L; di»ale of iL r,, mri•:. 1iaul al. v.._uc sable nsa:mial la the P P i ] J pI411:v JiSpug:LE T,ci,. i'I'.IW cell:J> eel-' $VLLE�LLIrLLI CPILIW] 411V• x4:ca tr,J: '-;EL ups needed . _'. Llliurd 1h3: till :=Lelial Ji11 n;c ulnbe:aknlrn: is Jiz of rains, -Lx ty . ,v=,vw;wjA , Lila, :Ew eraser, :old ahrl ul:j til'-,abh rnn[criaL. p?:,vv, il[v fill ill . liils.J1JLI,i C%Ccdu9il\ILL•g,dlldE rLaC[:i[iLfti ]llpa:til. Ovcsfd[El:c:nlbaal:nirii; B indws :., also,:' w, ,ap{l?er mn- 1 S::7frc.•:!,. bcSih LP J1,,!,pcd if:,i J iaw'm,,:u. Irrc, 15 hr a km, hlin_:, s• a ic, . fruit sc{ L3; w, is Lo thv JUW by 0xcL,va1i11g z s11ai1ow� In l 4u'r&F flit 5hil r:mcr "r . or P: ;;,+f,ig a 14.:v xupJSdrl u:oJrr :I"- 61.%PI:li" L,E Y,,.in • �r Iiln bcs. . 4, lllaw 1h_ I%m d l L}Jli�tiny 4-inch 5.ILL,duJ: 4 d 3, VC11 ip•'],ln a firm,--ii.h . 16 tllzJd!i-0A o' Elupclv[au, SO:J. Lk, ]uL L•SL1 ,,milers nlyJ_rial sLwI as s:r.!d, . tarsa[, 11 c:rs]:c41 =,,:n• 415 115a:[1ll :„r1lslLcS U,_• pilx•. purr d:c Jii! nia:c:Ejll afo«LLO the pipe s[,il!s,•ay in 4-kach saye,s a,ici vuntpaci k: und_f am-L xruu,sd . the pips t„ al LVIIJ tiw- . u,, 4r:;,ii)' u, d,r a,tj, Vr 1; e=a3,:::Lka1_s, L-W V a,css ,. 1'k- , :t 1:1 :' kr :a • c t1033 tLl • - 1.1a - } ur l'•,i•r xL: • . tL wall k J. 4 p:f, 1 fir rrV G'L, Cl 1'1111 7!5 fV e4 ,...fA LIl .cul,par[inr. umakr Jh.• pim h,: :orris, . Phs'c a IILBIi IIIL,repolf•:i, L,s: [cc[af rn;npzvLr4tjlx'Mill uvcr ills],ipc+iI,]I, ,:L aerUz• G10J 5lllE it wit;, r o9sLrLL:fi;J„ cqu;pn LL•rIL, [1, 310 r:.•ac wwatc Fbe Pip: � . .p:4LJI be _ia L::FI,d by CWAII1; A L[T[a'[L Ihruvbh du: dad: tired IL•sc cJLLLv nluurnJ . . . is 0"91RIrIa. . $. A,s Vniolc 4;W .+},hnll:cr fn230v,';ng ills nr«LLufp_-I rFVn Ensooucria:;s, vrr as dcSkylcd. . ' . 6. [.sly [?se wont],]:d %$irrllll ex u¢ iH: Itonon of [hc 11,44 a %vitpt 111a I1cxil,lr . j,]iltt al U:c inter o lh. ham,J 3,;N. ?sul L:4 L.I.r?:03. r m,'EV J m Io iver. pip, . anti heal Lwil tht• ski,n::1r•.:Lvn LL: rs ,Evaled [sk:All s jyl t :- 33r suer IL.:in;rlL . . . . a ro,>- in :doe si.iaunet ant: an, kv r1 is [he side of :he.E,asiJ;.'O? s kill be vi d . ,,,1L Ike sLilail- o lf,e side f°JLM; LLLr:u, ref_ Lars L - 7, I'.];r911c:; ;pil[wiip;'•-'L11ctx?1 ihr sp kwily ill 04%&axb:d a4s:, w 05L- glvatw,l . - .err •nss,bl • I1Lr a 11J s _LLL us „Lscaled d1 > 11• Ln des, •a mddl ' J gas 4 .Lid Vniu,ince dnJ c-Y.1 Lls:.nc'eno w• ury cell a xE r„ LIIe •.c.v:5NULI ¢ s.n. bl [ s .f ]hr sm:',,.n Ih; 5p• a'. s•w, .M 1> Lrm vs ith ]xnin,gt astir or J P Lnl ,i: Lrl i�J • r, LenL::e Sa1,•:i. '171C i.,l,f,• s: LLB ,1;d, _Ll i _L:n ' • ] .: 1, to ' } [• v ,Lilo c ,Lis, ., .,-' .. u 5 u hsc Es11I un ,lei= giJs•5 anJ •%irs:d unl„ d[r ur : t f ill: Baru [i,[ a:lifk,rn ' t. I d, n ate lvh Ih: cdec} ill_ n4 s[cwL4- wifn. ¢,Lvh lL. o ...a .z 1�ric P . MIN n 3„n • rnau•'h us n!dnd cio n 1hr s 17 a Willi cxu .+..0 s,alslr :•eui'::J. . . ,l ]Ile Wicilh a: fl ' J'aaric Joust tt' ale ,;ice 0illid LV S need' CiiiCflv'isd 1 L1JL J P . L Lrf,,r•'r L,•-:,,d„ , -. Ail• r«ln .an ••d crs..0 t L a. .v ] . l_i 4 f i! c' laiai: is as W?Iciwn' [o Ic :nits_ Ian :h of die S•!Mkls ' ,rusti x . . s s krl:urs„ lac dean ,l_:r x'idns sL'C'i:,-t , S s 7, 3, f l L. .! . 111iR' :: ktcd, nc� LLpES Y a t'l:,,Al:. • •u..io 0 "crl ar h, ' c+ , aviu::t>'j s4 v tt•t •r •' •• ',: :}• 1 • t •r f� ark : ti -er . Jh LL , d v . . . ,f1,1 , Iv s,1..nv ila L ],s s ,.r f h 4 . . sou r , c , r r;l •c anal , Jcs fi" S „ >. 01 l[:a fat• le in a acsch ilLL S, LCS OJ' :CIS. �AJ..cd 1[i,r]] `.1 . i_aua lur [ s I P 14 i 1. N d;. 3. -„- .. 17s•Si'•::III'..I1�tL4]IIl'•:lllsl .'J,Li::::Ri[:i::, .�}.i:::Ere ti L,llilllC it 1551'a" 1'LI1 par' n ,, r. yS. Sr... 1 papal. ...5 S, l 3 =rcls lh d: Son:J- 8.]ei[tLs,-L)ix,]m.•,}�.L[riLLLG[L.L.Sin;7aL;CILLae:tL. :d Vesll Civsiwl. L'sr 1 L 1 p illll.st.t ll, hsprai:lfsr Gl4'llxlt]Ia +lhilu:k3 101sti{i4V1Wui1'li[1hlilklfll• I k i L,L- -Leif, 1• up :lJu'' c• [n asr,r'�� jn 1•• ,•- is m,' 11 lVa c E.t LS c. 1.11L 'ill:i A ll ,] 1,.x .a .sJ tSL.L. .. 41Lcf i'rc.udl`>f iiurr f7 i:,uf:f u:.4 4'oa n, e.y L„]:i {)drf.',11, r,.ra Yhai i. 9. 31—;on ei AR,l---Clea+inn•E 11W M:LLGIarC parr t3:a; ell: di5lkrhCti arVa iF , [LLitlinliLL'd. L.4 L..... zJ;7]:'G 1}I[s': .:4v'a}' IrUL:t i> i1: t• .1[eu. tiJ[il'lEL'LV f.RV uhl rn,vl:,eel 1 L141L• [Etc .4 c.l is clra::ed. 1Ls E?[r [E:C c,nClfssx'} ,I 1L Lx' i. sL IF a E, • di i''•h a • u uv' ; -err of 'e -i a' crl >-.'l�lnc:l[ aJ J l yr a �.. LL V., b r. [.t. al ll, rl.riv 1l 3 f Spillw2,v Ilu)lcJi:lwl}• sItcl tL%lts?UI:lisdl.l3;cicl-k; vc : S,.a7%2G1',%eNli:'Wi,m+ . . 10. 11r}La11 ;m ,us [,silks :,,c 1rLf LNI Lu PEII 3 I ('("', lh.+:x ,';, rjlr E ,a t - ,] lL'r .^., life SCd„];Cs1;- `1 ili:�.'LI] • ,^.. :f �L• Lein [%]:1:Lli•113 V' S: t•L.,I.0 I I 1 a f b ' r h• s '[ '].L•.c-J:r•••r: SULL'1•' . r ,µaLL r ..11 a:'l'.-rr and a 1 il:a L.cyla ...4 >, ,.I Jhr arcs W .-I •ud "a ilr • 'K ,m 1 : , sv - .. r v h L ,w L.a,In .rL•�s sld x:nhilirs: ,ru c3 kscfrn•JS L•g: .Sre-6x-e ] ] Si:ri:i:i:trli:ro7 . 3Jlb ZI s},inuntt a,�linwnl bas?r1z 4Ll LC'ail 1}'l'l'}.:}' ti:1 ;:11 Cf L'a:.h tit"ll ll:,:alLl Maintenance k n (,m, EuIJ-- Lth •;H.) rams, _ :• z '• Ld era;: -Lilo--' `la!v. •„rn... . ur • G� , .r 1 l aJla K.L c l 1 p scd 11 -. .Lug. ,,:{w: ill, basis, LLl Lis iva 11.. L,1..utsaoa. Ill , 11 ,rd::n 11 .,, ..ce;n:ulrin to one na r ,..c ha:,hL o- Lhc LIT:: bz]re. Pull the saJ::dixr to .IV lid- so n•:,: dr.. • IiI«rnl a:a&-edLn h •Jo v' Led. 1'.•• Ic dLV .. scdimear torn: s:w tnlow iasillna' [ Ll9[ Ull'W J IILr 5`;nurc: a n:first celt. N - .. ts}.r au: c st 'a:�li4u1 •' not, iu it 1E5:: tr;IuuJa 4 ! ifw k�sis: ;!ar•i vial 11s;A Ja -a the stEs:sls.tr. - it d,: harll,.s if Ihe,' a J,,411" d. 3c•aluho, :hc EraElks if task•: is ~oral ilinung ur;icmca;h o: ar,%nG:L l4cin. f h, ak-nWl as ,-i. ul4'ti u will r,.ab .Lid warn ,a at ace i:: the :e, u. v v ;akkuit err LILc rgn' u;IL in,lkc the s1 iiILIPr r b:1h up;md delwn :old 4[ [udg:: dLd doicis and zrsaue flutq, Ifthis due 3:,1[ 11 Uk, J,aII lhe. skinllnef OtV1 [0 . ... . . �: of l?:r i,asin cuJ Ad:adnr Lhr Cr[u i;, Alw cLud.:J;c iri;i:L• ErUidc [?:r .,,,,,...erto srr [f it 3s,aujL,� • VJ; iC.1 [rrLhrrc Ii:e &II:'s. . . ]: th C 13,i:n:i:cr urns or barn•] }»pc is :;oggal, i Il: wifiec vNi. bs. wm"LtJ w),[ siic I'L15MMt 14:11 VkJA 1611'I LL a 41J-�I Lbef'S,:pike of by' J1 uiE, i rig IRLL 11=,. llc .. gi+rc lvld : cpl ice lhv o: EJ is e lie G,:c I G§,s;l i;ninsg ;hc .,I, ins rer. [-hwS} Ec 11w row) lintt: spiiF•vrn' fish c:,alagr and lnmkr tiny in;,:Dn? Lvf>ml, ' . .... . ailh fabric dui liars *sae full Wi'dlh ;Is EJ,c sp;Jiaay. t 7] xi. [Ere e::3bsrlkn,za[, sp;llarips, an4i f;:lliel lit: a0S10i; dacae c, =11 wasp., 1rr.- Lsa,.lanlolx•J,: spar pipinv;Lns uLLIal%vt)t- Aiskca'.i ncrasa:y repairs ilnrcdizldy..I?L:mlvcaI4 .:aih _L:J c dru wa[ a ir,rm [nc Li.:::asrra LL.. Lx E ;,Ara,. V •] .. 4• }ncr.1n s- .J.f t:m msu., m 1vc ana::r1 :n life below. SL mr s,e-lal L •, L 1' E,rn; uflons sIloWJ 1k [.,.,n u. [Err w;n:rr 1n prrcenl : s,k;nuner iron: [:IL1t_:riS uilh lee. OVERLAP WOVEN FILTER FABRIC 4' c/c MAINTENANCE NOTES: 1. ROCK WEIRS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE WEIR. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE ROCK WEIR IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED 6.5S . � 1(;= .. . ,7 S��i':L }� lrr ), 1,1W u . e J �,,r> j}firs. r i.. . .. S ,,�ilj FLUVM S-66a Pr-6tr4S batr41:1 a Sad,'] .:5::'-=n. T:>e il" ig di5tlbJ5ad1 ovoilly Acs0.L5 tlx, ,will w 1 L•du:C .. ltu'rf latas and t4abu knee, r, uz.j lg is G2;er sb�irnea ret,Mtm, Da11Ed3 neti,J w be vistal12d ciki Belly ir: oralrf 5LIJIY P41,idL, u,L211 ii•]ICJRS. ,I ]tdl-r ;a 35yurt 4,t,Sa:111r: ll W f,..4svir.Lg i:cy pain h: . E ll,• EN. nlr rriaLer ial ,:L•cLIS :,, it s, s1 s a.3 s T well a du 31n;3;•r1I r t „v1:5 1,,tln b , .- n a,,. 3n 4 r b: 1 refrn.3si,^^.: as :: r , s ill : r11::. Li . -�.• ' :LEDs: :][ L1[;Liru:3 wv,f] vCCL11lu.11c• :I` ,!w lira: ,t!'. �L, ;ins ssuuls be r ,J i!_ :r4'ra'iAVt,n' El,:411;111,14•3,,,==«. 5'L*port rope Support P*LT. ro wore so pre- 24'mia �,otiom Stake to stipporl Yel1r sogying or side wire' 1 .f 11 Ca" mesh o: din ilcr, ste,pled :r 1,rn fled into bai'c,a ar side FJpure 8.65E Cross-sea0r; a a pamus baffle in a sediment basin. Note lira; j,Lre ss no vier because the ware: Moir tlr�-Qli vie Lafile nlatblial. --- r , c., 1 ;:•. • • c, •4 llvuF /, F•r _. i ... , , .' '. i t( j ,•. � h 1 r, I � VV a I' ,I • r ,t I r- t n5 a a" _ R y. co1lr,. r.•L,ss •�:} t,de, 'rcr,c el. i i" �P� ���li�i 3:-cr sxr�r,:cxs :.uu will' �.L :�5; ; I . . r r '•'. ti . ::, .L3 zr a . 6: :�J7:. r<a 1. _ rs —tr -. . y .. _n ._t S�`f:G6 GffG a:; .t - ac ... e f. : or ,y,Hn(4 -0 f ml LtE5_ C-::e 'I,ur• ,f4ti .;,Hiy'r;,1:. Si. }La'h'r1 NIl: AI,La C.L,1 I..,:.�'f, XL ,I,,::, f ,i.-,L.:I,M+I°n:.i!. "1"!t� :rr' r •' c 3a .. 4 .. ] 1 V .0 L j J f t 7- v i�l 5 s, l a .0 1. 1,. L1 !:[I., iConstruction 1.St arc 11 kEU1i:1N LE:SL lrK iiNlti':71 J.: 4 CJ 14411] W t%:: k :Uld lisElIN aldC. .. . . v$pVC:frjGptjQn 2' 131YtJll pttntti„r GPv ilWSeb LIVA6511W Wiv ,th Of she :•dillrenl trap [l'lacliu 1 .'I _ .i'„ ... 'Le ]tall 111a 1 o � i••"-' ti s' •d a,l: 'i . J S L ] al lt• LL v.,. i 7 lLt a ctcgl., ..Gl.-a, . {: .L u,.,.slun: .. i r � L .. . rSd fir: a ,ua u. eta ct- all d,- si L,1 Ll ,L. - IvIpL r lu .. i J L. u. Il L } 1 -kusin• kh pof is .. . . ..,If _ '.5.. .. d'sofk lath t1:0;;WhGs it arils l ban l by i nrvn L,l...s.,;[kua ilia >;o ftI.Jllts .1 1 L I I.. :V-1 ssicllcs L 1f S11:1i: 311:':4,p J: 111V:>; l'llll. .4. Insult[ u: leas[ ['•tree rattyf oIuMCS F.d%V 111L_ 1I11c[ a;rJ ULA;j d;s.haJ};c „ r, h . 1..' v ,1 ,., •,, F zus!.Easlnsl:zJ•;ir._tJrclin::a_L.nla a>:_[,.tl.-�. .. . ..,. %V11CL1 u ML , ]nuts. aCd n nupJ><vs ,ri,aur a,, e argosy 1La+tops ar the n:rax::e . 1l".: , - L1n1•r•L 1''••ulo k+au>• by-ui n ... . 4 r.3 JQ.:a v 4, Lk-3 vd 1.lala44 c•':r a:s.`,u5••u .. .[!:r 1:y, aLu•. }3:Lln:ne, rch:u iuW IJ,c lard,,,:_• Icts 3LJ :esn•E1 us3ct;. TI Iv f_lsnr .. Si;pulGhavenV� l,,L•.'af>,:cV;aupcnirr_: i,1 lM1: weave., Am., Jar,;;c.Eo xrep: . . .. I::Lei n $1:P}1}e1 Stu aLLla V. n-ill, tip, rasa, pjfC, L:r-s]aI, Cgs . r'L, ., -'I... ..t .rss .,.a. a 7. .ss.LLo:a ::I Lc sivt s ., rilic tab: it s.111a,t< a Lint hill... i n a :, L':s:4 ur ,;nun- . s »'1.F5 k-;:xF: "QV Li,FL can:af ,:soar - sitpJ_�. :)b a pin" its-• i--b: i • iwr us- • •Ln• i ,, '•-,psi • ]as ill. lx l :J ..vL , v. . s G 1111 + ul J:,tue .v z ,III. MidrfltenaTICC F,upec3 a ilk's a[ Jean: , nee a Iveol, and ailur en. ll:aiufall. Atck,: Qy re:Ju;rn°- . ......... ..........' rVl3airsilnnwdE;4cJy'. . ;3c nuL_ h, meansLin ;L.rrss Lo d le t.-Li11 s. sl-LIJ I[, lid,:'ic Lri a Iia6 `,V`f.vllaprae. , . . rear, Ceca,n4-ase.:,: Lvn,N o i:irflecnve, JL•P lun it prampsly. . Rt o'e.§voiuunl dcpa,ils ,stave, it r:HJlrs h;s3f ail i sa }3;rri:i: isjci(Lctu .St,Ini Li • 1111 OLc fill the Ll"l min Auld W J 10— 1v:L t,I ::c ,eu 115: 111:1h15. 'Can; L'2re 19 LviW. dnllld(;IL.'t; 1110 b, fl .s Jul:.^.L- Clealldal. Sedl I'm dc5,[h SJLa1:13 . LLe� , df r�esc.. ruts Lls ilt• .,••S:d SLL: a•,e Ja,Fll. 51 Jdla[pre L.L,.7JI❑!'Ln_ Jiaura .nmal 11-'S IVCcs ux 1 a[1t Snl<,.,n6 rclasib all tl; ft• 1::aLe:i311 a:xi Ld—[1:e kdu:,pvt,ipE"w,. icing sJl= lava,:, (;,ad:•, ;n:d S[lorLl:. t}3C ratans nl 'a 5e nncnt fcncc wl,apsc, [vac dCcoltiposc or btcuRlr Enrllccl;vc, 17CP13c0 it jK01IL]1[I;'. Rt:lnwtc 5cdElrl m dcposils a3 nLa7cssm, ILL pravids' adequil[c sw:agc volum,: T1r the Lies( rain and to 1'eduLL: , re39Ur,• oa ;he fence- €ake tale' to il,'uid L,lidcrnlini,i_• thL> fence dur;ni,, cleannut. Remove all fi�ncing n:alcriaN and anstallle ,edimcnt depnsits and bring the area zo grade an3 stabilize it after she cantnbating dfaidage area ha, her_':1 ......... I ....,.,I,il;..,.! PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: NORTH AMERICAN GREEN OVERLAP STEEL POST 3' MIN. ,I r/ . t t 2" r>, 8„ • HARDWARE CLOTH SHOULD TIE INTO THE STEEL POSTS. • IT IS NOT BE NECESSARY TO INCLUDE STONE DOWNSTREAM OF THE HARDWARE CLOTH TEMPORARY ROCK WEIR STRAW WATTLE INSTALLATION GUIDE Q 1 in 9" 22.9 cm .- 1-wit J DIAGRAM A 3' (0. 91m) CENTER MINIMUM > 11 TYPICAL WATTLE SPACING s' BASED ON SLOPE GRADIENT - z1— 1o' E 1 N +t, ILL- (_ IN)I u 20'-.I.-- - I��.,� s� a I I I g" 1 _ - .------- I, = 1- - J < s:1 = I --. --. III III— I l Ir 50' —9" 22.. cm _ir 11 I � . -'� I—III=1 I I- I - T ... ... 1. BEGIN AT THE LOCATION WHERE THE WATTLE IS TO BE INSTALLED BY EXCAVATING A 2-3" 5-7.5 CM DEEP X 9" 22.9 CM WIDE ( ) ( ) TRENCH ALONG THE CONTOUR OF THE SLOPE. EXCAVATED SOIL SHOULD BE PLACED UPSLOPE FROM THE ANCHOR TRENCH. 1. PLACE THE WATTLE IN THE TRENCH SO THAT IT CONTOURS TO THE SOIL SURFACE. COMPACT SOIL FROM THE EXCAVATED TRENCH AGAINST THE WATTLE ON THE UPHILL SIDE. ADJACENT WATTLES SHOULD TIGHTLY ABUT. 3. SECURE THE WATTLE WITH 18-24" (45.7-61 CM) STAKES EVERY 3-4' (0.9 -1.2 M) AND WITH A STAKE ON EACH END. STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE LEAVING AT LEAST 2-3" CM 5-7.5 OF STAKE EXTENDING ABOVE THE ( ) WATTLE. STAKES SHOULD BE DRIVEN PERPENDICULAR TO THE SLOPE FACE. North American Green Straw Wattles are a Best Management Practice BMP that offers an effective and 9 ( ) economical alternative to silt fence and straw bales for sediment control and storm water runoff. Guidelines are provided to assist in design, installation and structure spacing. The guidelines may require P 99 Y 9 modification due to variation in soil type, rainfall intensity or duration, and amount of runoff affecting the application site. To maximize sediment containment with the Straw Wattle lace the initial structure of the to crest of the slope . P P/ e P if significant runoff is expected from above. If no runoff from above is expected, the initial Straw Wattle can be 9 P P installed at the appropriate distance downhill from the top/crest of the slope. The final structure should be installed at or just beyond the bottom toe of the slope. Wattles should be installed perpendicular to the primary Y / P P P P Y direction of overland flow. Straw Wattles are a temporary sediment control device and are not intended to replace rolled erosion control P Y P products RECPs or hydraulic erosion control products HECPs . If vegetation is desired for permanent erosion P ( ) Y P ( ) 9 control, North American Green recommends that RECPs or HECPs be used to provide effective immediate erosion control until vegetation is established. Straw Wattles may be used in conjunction with blankets, mats, and mulches as supplemental sediment and runoff control for these applications. Like all sediment control devices, the effectiveness of the Straw Wattle is . dependent on storage capacity. P 9 P Y 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 1-800-772-2040 TOLL FREE 812-867-6632 www.nagreen.com PHASE /// EROS/OA/ CONTROL LOTS ABOVE ROAD GRADE — 12'X20' STABILIZED CONST. ENT. FOR EACH LOT REFER TO DETAIL 6.06 TEMP. SILT FENCE PER DETAIL 6.62 y — LOTS BELOW ROAD GRADE ADD/T/ON.4L SIX T FENCE FOI? USE PUKING HOUSE AZACEAIEA/T NOT TO SCALE SEE GENERAL NOTES Approved: Date of Issue: HARDWARE CLOTH #5 WASHED STONE ON UPSLOPE SIDE OF WEIR R SKIRT 6" MINIMUM STD. NO. 00.00 z a 111111111111111111 0 O U c • H I:�. M17r c AA"000 � ^ CC tI--O cij W =_ I W J'•� r n=�U N O - �" M `O ' M •~ — r14 am-' ,Sy � r. r.V 0 0 Uz �� � _� � ° *� LU .>-W A "' CA uocu 3:0 1Z o � CD �c U `t O �� a ,O-I W4 111 6jY7 V �-4 I\ �_4 T_ 000 O N O � � ,Lnz U X LLJ 00 _j n (I^yI�� �0.-� I4 I t I _j ^� > %\ T O Vn 6L^aLJ O _ � rn O/ Ld 0 Q Ld 0W 0- 0 V L En7 0 • F, L^4 N i-4 E-4 M (� T �� Wow 0­4 C 0­4 W O O� iQ 1� w = ■NT � • ■ V1 O t�l O I O J (=)P= Q) O ^ ` �7% W F� = OT V 1� Z w 0­4 I'-4 O l/ ���• W r L^4 1� /�\J V L 1^ U'^) V ,L ^ l OT� W V 1 w �`", O P4 NN Fi1"1 P�y O W \*% �\ : - _f _ i t i i ; . V `. , gaga , ,//yla11110 �AA REVISIONS BY Date: 12/03/20 Scale: AS SHOWN Drawn: CLF Checked: DLM Project: 2021 —01 —08 Job: Sheet EC-4 of 4 Sheets GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. Location: EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SANDBAGS (TYP.) OR STAPLES 10 MIL 1:1 PLASTIC SANDBAGS TYP. SILT FENCE SIDE SLOPE LINING (TYP.) OR STAPLES (TYP.) O Z X HIGH COHESIVE & LOW FILTRATION SOIL BERM CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES: WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75 % OF THE STRUCTURES CAPACITY. PLAN &CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE 10, MIN 10 MIL PLASTIC LINING 1:1 SIDE SLOPE (TYP.) O Z X Q M gasg i �} I (- SECTION B-B 8 SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT PLAN SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75 % OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. &CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: EFFECTIVE: 04/01/19 Approved: Date of Issue: Z \/ o U �W �--4U Z ^� 0 0 V1 0W oc �;00 A Q OC �4 o O � U O O .1 ,Sy V � 0 N o Ln Ln � LO �� x LL J Oo �0_Jr,-) gym_^ �o �0 o ���0) � Ld w 0 Ow c� a o I -I GA Q O � WOQ� �O � w oQE�� o � a � REVISIONS BY Date: 12/03/20 Scale: 1 1=-30 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet NCGOt-t of 1 Sheets UM93911 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect. (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days land this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event } 1.0 inch in properly, 24 hours S. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per I. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event a 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site:. 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event 5 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands ❑nsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. ---------------------------------------------------------------------------------------------------------------------- (b) A phase of grading has been completed. (c) Ground cover is located and installed in accordance with the approved E&SC plan. (d) The maintenance and repair requirements for all E&SC measures have been performed. (e) Corrective actions have been taken to E&SC measures, Documentation Requirements Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. --------------------------------------------------------------------------------------------------------------------------------------------------------------- Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. Complete, date and sign an inspection report. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: Location: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting T1 mefra mes (After Discovery) a nd Other Requirements (a) Visible sedirnent a Within 24 hours, an oral or electronic notification_ deposition in a .0 Within 7rafendarduys, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may wa ive the requirement for a written report on a case -by -case basis. e If the stream is na rued o n the NC- 303(d) list, a 5 impaired for -sediment- related causes, the permittee may be required to perform additional monitor) ng, inspections or apply more stringent practices 1f staff determine that additional requirements are needed to assUre compliance with the federal or state impaired -graters cored itior)s, (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, tirne, nature, volume -and hazardous location of the spill or release_ substances per Item 1(b)-(c) above (c) Anticipated • A report at least tern days before the date of the bypass, if possible. bypasses (40CFR The report shall include an evaluation of the anticipated quality and 122,41(m)(3)] effect of the bypass. (d) Unanticipated Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)) quality and effect of the bypass. (e) Noncompliance Within 24 hours, an oral or electronic notification. with the conditions # Within 7 calendar days, a report that contains a description of the of th15 perm It that noncompliance, and Ft5 causes; the period of rloncorripllance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment [4Q contin ue; a nd steps taken or plan reed to red uce, el im irate, a rid CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6), 0 Division Staff may waive the requirement for a written -report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: EFFECTIVE: 04/01/19 Approved: Date of Issue: Z \/ o U �o 4U �t � o�.� 0 0 UZ �� W A Q ;00 r- �o� o `O 0 a 000 ^ O 0 N LO � U �Loz �� X Lv 00 H O _J rr) gym_^ U O 0 0 V L 0) � O� o w O � Ow o' o_ cti a o E-1 O W �Qwo 1.4 1+1C/D Q O O � WOQ� O CU oQE�� a REVISIONS BY Date: 12/03/20 Scale: 1 , -30 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet NCGOt-2 of 2 Sheets D FES 1 STA 0+00.00 _ IM: 776.42 I UT: 773.22 (FES 2) IB- RCP 77 0 0 �n Q� 760 r y 7� 160 1 0+00 1+00 FESI-FES2 PROFILE M FES 2 STA 0+85.43 RIM: 771.36 INV IN: 769.66 (FES 1) 00 r. 760 Ln o N .. ro v W M 00 .W.. O fN Ln O `i 00 000 " 00, \ .. 0 O 24" RCP \ 24" RCP \ 24" RCP 760 75 0 1 O E LLJ O� U) 740 0 740 00 �tD 7) o0 Ln ^ ^ Q 0+00 1+00 2+00 Lot 17-18 PROFILE 3+00 LQ n 790 790 00 m ^C1.0 (yj .q Ln .. + 78 D u- Ln 0� z 780 770 770 \ 00 \� m Ti �\ \ oM \\ ^ 06 Ln Lr) \ cn Q > \ U- 0n 760 \\ 760 1138 STA 1+44.43 \ RIM: 765.91 \ INV IN: 759.00 (FES 7) INV OUT: 755.49 (FES 9) \ \ 24" RCP 750 Co N al N N O 00 0+00 1+00 2+00 Wilharr Ct. PROFILE STRUCTURE TABLE STRUCTURE NAME: DETAILS: PIPES OUT FES 1 RIM = 776.42 85' OF 18" RCP @ 4.17% INV OUT = 773.22 FES 2 RIM = 771.36 INV IN = 769.66 STRUCTURE TABLE STRUCTURE NAME: DETAILS: PIPES OUT YI 3 RIM = 752.35 11T OF 24" RCP @ 0.50% INV OUT = 748.25 RIM = 751.47 SDMH 5 INV IN = 747.08 74' OF 24" RCP @ 0.88% INV OUT = 746.88 RIM = 750.98 YI 4 INV IN = 747.68 44' OF 24" RCP @ 0.90% INV OUT = 747.48 RIM = 748.98 FES 6 INV IN = 746.23 STRUCTURE TABLE STRUCTURE NAME: DETAILS: PIPES OUT FES 7 RIM = 775.86 12T OF 24" RCP @ 11.50% INV OUT = 773.61 RIM = 765.91 1138 INV IN = 759.00 29' OF 24" RCP @ 0.50% INV OUT = 755.49 FES 9 RIM = 758.09 INV IN = 755.34 Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: p GRAPHIC SCALE 0 15 30 60 Know what's below. Call before you dig. 1 inch = 30 feet Date of Issue: r/ o U 3-i 0. Q Q N � J �NooO CJ O O o Cn H'>�w A 00 C) 0C �S4 o �O U a0 1 000 O O Ln � �Lnz U �U) X I -I O W 00 �m�^ a (J� 0-) O oLLJ O o w O a- OW Q' D_ co 1--i E--' Co NO�yoW 4-) Q O a Q C� O O F-+ L Z r--� Q �--� ,-, Q E-4 • �'^^ N O W e lb- REVISIONS BY Date: 12/03/20 Scale: 1 "=30 FT Drawn: CLF Checked: DLM Project: 2021-01-08 Job: Sheet STY- 1 of 1 Sheets Location: ' rr •, � +� f # [ 1 ■' i ari ----_ ----__ / ■ V V`� 1-1 \�_ \' n \ \\ u \ E / - ��-J rngrn 7/— -1 / \ -1 E sc. 4655-60^g - J / / o' a \ \O�p , \ \ \ -\ _ - - - I r 0 It 1 / 1 / \ \ \ � — / -- �-- '\ � \ �`— J `� - - � (\\\\\ \ \ \ RB. 2s&sp°ELA �°'Qtz— �'��' \ —� JJ / /� \ —� / / ) /--�-- \ \ \\\ \ Py_� LI / /SUN \ \ \ �� \ \ `-� --- —/ / '--� \\ \\ / / / r / — \ \ \ \ \\ \\\ �-\\ � `-----� \_ 1 /a o \ �\ \ µI) 4' 1 °�G�o _ -� Z' -/ -- J/ \\ `\ /-�, \ // /i/ /// /' /- i\ �`\ \`\ \ ` \ - \ b \ \ \ \ \ \ \\ \ \ - / \ �\ J / \ \ u�'ll \ `-��a � ���� i-- -/ '� �\ '\ - /-- --/- \ -�-- / / / / -/ <\ 1\ \\ \ /// \ \ �� \ ` \ \ \\ �__\ — "\`--"-,, J ---- \ /\ \ 1 \ — v°�1� \� — ,iaa \J --'��n I /' -- � - \ T f / ) / \\ � � \ \ ` \ \ \ \ \ ^ ' \ � J —� ` \' \ I \ —$ ( °'— 14 a—^ Zi w / J 0 w / \ — / / I — \ \ /I � \ \\\ \ \\ —710� � — \ \ \ ) \J� wo \ _�a' J -j z >� ^�zo°'\ ( \ \ I � — — ///1/l // ,/ \ \ \ \\ \ \ \ -- ` - - , , 77— \ ' \ - - -� 72��2 � f \- _'� 0) Gz7 / 4 CQ E� \ _-/ N U �- � - ^ - - - / / / - I -- /// ; \\ \� \ YEAR FLOODLINE N� / / \ \ \ \ _ _ _ — — - _ Z �� / \ / ■ ■ \ \ \ \ ^ \ \ v \ — ` —� — — / / \ \ \ `" \ \ _ J — / \ — w J � 2 N �.- .--- / � M . ( `v \ f - \\ \\ l< -� \ \ \ - � \ \ \ 1720 A/ \ - -�� -o-- 1 - �!Y d' f O N / i i ( I I \ pG \ \ I/ r i \ \ \\\ \ \\ '� --- \1-1 \ — _ / /— \\\\\ \ \ V— I r\ —� --4-- - m — - "J — -- ` —� — I I F ' ■ \\ \ �\ \\ ` \ �i� _ / \ \ - _ J - S ,3- - - ^ \ t '� \ � ro '01-E• ^ / / J o 0 0, /- /) 1 c� ul \ 1-1 ` I - --� -� \ \\\ \\_\ \ \j l \ \ '---- /�— \ /\ _�_. _ `~ Z�m _--��`_ /"� NU-� -- I J ,.� 1 I \ \ \ � \ � � - � -.-. F���evelopmer� E \ x4\ � - �,� � 1 J � �. \-11 \ \1 — \\ \\ � \ \` --- —� / \ \ /� / aid /J / \ \ �/ ■ 5y 'q` '! ---\ \\\ \I \\\ \\\ � -�-� _-\ \ �� r \,) \ ---- -� `mod \ \\ \ # * a 4 `--� \\ \\\\\\\ \\ \ \\\` \ \ �\ �,--, \ \� \'i — — \� \� \----\ \ --//- // ------ o_ i �\ \ \\� \\ V / I / \ ,\/// / \\\� �\\\III \ \\\\\ \ \ �- �,\ �- �� _ -- 1J I J\--\ - \ �I \/O/ IM'I I 1INITY \\ \-1-/ /'�� - - \\-� \\\ \\\ \ `�\``\\�\ l\ ` /d \� � -) � ��--- - / \� \ J / _ \� '�' / \— �\ \ \\\\\ \\\\\\ \ ? �\ 1) I Nlj/ // \\ \ \ \ -- / f �V-J� — \ \�-�- I \ // //l/ f� -\ A , --� �-/--��\\� . \\\ \ \\\ \\\\\\ \ \ \ \/11 I �/ \\\\\ \\ \\\\\\ \ \-/ V 1 \ / GENERAL NOTES: \\\ \ \\ \ \\\' � I \/-�\ ;'�- \ o \ \ 1 '' \`/// 1. Current boundary based on information from �� \ ��\,�� -2j,°,\ o tij \ 100 YEAR FLOODLINE �� J`/J Ir II n I Boundary will verified \\ \ \ \� \ I�' & \ — ~ — `� — a°� o^ I ) -� ede County G S ou dart' be a ed by \ \ \ \ \ � 0- \� \ I 1 111 I 1 \\\ �' ar - _- �-� \ Q ' field survey' i \ ( ) I I III \ I _ - �_ - _ - _ � \ ��m 1 1 I o00 / /IIJI1111 I o ` �/\ J1if`—--';���� /�= �� - �\ �w�o \ 2. Contractor to maintain all weather drive access for) /) I J \r / , _ _ _� \ \ � _ _ _ , \ \ \ \/ \ \ \ \ (� existing house of Pamela Edwards. / / / / / ///, / ( \ / / / - - - \� / , _ _ \ \ \ jl\Ill' /// / /////�//,ati,) , % f/ /��rr//// /' _ — = � \\\-- — ( 113. Contractor to verify use of timber bridges for / / / , / /o I I I I ' \ // / _- - \ - _ iI / / w ( ( / // // / / / \\� //�- - - \\ \�\�--� I I crossing of existing as lines during construction. // / // / / /) I ( <- / 11 / / / // - -- \\\ \\ , � �� SEw — - - _ _- - - \) Il g g 9 9 ///,�/i o�` // l ) \ \\_ / / /-\) / , /// ,' _ �/, //_ ��\ \\` \\\\\\ ` / ER LIN 3/d �6g°- - / ( 4. Proposed driveway locations to be submitted with , /// / / _ - _ _ �/ - ��) / \\ - , - \ \\ \ \ \ \ \ \ \ EAS - ; I future erosion control of individual lots. / / /i % / 1 // , / / \ \\ \ >30 \\ \ �► I) I �\ \ �/ 3Id _ , I /// f r � - \ \ \ \ � d 3id ' II /% , ) / )) \ // // �// / ��-9"S� / //1 -�J f\\l / / / �� \ \\ \ \ I I �1-�\\ \\\ \ \ --- ��/� �" III/ / /(/ ( ) / //// /�/ /// // �I/, '\4750 00-�,-- (( \ \I I - - \1 / --� \ �\ \^\ \ t <<> ti-_ - \ '\ aid - _' y \ �31d r 700 — — =i `r I/ 1 I ( I l /l� l // "' i �� 1\ 11 IrI J I // / f \ 1 \`\�o\ \11 \\ \\ _ - - - --- V / / / I ) \ \ / -- r� 1 / // _` \ \ J � \ \ \ \ // yo \ \ \\ \ _ — -_ _-_-_-- '� _—_ —tea / ,RR,I�,, 9 / \ \ / \ \ \ \ \ \ \ \ /----- ---� — \ ---- / /, .� 1 1 W1W 46�4� / /l J l 1 I o 1 \ \ ( / � - - // ( n � / / T - i i \ \ \ \ , � \ \ \ \ \ _ /- � - �- J // - - -_- / / /�� \�.�� cks S49 / I I I I 1 \ \ \ ( / _/ // / I I �( 1 / \ �� \\ \\\ \\ \ \� \ �\ r ----- __---_ /- /jam— �'/' - // 0 4 / I \ �\ / f / // / / 7 \ \ \\\' // \\ \\\ \ — — — / / — ` / --- / / / / �27f pg Ft' I I I o \ \ \ ^ / / I / /' � ' 5° � — � \ \ \ \ \ \ ✓ / \ \ � \\ \ / --o — 1 — / (I l // n ) o i I � � --"-<- \\\\ ` —rj �/ I , r- I / f � � \ \ \ \ \\ \ \ \ — —� / — \\ \ //�� // --/1� °� --- � //// \ \\ \ \ \ \ \ / / J / / r \ \ \ \ / � \ \\ \ / .s \ \ - / \ \ \\ / J- \� --\ \ — / ( — \ \ \/ / / --- — _ may°) / -- // i �� / / / \ 1 0 �� \ ` \ \ \ \\\ \\ \� // I / // I / / \ \ \ '� \\\/ (\\ / \\\\�� \ \\\- -- -\ — \\ \\ \ v/ '�( // -_/ - --41�/ / / // / \ \ \ 'a° \ \ \ I 1 ) \ \\ \\\\\\ I ( l err / 1 / / / r \ I ` \\ \ \\ - / ) \ � - \ / / -- - \ \ �� - / /- / - \ \ \ \ I 1 \\\ / � Jr- ( / / / \\ \ \\ 1\ \�- -/�-�� \ \��� \,-, - �, I 1 0 ( \ \ ^ I / --- `� /� / \ \ I I \ \\ I , -� \ \\� // \I / - - / //�// = �\ \ \ I I) / / / II \\ �\ J �/ / / / __ \ \ \_ \ \ 1 - 1 I \\ 1 I \ \ \ \\\�'/ l� - - - �, / /i \ \ \ \ I I I \\� 11 \ ( \ / \ \ \ \\ \ \ \� / / \ \ \� \ I ( •� �0\C �E / - _ -// / ( �, io\ \ \ \ \ o I I I / / / I III \ ► / / \ \� \� \ \ \ �\ / \\ --�� \ \\ 7io / \\ \ 1 \ \ \ \\ /' / :// __1 r \ \ \ \' I ( / I I I \ \ \\ \\\\ //< 11 \-/ / / / / / I60 \ \ \ \ \ ( I \ /-/ -- _-� \\ \ \ \ -/�-_ ��r / \ o I I \ \ \ \ ` ) \ t ) /\// / \ / -\ --- ��-�\ I - \\ \ i-� \ \ \ \\ ) \ \\ \ \ \`\ \ \ / - / / /J \ �rAZ / // - _-1 \ \ \\ \\\1 III �/ I \ r �IIII I / II1 \ / � \\\ � \ I\ / / / o� ���\\\ \\ Rre�bev�el) eke � \ 1 1 \ \ � \ \\ \\ \ 1 1 � ) � I )I \ -/ � / r' � / \�� 1 � \ \ \ \ \ _/ " ---- � \ \ \ - � \� - ) \ \ \ \ � (� / / rya = I`6a \ \ o \ \ 1 ) \/ - L 1 1 \ \ \ \ / ( I �Z '\'-\� \ \ �> -- \ \ 1 \ \\>s \\ \ \\ 1 I I I I l 1 \ / ( / l \ ) 1 \\; J/ -_ \\ \� \ \ 1 \ / I \ \ / � \`� \ \ / \ \\ \ \�\ \�\\ \\\ \ \ \\ \ \ \\ \1 II \ ( 1 I\ 1 1 I I (, '-/ '- /� -J �'-_- \ ` \ I III \\ ,.t` / \\ \\\\`` \\ \\�� \ o_=J — \J \I 1 1 \ �\ \\ \�`\/��I/�� // / I l�� - l I I / \/ \ I 1 ( / \- / u0 \ \ \ �/^ \ \ \\ \\ \\ \\ \ \ \ \\ \ 1 \\ II I 1 I I / \�/ -/ \_ \\ \\\ 1 \ \ - _/ —, \\ - �1 f\� \ __�� \\ I ( W ( \ \\ \ / f I /\ � \ \ / \ \ \ \ \ \ \\ \ \ \\\ 1 I .p I 1 \ ( ) I / / — / — 1— 1—/ \Y ` \\\ \\ \ // —� \ \ \ _— `\ \-` \ \ \ `_� /__ `.i` i 1 / 0 / \ \\'�/ / % /� ) cA� �/ / , \ \ �N - I \ \\ \ \ \ \\ \ \ \ \III I 1 1\ II Ill l / �- � J \ _ r-� / ) \\ \� / ,- \ \ \ l -�\ \-- _- �� 1 / \\\\ /� / / --A ( c r _ \ \ \ \ \ \\ \\ \\ \ \ \ I I I I / \ \ �_- / � ) / 1/ \ \ / \ \ \ \ \ \ \ I I 1 I I // ) I / / 1 /� \ \ I / / ( \ ` \ 74� \� \ / / \ \ 1 \ \ 1 0 I / / / I I 1 ° �r�-Q�velo m� _ \ \ _ - "� ( / `\ / / \ I I / �� / \ J I / / /-� ( \ \ \ \ \ \ \ \\ \ \ 1 1 \ 1 \ \ ) I 1 /) III I / / � � \ \ 1 \ �-� / \ \ \ \ \ \ \ \\\ \ \ \\ \ \ 1 /// / JI ) / 1 I / \ \\ \ / �i \\ \ \\\\\ \\ \\\ \\\ \\\\ \ \ I ( �/ / III \ �/\ - ( ` \ \\ \ \ ,- ( \ \ \ \ \ \ \� \/ �� / r' \ \ \ \ / -- G / Co / J/- \ \\ \ ) / \\ \ \ \\\ \ \\ \\ \ I I I I // 1 / 1 I / / ° / ` ( \ 1 \ 0 \� / /' / '� \ \\ �\ \ ��-\/,--- �\ \\ � / I / \ � / 0 � / / \\ -J \\\ \\\�\ \ �\ `I) )III r� l I/ rJ\\ `I 11 / I / \ I ) \ \ ��,, / \ \ 750 __� \ \ \ / \ � �� / \ \ r _ \ \ \ \ \ \ l 1111 I I ( �� ( 1 II / / / / 1) / 0 / - \ \ ) \ -/ / -- -��-J/ ��J/-� / 1 l ` //'J5 -- �. / / / r ) `�\ `� / \ I 1 I I III I \ 1\ 6 \ 1 / �/III�/I/ ///' , / ) �I // / / / / / / �\ \ ) 1 I 1 _ / /� / I \_ ��-\ , J r �\ 1� -\ \ \`1 \\\ //J \ -. J ,�'� / /' /�-/ _/ \ "- � \ \ l \ PIN 4654�s8-6817/ I I I I ( I I 1 \ -�' \ 1 / )I I I ( � J / l 1 I / / / ) \' \ 1 \) \ \ \ _ -- -^ _ / \ / \ -J I I \ , r ) \ G� / \ \ / -/ ( \ �� / \ \ 1 / \ \`�Y°fix Pr�� I / l g. 1654/l I I 1 111 \ I\ l \\ \ 1 \ f III / / I \ I I /� \ I 1 / \ -�-o /c GG \ - 1 / �, / �'/' /'// /l \ \ \1) 11 // / l 1 / l li l �' — — _ I I I 1 ) / 1 \ I P'RO CAS R/V!. — 6 Ac \ \ _ \ _ -\ _ , , / � \ _ 1 \ --� �d�, j — \ _1f \ `\ \ 810^ / / / / \ / / // ) / I - / i - - �\ \ \ \ \ ) ) \ / �t� J \ o � / / / / / / // / �/ / ( - / \ I / 1 ^ ) G v \ \\ h I / / ^ \ ✓ Ci�760- \ \ \ \ \ / / / e l / \ / \ 1 \ \ /� / �� G —\ \ \__ �- / / //// / // \ 1 III I 11I / / l `G \ \ \ \ /� // / / %/ ///�// / /// / / -4- �/ _ ^��- \ \ 1 \ \ l I 1 1 1 I / � / I I \ / - / - _ \ \ I /\- \ \ 1 // '�''/' - = // // / // /// %� = - �\\ \ \ 1 \ ( I / / ) / 1 ( \ � i/ \ \ \\ \ (1 \ ,4 - t ' - `\ \� ' \�j// /i/ //i% /%///( i' \ I II1) I(I/� / / 1 - -J �-- �0° � \ \` �\ �-- --' \ \\\ I (1\ ° I \(\ \ I /\ \\ �l\ ( / //l \`\ \ \ / / //i �// / / % 68_ \\ I I J / / / / \ \ \ \ \\\\\� �� / \r\ /� 1 \\ l\ \ \\ l / /- \ \ -\ \ \ I l // /�/ //�- -/i /�i�//� 1g=� II \\II'I I I 1 I / I v / \ l \ \,\ r --\ /--,- - -J \ 1 `� \ I I ) _ 1 \ , �\ \ / \�� \ I l i `/// / ///�/ ;�� �/ //// "i/i — �� 111 I I I I / ) I / / / / ��/ °� \ \ \ \ l \ /-�/ / -\ 1 \ \��� \ \ ( / 11) I I� - - /�/ �, \ \ I �- - \\ \ \ \ I I II //�/// // % /� // \�///i/��- `\\\\\ 1�1 I I / / �/ / / / i / \\ \\ 1 I l \`/ -� \ _ _ \ I // // ( / )`-- \ \ \ )�/ / \ \ l/ / / '- /i// --- \\\\ 111 1 11 / / 1 � / \ � / l / \ -r ter-' / \ \ \ I I I / / / // / / / /////// 50%/�/ /� �� \\ \\\\ \\ / / / \_ \ \ \ \__ \ -- / \-/-\\ \ \\\ r _ \ I I / / / / / // / r "-I-,- // \ \ \\\ 1 / I / I \ I— f \ l 1 I c \ � / \ _ — � \ / lI f / /i\\ \\ 1 \11 I I I 1 I \ \ \ / \ I I l l / V-` \/ / / I I I I I I / / / ( - - __ \ \ \\\\\ \I\\ (I / 1 \\ \ /- \^ I�\ \ \_ ) // f \ \11 J /\ \\ \ \ \11 1 \ \1 I - \ � \ I / I ( III I I I / / ll \ _- j6o ;/ / \ I I \ - / / \ l \ I \ \ � / ) I ( I111 I II I I / \ 1 --- �-- ` ` \ \\\ \� ' I ` I \/ (J I II I / \ \\ \�\- �_/ - 1 \1 � \ \ \ II II \ \ \\\ \\ / '. / \ \ I 1 /-- - = � // / / - \ '\ \ \\ \� \�\\\\ \ 1\\ \ \ \ \ 1 1 I ( - \ \ / / ° ) \ \ I / /1 \ / - / ( I 1 1 I ` \ ` %= 70 / / \ \ \ \ \\\\\\�\ \\\ I 1 I I \I / ( \ \ _ J ; 1 J I \ ( I 1\ ) o ° ( 6s / \ / / - ) I \\� \ I I I I 1 -:5 _- _ / / \ \ \ \\ \\\ \ \ �\\ 1 I \ ) I ( I 1 /\\\ � �r t J 1 \ ) �i e�1e i� / / ` 1 I I \ I \ I \\\\�—���///j//--� /�- \\\ \ \ \ \ l �1�2 Dry �1 ( r \ \ \ \ �� \ ) 0 1 \ I ^��`' -t z 1 / - J \ \ \ - \ 1 I I ( - \ ( \ 1 ) � 1 1 1 iP1�� �P9. V-/ \ J J \ \\\\\ \ \ /i�`j - -- \\ \ \1�1 1/jv --\ II1,p \ 1 I I ( \ \ �- ) l�� o \\ / / / / \ \ \\ / / /� \ \ \ \ \\ ) )))�I\\\ \\\ \ \ l I 1 / f - /J ° / �/ 1 \�_ - -III � \/�/ / �� / I 1 I\\ \ I\\\ \\\� /J'�// /-- \ \ \ \ \\\ (ffl1�(��� I`\1\\\�\\\\ \ \ I I l \ 1 \ i / // / �/ -- --- l-'� f ) \ I \ �1 I\ \\ \ , ///- 1 \ \ \\ \\ ))AO(\ ���� `��\\\,\ I 1 I) / / I \ 1 / / \ - / / / \ -- 1 \\ - / /�- _ \ \ \ \ �( I\ �\�\�\'\\��\\I\I�`\III / // \ \ \ \ r // / / / // -/�r `� - � �/ , / — — — t \— \ _T\ \ \ \ 1 / ) / / J \ \� \ C�� J/ -9p, = Jj- \ \� \ \-\ - - \\-Aj /)\\\\\ I \1 I I / i I 1 / \ / // /� / ,/ ----- J ---1 I� - / — - / /� 8 w ,1 P� k \, -1 / _ \ \\ _ \ �\ �'�o., \\\�111,1\ 111Ill ► IIII I I I I ) ) / l • z - - J ,0 : f E"(� \d\ /� - _/ \ 1 \ \ \ \--� W \ \I1\�f 1 /) I I I ('\I / / / i -- -- � / i �� ✓ - J J / / q w 'f \ \ - ,- -- \ - / \ \ \ \ I111 �-// I(�1\ /�) I I ( / I / / / , p �- ' r \ �' / / _ \ I I )III //�/) / / / ) / Pie-Develo ment / - - �- � � \ - - \ - - _ - , i---� � / - 1 .- �� \ Ill ( / / ' / � '- -// i - / �- 'X^ �/ -_ /� - �� I�' N �qN\ i \ Imo \\ / /"-' --� �- -� -'- i/ ! / / / � �'- y 1 ,- �� - I 1L \ \ I/ III l I�lr ' / 1 / 1 / 1 �_ -- - _ _ � m 4� �-- °° / Jr `\ \ \ \ \ \ \ ` \ \ I I I I I IIIIIII�//III / /r J 11 / / / / / 1 / / �Crea = $.06 Act' -' -- - / \ _ - _ - � / J I / / / Z�m � �H \\`� -" -' ���J / -\ \' \ \ '\ \\ ~\ I 1 III/I I\\\\\/////ice= / / / / l / l I / // l I�'/r �' % -- / // /_r �I- / �� I \ \ F. � )/ / — ago N \ \=A _-\,\/ /� N �� �`�\\ \� 1V� ) ✓ \ \ I / III \\✓/,/�//�// // �/ /l 1 �// / _ /' - / -- J -- \ ll _ / z \�_� --� Jl � \ 1 � I\ \\ �� \ \ I I \��/ / / / / / a I / I ) ) I / / 1 -\ - �/' //I \'- — --- / \ _ _,_ -\ \ \ ,>- I --\ \ 1 �1 �(I� , l 1 1 r l / -_- -1 ,-- I- \ \ C/ \ \ w� II I I I �,\ �J �// // f / / // ��� l `l I\ I\ 1 I( ( // // // 1, L - /-,� 46 0 f -_ � / \ l / / PANS / -- \ 1 \ `� I I 1 \\� �/ / r / / I 1 ( 1 \ I -' _LOGA z�6 _ ---/ — \ \ \-- � \ 112I 1 I `d //I( / / I I \ \ ( ( / 1 / 1 �\ /J ��J \ ^ \ \ \ 1 � 7'� ( / I I I \M '7\� J I 1 \ \ / \ \ ( - i�,�j ��\ -/ � / / 1� / \ \ 54.4 \ °� , \ \ �°\\ m )/// i \ ? �� f/// / / / ) 1 \\ /) \ \ \> — J / ��/i ' ' / r f/ J� ,� ,� /�— / !� ——.'—/�--�— \�-- �_ — - — — N78° 45' 46"W N>s 3' \ \ \ \ % 1 / / I ) t �,.8�� l Ji/� / / \ _ — / — 8, / / l I 1 / / / \ \ �6�i�-'- \ \-- / r /- �J / \ / �-- _ _ 08 0 \ \ l \ \ / 1 I / 2 / \ ,� \ _ / � \�\ � \ \ \ \ / I / / ( ` �— \ / — /\ -- --e0�= 'w \ \ �r \ ` \ \ ^/ / / \ I l J �/ s,5 °a / \ \�5�' /� � r\\--J / \ - ,- / i % / -- \ --�—\ \ 1 1 J ) ° —\z\ ' \ \ /> J / J 1 / / — � � ��� 1 p\ 8 P9 \ -� _/ � Fes— _ / / \ // / i / \ �� \ \ \ \ -\� \ 0 / , \ ) / < / — 1� \ \ �_ --� \ \ I 1 \- --��� / \ - - - - ' \--/ ,/ \ // `\ \ P� \ \ -N73� "yy� N73° 21' 00"\N�2°332. I I \ \ / I ) I ( // o� ' I / / / 1 ��`�- / �,�� 3 \ \ \ 1 \ \ I I \` \` \\ / � / / J \ — � — _ — _ _— — — _— _ — — - �- a6 0� a \ \ \ \� � > J' — �— \ - ±' - ` 1— \ SANDRA\NJo 654-5�_4p6 )61.49' \ \ QD\4, 29' 3 \ ) \ \ / / J / - \ a / 5 , 59 _ \ \ / // (— — — — _ — _ — — -- _ _ _ _ — — J _l — — — \ J\ \ \ °B�,H SoN STIR\ \ ` 3 ,W J N�2'( 511 47" 1\ ) % I \ `\ / / / / / om�y�\�\ \ / / �0 23 P41 \ \ \ \ \ \ \ 1 \ \ \ C ---�� / _ / — L — — — _� i — --� � _ — - -1 \ \ \ T' 7263 EWA \ / \\ _ _ 9.72' \ ( � / / / < _ \ l ° \ \ \ \ \ \ i \ \ �` f � / — -- � ( J \ _ 1 - '\ ,\ \ `\ I / , \ �- /) 1 �I \ I I / / 11 � �/ \ \ \ \ \ / \ \ \ \ \ \ \ \ ` �\�\! �� -- ( - - ®/ / / \ 1 1 1 \\ \ i c` - 1 / � \ \ \ ( ( (� / \ ` 7� ( I \ I / / � \ \ \ l \ \ 1 \ \ \\\ -\ -) I A I `� ALE I 1 1-1 \ \ \ \ \ \ \ J \ _ _ a=,a.1� - ) I og3`F \ \ 1 I ff I I \ \ \ \\ \ - �, _ - _ ' - = , _ 1 \\ \ \ \ 1 \ I �� _\ \\ '�—'-- _ - i' / �65 77ig�t 09, \ l 1 l 1 �J l \\\ \_ \ `\\_/ I �1 -- --- \ i - \ \ \ 1 \ \ \ JJ \ \ 11 -- \ / -' 9��2 I I so�,31 l P9 \ \ \ \ ✓ \ \ I ( \ - --\ \ I I ) / / / \ \ \ 1 L I l \ - --1 ��\\ - J -) J \ I \ \ \ \ \ \ \ JAPAN 4a54-Sg� \ T °° \ / i y4 �7 C�� R 0• \ \ ^ \ \ \\ \ 1 1_ \ 1 \ MEsy 9946 / J�� � - - _ �P�R6 �R33"\ \ \ \ \ 1 I \ \ \ \ \ \ I I / / 1 \ l )) / \ - W w_h�t�5 -- - o' r \ =- _ -- \ J0 / `� - �9 \\ \ ► / \ f I o\ \ \ \ 1 P _ N _ %7 g. \ \ \ ) \ ` \ ) \ \ \ \ I / l / I I / — % �inct>r 0 e-- \ '� / I 9172ss I ( / / _ \ 13� 11� \ \. \\ \ \ J �\ ~\\ ` \, 1 \ i I \, I, ) I \ - / I / l l - f r ,� -� // - I b\ OP��oI� - - - - - � \ PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: z 0o r • � U N 73 r W Q " C 3 A '3 � a" 00 0 � v -' ro W 0. - 4-1 � ! �U" ., ...moo '- 0 0 o�.- �z�a 'C:�~wa a)00AA)"U�A ao1 10 O '.o �1 A) � o rl- a '-� �; a U 000 O 0 O � -) � U LO �� X ~ O LLJ 00 _J r,r) m --i^ U� O � 0 ��� LL-o 0) �4 O,,� 0 w O Ow a_ cz En ,� P..4 �r- O Cz C.� O W � Q O a = 4 �Z Q -- C/D O O E--4 = � 1 �- 4 w�Q(V O W P..4 = O � M-4 WQ�Q) '-.4 = W W W O A—' p�., (=) 'IN $' -'4' _ ' � _�00 -= �_ t 1- �' ' Ib REVISIONS BY Date: 12/03/20 Scale: 1 , -100 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet o D1\1 of 4 Sheets Location: a I. - , cbm S f - I ----_ ----__ / / g':'�� / / - ---7----_ — —I---- __—L I' 4 .k * 4 / E-, / ----__ __� — J I + • 0) — * 1 \ `�\ / -\ \ -_ � `— / _O obi \ \ —✓ — -- \ -- / \ — "/ \- \ \ � PIN 4655_ _ / / t/1 d \ \ \ I. �\ ��\ \ \`_� -__ E��C- 60� I \ �� -- \ i I /I1� /\ —_ ' \ \ (�`�J � J \\ \ \ \ e. 266HMEIq - l �2, ;- ' \ -� J f / \ -I- i / i' ---- \ \ -, \\\ \ �� � oPy-/ LI I ,'-uN -\ \ \ \ x' � �� / / ,_� \ \ / � / / � ,- �- _� \ \ \C\ t \� \ \_ \ \ — - - - i /a te\ �\ \ \ 1,r o c�i / \ / i l / / \ \ -_ A \ \ \ O I I _ \ \ \ / i // \ \ �� \- ` �- \ \ \\ �- \ - \`-� ✓ - \ \ r\ \ \ \ -v°�1� \�- ,°aa \J �n - i' — �/ \ _T J/ ) / \\"\ /I f �� \\ \\<�\ \ \\� \\\ \\ -7�°� \ \\\ \ \\ I 1 \� - o' \ - �-�_\J �ZWe/ f�L\,- / \ I / � // l l / / _ \ \ F / / \\ \ \ \ \ ` — — — — — — J \ \\ —_ �- -�,72_2 �f \- 0) W /' ,' --- 411 Q V C., \ _, w^U �— — —'\ — — i �-' / / / — I �__ 1 \ _ YEAR FLOODLINE \\\ _ °- —� m ��,� �� — J I\ / ■ * r—\\\��\ ^\ \ o �� �� \ \ ) \\ // / -to L0\ \ \ \`� \ �_'- '\ — --0� J xv �\ _� �Ao, I /�� /// ( 1 � �\ \ . \ \ \\ \ b� /� v — \ -- / \ \ \ \__— _' f r \ —�� FQ, — — m a _ � i l \ I I \ II f 1\ \ / \ _ _S " �- / \�� � C_^ / _1 1 / 1 \ l\ I ,_ \\� ��\\\\,_-,\\ \ l - \ -� /\ J � - 09 "��`�� aMmRL1\ J ( J - � ) \ 1 I ,6 ' y i — = \\ \ \\ \ \\ — \ \ \ \ I(- f \ \. \ < � -- ' \ \ � r � - 1_ �• �_ 1- 3'E \ \ — J — — _ �w J / J . 0 C\ \ 1�`" - 1 t+ — \ \ , ' % ^ \ mil- / / I N I I d x,� ;I� r -_ \\\\\\\\�\\\ \ \ \ \\— -- _ _ —_--_ 5 3, \ —J /\ n-n� ' ��. \ \ J _ L i T PF44p4 \\\ �` : -, \ \ ~\_ _ `'\ \ —1-1 — — -- -- —/ \ --`—_ -� � _� �N —// / v�S3N\ \ \— - \\ \\ / \- ---- -_/ \ \ - /I / a`4d /J / \ \ r ii r \ \\�,� \ \ \\ \ \ �\ /— \' ---- i---- \ \ — —_ r / / ----�— --- / � >. \ \J r 5k'tl'9` ' l i _\ \\\\ \_ \ \ \\\ p -- —_ \� \ � — �_ `mod \\ �_ \\ \ \ \ \ \ \ \� \ \"/ � - — I __ / � -- --- J .s a a ` �\ \\ \ \ \ \\ \ \ — /-\, \ � "� \ _ \ —\ — — /` / — — — — — — -- o. \ "07�-\_ \ \\-" \ \\\\\ \\\\\ \ \ I \ - \ \ p JI- • �\ �- - - -_--.-� \ / � / 7° \ \ \ V / I I r \ \ //, / - \\\\ \\\\I I I ` \ \\\\ \ \ ,' � \-, \�� FLOOD P =\ \, ,) \ o C-, _ 1J ' = J _\--\ — \ 'I \�O/ 'w'I I 111� JL 1-1 _ -_ \�'\ _\� \ /' V \\�vr\ \�__(/�� \\�� \\\ \\\ \ ��\\\\�- =_ \' \ \\'�� ,\\\ \\ \ /°' \� LAIN _:;� 1 \� --_—_/ ' �� �' �_\ Jil _91- -----" _ __ �' --\ 0, '� '__J '�-- '_�./�_��__ I: A__�- \/ , � I \ - �' _11�\ '\ - '\ �"\\\ �\ / /') J/ _____ - \ \ \ \ I �/ /, � -_ �> \�\\\ ::� \\ \\\6\ �\\\ \ \-/ V 1 \ // GENERAL NOTES: �' -'i� _ \\\ \ \\ \ \\\�_� I ��_\ 1'�' \ o —` \ Ij �- 0 ��� \\`//� 1. Current boundary based on information from �� \ \�\`� -21,70 ti ` l ) \ �• \ \, _ 100 YEAR FLOODLINE -� . 10 - \ J \ \ \\ \ \ \\ IV) o aq q J)�lJ/ Iredell County GIS. Boundary will be verified by \\ \ \ \ \ \\\\ \ �\�� T& \ ^ J — ~ — — `� _ \ ( �° \ \\ �— — /i _ �—\ field survey. \ ( I I / I 1 I I 1 111111 \\ I\ a - -- - , _ \\\ �, m 1 1 I o00 / IIIJI1111111 I o ` /\ �I_--__� \� ! - -_ - woo. In /// I J11 \ / Jf—_ - - \ 2. Contractor to maintain all weather drive access for) / I J � tr / , _ _ _�_ \ \_\ ` _ ; � __ ___ , \ \ � \ / — existing house of Pamela Edwards. / / / / _ / / / I/ i �(I I \ �! / i// / — — ��\ �� — \ \` \\\ J\/ — _ \ _ � \ \ \\ APPF� t�I( 9 //// ooU /�/ / — \ \ \ \ \ \\ 1 \11 113. Contractor to verify use of timber bridges for' /// o oL / ///, //// 1 I I % f f Jul / / / _ \ \\_-,/ // — _ -- \� \��\\\ — _ I �T ,c _ ( I / //�i -� /o l(I / / / / / , _ \\ � /� - \ \\ \� \ \\ �- \ � I I crossing of existing gas lines during construction. // /// /� / / / / ) I ( / /!/� ) I I / / \\� / /� � \�\ \\\ __ -- \\ �, $E — — _ — —_� \) I J //i/ / / o° / / / l 1 ( \ \\ ___/ / / ! 1 / / � /' / - \ _ _ // /� - \\ � \\\ �\ `� \ \ __ \ \ \ ` SEWER LIN 3/d _� - / 4. Proposed driveway locations to be submitted with , / / __ 1 \ v /1-1 future erosion control of individual lots. / ( // _ _ �J — / 1 / ` / _740 \ \ O \ I' 3/ \III i • / / , - //i - f r _ \ \ (\ \ d aid - _ - I II /%// ) /� ) ) \ // / / /// /�/ ' /�� - -- / //1 - -\J t�\I / / /\ ( \� --,\ \ = 31d -goo= � "a (ram I / / I (( ( / // �// // / j / / I� Ou_ -/ \\1 \ r // / f ,- --- �P-\'\ \�� j\\\ °\ \111/ l-�\ \\ �' - -- --- r 1/ / ) 1 I ( / / / /�I / I // i __�� 1 1� \II I Q �� / � \) \\� / \\ \ aid _ - _- 11 / 1 1 \ 1 / l l I / / -5 / - - \ \ \ \ \\ - - \ \ — _ — _ - - — _ /,/, io- _ = - / / � �_ 7 — � / V�/I, I , I I / I (\ \ / ----) I \(1// //� �/ ' .-J \ 1 \\_ \\\\\\\ /j/�o \\\\\ \ '\ ` _ 1 ----� -- � _=_ --/ / - — —�� �, �\ 1 I lbw "146�4, I,/ /� / I (I I I I o 1 \ \ ( j -__/ /// ( I I/ � / / �\ \ \ ~\ \ \\ �/ ' \\ \\\ \\\ \ __- _-_ _\\ "%— �_- /' _ --- -f' z /�i' �yl� �/ �) \�.� 2kSO�r54g4 / / I I 114 I I \ 1 \ \ \\ \ \( / // /� / I / I / 750 _ \\ / - _ - - - -_- - _ --� - - - // l / 7 l8 I J I 1 0 ( \ \�\ \ \_\\\ (� _/// I \ r / I I f / / _I— \ \\ \ \ �— \\ \ \\ ✓ � �\ \�\ \ \�_- \ �_ Jam' r / —�\\\ —\/ l/// �� --- f /' \ _ —_��5, /�/// 1 / / ) (/ / / I I I \ \ \\\ \\ / / �Q I� ^/ I� \ \ \ 1 \ \\\ \�//� \\�\ \\_ \/ r / /10 _ -- \\ \r //////i �o� - -- ---� �//// / / / ( ( \ \ \ r / � / ".�� \ \-_ // // \ \� \ -_ ��� ( /- \- \_\\\/ �( j //� --_ _ � ---- __-_ �// / / / / \ \ \ \ \ \ \\\� \, //' � I / �' // 19 /r = \\ �\ -- \ I\ \ \ \ / �\\\\ \ \ / \ \ \ 1-1 \\ \ \�/ \ � / / — _ ---- / //� \ w\ \\ \ I / � / Jri / / \ \ 1 \\ � \ I\ ( \ I /__ /� \\ \ \ I 1\ / \- 1 J\ \ /_\ \\ \\ _ - \�\\� ,-\ \,_f IIo - \ \� \ \\� // �\I/ / // _ � � - /// = \ \` �\ \ \ \ \ \ 1 I J / J I 1\ ; \ \\ \\`\\ )// (// /-`_// fl / � / / _ \- \ I I / \ � \\ -\ \ �� I- f J 1 \ \ I \ \\\ \ \\__/ �l � ,7� 1 / /,_ _ \ /"' \ } \\ I I 1 \ / I / \ \, \\ �\ / \ I � / \ - - \ \\ \ / / / / /// / \/ I� �\ \ \ \ � I I I / / (I III \ \ \\ / I / %/_ ' , \\ \ \ \\`__ \ \ \\� - \\ \ - \ \\ 1 \ \ v / / /' -- / \ \\\\ \ / y / 1 / \ P\� \ / \ \—_ \ \\ — —�� \ \ \ 710 / ) \ \ \ / �/ —d / / __ i \\ I 1 l/ < J 1 / / 6o I / / ( I I \ / \ ����- (o \ \ II o/ I \ r �IIII I / 60 \ 1 \ _ \� \\�� \\\ \ / / \ \ \ \ \\\\l l ,/ / / -� \ \ \ \ \ \ I I \ / / rea fpr Ditch \ ) I \ rxo - - f -, \ \ - \ - I \ \ \ \ / / o� \ \\ \\ \ \ \ \ \ \ \1 / / ( r' / \ \ \ /' r - c\� \ - - _ \ \ �\\, \ -`---- \ \ \\ f / '/ / / / /J \\ \\ \ _'-fV _ \ \ \ \\\ \ \\ \ \ , �� /� / n '` \-� r-- i-- \ \ �`� � \ \ II\ \ '�\ J a= � \ \ \ \ \\ ( \ 1 I /� _� \ \ "' \\ \ \ \? I / / \ \� / / \\ \\ \ \ \ \\ \\ ` II \ \� 11 III 1 =�\�/ J / / \ 1\ \- ,. \ - _ \ —_1_— 1 ( 1 ( \ \\\\ ///�/ f 1 1 ( / \ \ \ -/ \ - f�\ \ �_ _ ,�\\ / -, \ �\ \ �_ \ \ \\ \\\ \\ \ \ \ \ \ \ \\\ l l I --' I \ I \ I (I I I I I / _ _ '/ _ \ _ \ \ \ _ , W = \ � w,' � / \ \\ �N --- - \� \ \\ \\\ \\\ \ \ I I I I I I I J , J f / ) \ , Ie _ 1 / \ \ �/` / ��/— I �G/ r // _ \ \\ \ I 1 III / �/ -- ✓ (\ I � 1 \ \ /\ .� I- \ \ - - \\ \73p � --/ l / // ��� \\\ ___-\ \ \ \ \ \\ \\ \\ \ \ \ \\ I I I 1 \ I 1I I �J I l / / )\$ f j 'yL / _ _ ( I / / /-� ^ / % l \ \ \ \ \ I 1 I V / / d spjr�' `` � _ \\ \ \ (=f \\\ -_ \ / /'� ( / \ \ \ / \ \ \ \ \ \ \ 1 I I o J / i I (( / \ / s+ A\FEa fbr Ditch Sic{i ht o Wa 50 /' / / / - \ \ \ �� ` \ - \ \_ ' ( / \ -_ - - / � - // 1 \ ( \ \\ \ 1 \ \ II / / - \ ann A�.)�--i \ \ 1 I _ _ - \ \ / / \ � / I J ) / l \\ \ \ � I ( >Channel #�> ( ( / _ \ \ t \ _ \ - - \ - • FES 6 _ 1 740 \ J / Z / / \/ \ \ \ \� \ ( �\ \ \ \\ \ '-, \ \ \ I I I /) III I o s 1 \ / \ 1 \ \ \ ' \ \ \ \ \ \ \ \ / �j � \ \ / - Aria for Ditch \ a - - \ \ \ \ \ / / rn / / / / I \ \ \ \ / \ \ \ \ \\ \ \ \ \\\ \\\\\\ \ \\ 1 ( / ( / \ ~ \ / \� \� dG // �a�' /' / \ _� \ \\ \ o° / \ \ \ \ \\\ \ \ \, \ \ 1 1 I I I / III \ \ �\^>' / �� \o.lAc. N ----- ' \ v\-_\\\\\ \/ // \ , \ \ \ \ \ \ \ I /l l l l i r ^� / \ \ \ ) / - \ \ G \ \ \\ \ \ \ \ \\\ \ I \ I III I I / / / J I \ / I I / I I J I l _) I , ° / o o _�® 75 \ �t for itch \\ \ \ (/ / \ \ y / � � , / - ) `['�� ` I I I I / I I U7 ( I SDMH S / J \ \ I \ / / \ / C��. / / \ \ \ 1 \ / \ \ \ \ \ / / � I _ / / \ \ \ r--Area for Di�ch J I \ \ I I w ( 1 I / \ r o - ( / I- - / / 1 \ \ Z126 Ac. Arga f r\p cN \ I 1 / 1 / I I I� I I/ / / - 1 I / / / / � / I ) I / J / / / +�y Qha nel # > I FIL INI RFA TO DRAIN - - �` a0 - \ \ / o \ / _ 1.S /s� o / J _/ \ - -` I, \ PIN 4654 8-6s1� It I ` �0.�1 Wc{ \ \ \ l % I ((�\ \ / J l I 1 I / l I / ( I / \ I �N ITCM TO YI3 YI3 4 p vI4 ` \ I \ \ / \ V �z � / / / \ \ �s / \ G \ I \ ` 1 / I1l ' \�1 / l I \ \ q � / - \ 11 �`f � 1 �A� / / / \ / Y�xaox I_I�s LEI o \ 1 \ \\ \ \ 11I / \ \� I \ 1 1 / P IG G I -) \ �_ - \ \ � 1 \ \ 1 / -\ \ 7�, '- -,� J �' / \_' \ \ \ \\ \ B. 2� \ \ �4/ I I 1 \ \ \� \ \ I / I I I I /I /I J ll I I I � �_ / I IA �0 I ! :.1. \ \ - \ ( / \-- _/ ) / / // / �\ II I 1 / 1 / / / n I / -_ \ \ \ \ r( \ i / -11 \ / /// / 'J � \ I 1 l / � \ I 1 \ \ / _ / - , G - :: -760- / / 2. \ \ \ 1 / // / /'� / /// // / / / / a �/ �_ \ \ 1 I / / w 1 — / / „ \ \\ \ 1 \ / \ \ j ' J \ \ 1 / / ' //�— i '� /�j/ / / s//� — —� ��\\� \ \ I I\ I I I ( / 1 / /_ ) 1 ( / \ \ \.� ' / o \\� \ \ \ o. I ( \ /` — \ I l / iso /l \ r Di C11 \ \ \ \ \ \ - \ \ \ \ / / j / / � j ; � j/i /// / 00.-' 1 � I 1 I I I iI I � � 1 I / /l / ,\- Area f i`Dit \ '�\- - �t. l l / / /- ,- __ // // /— — �� � 111 I I / I / ��/ o \ \ \ � ��:9� \-\ � -J \1� C. '\ \\ I I I I I 1� \/ )/ -\\ \ I / /- \ 11 \✓ -- / \ \-r \ \ III I III / /// j/j ��%//// f 150�/i/�'/� 7� 7 �` \ ��\\ 1111III1I / / J ( / \ \ T � / - -/_ l /' /� /� \ 1 �_� 1- ' // \ \� \ \\ \\\ \ / / / A \ - \ _ / \ 11 �II I� lll�/ / ///r \,"/-' / \ \\\ \\ 11 11 / I / \ f -- ---� \ \ I I / I \ G \ / / L� / \ \ Existing 14' Wide Drivew y Ace / / o Easement per DB 16 2 P,G T�() / l III I I O // '11/ \ \ \ \\ \ \ 1 \ I \ \ I I 1 \ L �► I I I \ ) \ O \ \ I I \ \ FES 9 - �,-/6o // / - \\ \ \\\ I \ I I ( I _!,_ \ -- \ ` V '� 1 - / A fJ I I (1�1111� I 1 I I I j\�� =�_'/' ---\ \ �\ \\\�\�� 1 I \ -- �`� - \ � \/ /1 O JB 8 �� _ / / \ \\ \\\\\\ \ \ \\ \ I .% I \ `t' `�J\ I \ \ I I \ \ \ \ ,�• ,l / \ r / / i �� 770 = /j / — \ \ \ \ \ \\ \\\\\\ \\\ I I I I.erk \ 1 \ \ 1 / C ( I I \ I\ I I i \ \ \ \� 1\ \I ` \ , ( ) I I -9,� - l I i f I I ! �� 05 � I /05101S _ ) / ( / ` 1 / \ \ a // -- / \ \ \ \ \ \ \ \\\ \\ \ ( �\ \ \ J \ O 0 4 � 6 1 ( \ __)� I \ \ \\\\ / /�-- / �_* \\\\ \ \ \�\�\\i1 \\\\\\�\\\I I rO p\d o \ /1 / 1 \ \ \\\ \ \\\ \\\\FES7\ 'moo /�/� _ - \\\ \\ \ �\ j%i/�/�=\ \�\ ��\\\\\ I ( I I �' / '`9,�\O� - - ( 1 \ 1 o \ \ \ \\ �I /���p9 (`- _1 ` `\-/ \ J/ j'j/� �_ \ \ \\ \\ \ / $o - - \ \\ \ > r/� _ �^ \ I I\ I I \ \ 1 I 1 I f p. \ ) 1 ) \ \ \ \ \ s �'og. ` i / i _ \ \ \ \ r-\� \-- �� /� \ \\\ \\ \\ " ---- --- - \ J J�I<'� �\��\ `\\\\\\ 1\ \ I / 1 1 / / 1 �1 \\1` \-- \° I �� \ \/ �/ \l (- \ \ \ \ \\ \_ '// i� � \1.1 \ \ ���%�`=1))'111I`,' \ \\\\ \1 I I I / _ / �-7o �/ �/ - / J \ \ \-_\ so. II \ - J / - / 1 ---/' I \ I\\ 1 �'\\\ \� \ \ \ \ \ _�\ 1(flf1�5��\ I I`\\\�\\\\ \ \ I I 1 / /' �/ ( \- - � --- -- _/_ '� / 1 � 0 W J - \� / - - \ �\\\ \ 1� 11 1% I I C�) / " \ 8 � �- \ - \ \ \ \ _ \ moo., \ \\\\ \�- 11 Ill, ► I I I r / / _ , � _ / __ , o00 \ \d 1-4r\ �� r \ \\ \\\ �-- \ \\\\� Jl / I I I 1 �afor - —_ / �_ l rJ --' _—/ \ r \ \ \ � W \ I / / / / / i A w7 � \_-\I� � \\1 \ \ \ \ III\r-//I(�\\ /IIIII / I I // / 9 0.Z Ac. / > % /'-' ' ' \ \ ,- �- i' � �_ / v a v m\ Lqs � o>' 1 )� \ \\— I I111111 //iJ/) l l% l / / l / /' / — �-- � ( \ �\ / � �_ I¢,o ;� BAN \ \ �, -___ I IL \ - 1 111�Iill - //- / 1 / ( ego I- I- / --,) _ ,- -, ,�� __ ,- ��° - _ -/T � �- N __� ^ \ z m\ \ go U >i. 1 \ \ \\\ I- II 1\� ll / -� %I/ ^ // —/ / —i — — J /� r J� /�j l —_ _— \ _ � � �`� < � o r = 1 \ \ \ \ 1 I (I I III\I�/ �/ /� // / / J 3/ \ VX / / - _ / \ / - — I / / / z�m N z \ \ �E;� ���� \ \ ` -\ \ I /IlI \*//J///� / / / % l / r % —/ \J // i— �' � ( \/ \_� / -_ to z a�.� I vim\ ) ( \\ �\ \\ I / II I 1\1\�/// / / / 01 I �/ ( I �i /'- �� / /- -'�-___- / --- " \ \ ) i \ — F \ A \ — J i ') ✓ \ \ I I / / _ / / I / J v ( / / — / — r � i -_ /' r \ — \ \ / z /ct \ >_ I \ I / / / / , 1 I / �� /- _ _ -_/ / \ - - \ I 3 /^ \ \\ III 1 \ \ 1 / / I l / / / Are f r Dit� ( I / / / L - �� 46 i$ R� �i_' - -' / � / _ - � \ c-1)- W� I \ / f� / 1 C 1 / / -/ PAN '3 - \ o \ _ I I \ \ \ / ( - 2.O�AC. ` � I ` I / \ / ram- _ _ `-Lo - //--- - -- ----/ --- \ — - \ � N78. 26' S"w\\ �\ \ \ `�\ � Wa'VP 71I I� I I \ ' 47 \ // �� / / I / \ \ \/ \ \ _1;, �- \I- �'C��� /_/ �, \ / 31.99' .- \�/ L ida I I �/ / / 1 / \ \ �" \ \c/ -'��� \ �•\�' /-_ // /' �'// � ^ \\--- I- I\ Jr C \ �\ v ! /I — / / / 1 0' �zo' cN SEMENT ` > // / / r\ ` \ —J� -� — / \— — / / — — \ — 4-& 443' \ o'-, .2 , \ \ ��ml / I \ \ ? // / / I I ( ) / 18�, z /'l Ji/� // i - �_ � /- -�, / �� -- \-\--� - _ N�� °' 08,E \ rn o o \\ ��\ l\` \ ���( l \ \ z ^// / // I ( (f) J \ I - 7• �112 / \ \ \ 10.L 'i \� - o V J -% r /_ �� / �1 / I`— - ---\= - -boo , -- - \ \ cU M o Q r \ � \ \ \ \ _ / - / \ ( / \ ia\ 4 5 ' p` g5- _ _ - r \ - -J - - -- / \ \ / I l / / ( � \ -�- � I / // \ \ / / -\� / / \\ _ -- \ ' O 'I 1 1 J ) °o -\z\ \ \ \ \ `'l J � l S•' FES2 �� / ` ��! 1 �� � g P9 —� —/ � \— ------ / —/ / / /i \ / / \� - \ ze �� r \ \ \ c� \ \ \ �o \^ i \ / FES1 / \ \ `-_� \ \ �J I I ( I�)/\\\---\----- �/ \-�/-�/ \ / / \ / \ \ \ SA \ P/N 4 \ \ -�173- \ „W �'�2L "w IV �o . > I I \ / \ ( / I i I / ° ' I / / / - - 1 -� / 654,�� LE� V \ \ \ \ \ \ \ \ < \1 ' / / � - - - - - - _ - - i- _- --� / - - \ NDR4� 654-57_ C�1.49' \ QO • 29' o l I \ \ - J - \ a / 4 ADO 594- \ \ \ - - - - - - - - _ \ \ - JoHNs 4os2 \ \� �� 33'I I ( \ I / \ � m� ��\ / �� 3 P9 I \ \ \ \ \ \ \ \ \ l / _-__ / / (- "_ - - ' i - - - \ �_ __ - \ \ \ °B�r, s MEW \ \\ ) N�2' \51 \ 47' \ 1 % \ / I / - \ / �_-^\, \ Zo oe• Z \ \ \ \ \ \1 \ \\ (��� _ / �_ / L ( z - v� o _ / 52 \ 1 C .� 1 \ / \ \\ � \ \ /�\ ) \ I I \ / / � < - \ \ \ \,.7\ \ / \ \ \ \ \ \ � \ �;�� — I ®, j ___ (_\ l \ 1I \\ \ \ \1-1 \ \ I _ 'f- \ / 1 46 \ ( \ l ( \ \ \:,- �) I I \ \ j' - - \ \\ I I l�� - - o \ so ioo - . I \ \ \ \ 1 \ \ \ \ \ JII \ i \, � ` l / ��'_ 94�2 I I SoYii`,3�� P9 21p2 \ N �\� \ \ l \ I \ \ I l l � \ \ \ \ I I I / / \ /�� \ \ i ) L I / I \� — — \\ \)\- — � JI i � J \ I = \ \ \ \ \ \ J, 4a54-Sg� T — O / L — — 54 C� \ ` — _ 1 \ I MES 9g46 - } - - 46 �R \ \ \ \ \ \ \ - \ \ I I I \ _ ) I 1 � J \�,�,�` e-y_ \ o.e. �167 Ja N46 / J — _ _ P`N ,t 1N • �9 332 \ \ \\ \ \ 1 1 I / \ , ,/ I j / \ �� : n W_il"dt�S 1,�1� � < r =— I o\ \ \ \ \ � l\ Pg J 725g N I ( \ — \ SE 1 11E \ \ \ \ / I\ \ J) \ \ \ \ \ \ \ \ I 1 \ // I � l / l 1 �(� / ,_ � // \ nctr 0 e_ PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: z 0o r • � U N 73 r W � Q " Cd 3 d� 3 a '3 � A � N" �000 v W r.�~ t! 2'Z U �U" , - 0 UR 0 UZ a Ica �~wa aAA)) 00 zA ao4 O � �1 A) � o a :z �� 0 Z = U I'-- 000 O O O � -) �Loz U �� x ~ O LL-I 00 _J r'-) m _ Cn ^ O � 0 ��� LL_o 0) �4 O� o w O Ow Iz a Cn 'r"4 �J �=' �r_ O w Co Merl O W � � P4 � = � � ;�-4= =4 O a = Q C..) U-2 O ' O 0­4 -- � I O F__i Q 1--­I !!r4 O = ;�-4� Z 0-" 0 Q , .' w�64 � F--i wQ�'�0;. = GU I V.J " N W O (=)G" O � V .\N .' �' _ ) _ r �fll -= "' ��� ^,/p. .� 11�pl — REVISIONS BY Date: 12/03/20 Scale: 1 , —100 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet D R e 21-) of 4 Sheets Location: a I. - , Cbm S f - I ----_ ----__ / / g,:'�� / / - ---7----_ - -I---- ---L I' 4 -k * 4 / E� / ----__ --� — J I + • 0) — * 1 \ `�\ / —\ \ -- � `— / _O obi \ \ — —1 — -- \ -- / \ — "/ \— \ / � PIN 4655_ _ / / t/1 d \ \ I. �� ��\ \ \`-�--_E��C- 60� I \ �� -- \ i I / / 1� /\ -- , \ \ (�`�J -- � J \ \ \ \ \ B. 2660lGiELq grt / ,�i ;- 1 v j \ - \ J J / / V \ - I- / / / - - - - - \ \ \ \\\ \ �� � °p9-t LI T / /,'-UN -\ \ \ \ x' � �� / / ,--� \ \ / � / / � ,- /- _� \ \ \C\ t \� \ \_ \ \-- - - - i /a te\ —\ \ 1 1,r o c�i / \ / i l / / \ \ -- A \ \ \ O I I _ \ \ \ / i �// _ \ � \ \ \ \ \ \\\\\- \\ \\ _ J , -_ /-� � \ \ J / Q \ \\\\ � \ - ah Q- \ � �o - '\ / / / "� -\ \ \--- /--/i/ 1\ / ///(/l /'�/ / \\� <\ \ � \ // \ \ �� \- ` �- \ \ \\ �_ \ - \`-/ ✓ - \ /\ \ 1 \ -v°�1� \�- ,°aa \J ten / // — �/ \ _T J/ ) / \\"\ II f �� \\ \\<�\ \ --1 �, \\\ \\ -7�°� \ \\\ \ \\ I 1 \\� - a o' \ - �-m-\J °Zt�e fC-,4,- \ / \ I / � // ) / / / \ \ \ F / / \\ \ \ \ \ ` - - - - - - J \ \\ -- �- -�,72-2 �/ \- U7 W /, ,, --- 411 Q V C., \ _, w^U �- - -'\ - - i �-' / / / - I �-- , l (� \\ YEAR FLOODLINE \\\ - °- —� m ��,� �� - J I\ / ■ * •—\\\��\ ^\ \ o �� �� \ \ ) \� // / -to L0\ \ \ \`� \ — �-,- '\ — --0� J xv �\ _� �Ao, I /—� /// ( I � �\ \ . \ \ \\ \ b� /� v — \ _— / \ \ \ \__— —' f r \ --� FQ, — — m a _ i l \ I I \ I1 f 1\ \ \ / \ \ _ _S , �— / \�� � C_^ / 1 / 1 \ l\ I ,_ \\� ��\\\\,_—,\\ \ l - \ \ —� /\ J � — 09 �`� aMmRL1-- \ J I J — a ) \ I I d6 9f • ' y94 - — = \\ \ \\ \ \\ — \ \ \ \ I(- f \ \. \ < � / \ \ � r � — 1_ �• �_ 1- 3'E \ \ — J — — _ �w J / J . 0 C\ \ 1�`" - 1 .+ \ \ \ , ' % ^ \ mil- / / I N I + d x,� ;I� r ��_\\\\\\\\�\\\ \ \ /' \ \�� _— — _ _ —_—__ 5 3, \ —J / /\ n-n� ' ��. \ J -- _ L i T PF44p4 \\\ �` `-, \ \ ~\- - `,\ \ -1-1 - - -- -- -/ \ 1-1 --`-- -/ � _� �N -- / / v�S3N\ \ \� E - \ \ \\ \ \ -\ J - Yoh ( \ -L-m- / avid r ii r \ \\�,� \ \ \\ \ \ \ /- \� ---- i---- \ \ — -- r / / ----�— --- / � >. \ \ J r 1, ti 'q` , � \ \ \\ \ \ \ \ \ \\ p — — -- \ � \ � — -- `mod \ \ Y� I_ \\ \ \ \ \ \ \ \� \ \� \-, - — I __ .s i 4 ` �\ \ \ \ \ \ \\ \ \ — / -\ - \ \ "� \ _ \ ^ \ — — / ---1 — — — � — — — — o— \ \ \ \ \\\\\ \\\\\ \ I \ \ \ F o � . s ,/ — _ _ 1-1 \ \ v / I I \ //, / \\ \\\\I I I ` \ \\\\ \ \ �_ � FLOOD P �'�\\ `� J \ _ /- ' � J -\- -\ - \ 'I \/(�/ 'w'I I 111� JL \\�vr\ \��/�(/���� \\�� \\\ \\\ \ ��\\\\\\ \\ \ �°' \� LAIN 1 �� --__—/ ' �� I ,/ /I \ / /,) J/ ------ \/ , � - \�/ /// —\- --�'\ \\\\\ \ \\\\\ \ �, \ -j (— �\ — — �-- I:/ - =- - �, 6\ \ \ I �/ /, � -- �> \\\\ ::� \\ \\\,\ �"\\\ \\\\ \ \-/ V 1 \ // GENERAL NOTES: �, -,i� � \\\ \ \\ \ \\\�\\� I /-�-\ ,'�- o — -\ I' �- 0 ��� \\//� 1. Current boundary based on information from �� \ \�\`�-2,,°,\ `�6 ` l ) \ �• \ \, _ 100 YEAR FLOODLINE -� .10 \ J \ \ \\ \ \ \\ IV) o aq q J)�lJ/ Iredell County GIS. Boundary will be verified by \\ \ \ \ \ \\\\ \ �\�� T& \ ^ J — ~ — — `� _ \ ( �° field survey. \ ( ) I I 1 I I 1 I I II11 \\ I\ a - - / / _ \\\ �, m 1 1 I o00 / lJ1JI111111I I o ` /\ �I_---_����� ! - -- - woo. \ 2. Contractor to maintain all weather drive access for) / I J � \r � / _ _ _�_ —�_\ `_ ; � __ ___ , \ \ � \ / — existing house of Pamela Edwards. / / / / �/ / / / I / i �I I I \ �! / i// / _ — ��\ �� \ \\ \\\ t�1( 9 //// ooU /�/ / — \ \ \ \ \ \\ 1 \III 13. Contractor to verify use of timber bridges for' /// o Q- / //// //// 1 I I ! f f )�/ / / / _ \ \\�-,/ // — _ -- \� \���\\ — _ IAPPF�T ,c _ ( I / //�i -� /oI(I / / / / / , _ \ - /- - \ \\ \� \\ - \ � _- I I crossing of existing gas lines during construction. // /// /� / / / / ) I ( / /!/� ) I I / / \\� / // � \�\ \\\ -- -- \\ $E — — _ _ —_� \) IJ //�// / o�/ // l 1 ( \ \\ / / / 1 / / �/' // --` ✓// //- \\� -- \ \ \\\\\\ \ � wEi� LIME 3/d -� �- / 4. Proposed driveway locations to be submitted with , / / _ _ 1 \ v / future erosion control of individual lots. / ( // _ _ �J — / 1 / � ` / _740 \ \ ° \ I, 3/ III I i • / / -- //i - f r _ \ \ (\ \ d aid - -- I II /%// ) /� i ) \ // / / /// /// ' /�— - -- / //) — —\J t�\I / / / —' / \ ( \ ` --,\ \ \ 31d — 700- "a —� (ram I / / I (( ( / // �// // / / / / ,5 Oe-°�,,_J \\1 \ r // / f ,- \� \�� j\\` °\ \111/ l-�\ ,\\ �' - --- r 1/ / ) 1 I J / / / /�! / I // i __�� 1 1� \II I Q �\ / � ,- \ ) \\� / \\ \ 3id _ - _- II / 1 1 \ I l l l I / / -5 / - - \ \ \ \ \\ \ \ — _ — _ - - — _ /,/, io_ _ = - / / � �_ 7 — / / V// I , I I / I (\ \ / ----) I \(1// /// �/ ' .-J \ 1 \\� \\\\\\\ /j/�o \\\\\ \ —\ ` _ 1 _-_--� -- � _=_ --/ / - — —�� /, 1 \ lbw "146�4, I,/ /� / I (I I I I o 1 \ \ ( / -__/ /// ( I I/ � / / - �\ \ \ ~\ \ \\ �/ ' \\ \\\ \\\ \ __- _-_ /%— �_- /' _ --- -f' z /�i' / (I ) I -a i -4' 454g4 / l I I I I I I \ 1 \ \ \\ \ \( / /� /� / ! / 1 / / -15° ~ \\ / - _ - - - -_- - _ --� - - - // / / JP9 �8 I I I J ( \ \�\ \ \�\\\ (� _/// I 1 r / I I f / / _/ \\ \ \ �- \\ \ \\ ✓ �\ \�\ \ \�_� \ �_ Jam' r / � — —�\\\ —\/ //// �� --- f / i \ 1" 5v /�/// 1 — / / % (/ l / I i ! — \ \ \ \\\ \\ ` —r/ �Q I , ^-/ I� \ \ \ 1 \ \\\ \�//� \\\\ \\\ \/ r / /10 _ _--_— \\ \f /////l/ /off - _— ---� �//// / / / ( / ( \ \ \\ \ \ \ \\\\\ \ / / I �' _I- ''=� \ \ `— l \ /// \ \ \ \`l — — / — —� \\ / � / --_ i ------ �`��// /19 \ \ \\ < / �/ // r �/J— \ —\ / / \ \\/� \ \� \ \ ��-- \\ --- — / I ( / --_ — \ \\/\� /\,:�( // //� — --- ——�,'V�/ j mil/ /�/ / \ \ I ,8p\ \\ � \ I I \ \\\\\�\\\ // NJ—/' I l ` / �\ >D 1 \ \-- \ \ —��° \\ \\\ "I - ) 1 \I I , — — \ \ \\�\� \//^JJ/ / / / ----- /-� — — - 1 Irk / / \ \ \ \ \- \ \ N / / ' / / — / GCS / - / /- \ w \ \ I ,�, -.,\- - \ 1 1 \\ // \I /11 _ 1.11 = \ \� �\ \ \\ \ \ 1 I J / / I I\ 1\\\ \\�1\ J�/ ///-`-//// - / 1/ , \_ \ I I / \�\-\- �\ I 1 1 \ \\ \\,/ 1, `l� '7,�,_ / _ — �_-1 /�/i � \\/,}� \ \\ \\ \ I o III r I (( I I 1 I \\\,\\-- I ll� / / I / 1 /' �/ \ � 1 \(\ 1- \ �/� \ \ ~ � - \\� \� \\\ / \ \\�\ I I �Q C\\F�a�0,i5L �` / / � _//� _------- j // / Id (\ \ \ \\ , I I I / / I I I \ \ / /� y �i— I \r �1 I \ �-J-/ \ \� —�� \ \ 710 / ) \ \ \�� / -—`� / / / / _1 \ \ �/< )1) / / 60 - \\1� \ I\ \ 1 \ \ // / / / -��- ��r \ \ \ I I I ( I I \ \�\ \\�\ / ! / / / / Aso \ \�- \\ \ ) ( I\ \_/� / _ ,-- - --,�- \�� - \\\ \ ( / \ \ \\ \ \ \ ( (/ r \ �� / \ \ \ \ \ \ \ I o I \ \ if I / / / I \ \ \ \ \ \ \ \ \ / / / � Z / \ \ \ )\ / I \� / -� 1 I \ — ��o/- --- '-- - \ ��- \\ \ \ \\ \--/ \ I \ \ \\ \ \\/) //-� / / .Clt3� / / //�-\� \ \ \\90, � \ \ \ \ 1\\ I � I \ \ ( ( J \ / / \ � � —\ \ ( \ / \ \ \ \� \ \ \ \ \\ \ II / / \ \ \ \ \ \ �s \ \\ \ \ \ 1 � II I -/ ( I /' \ \ _/ -� ---_-�,\� \ - -- / \ \ /J( /--- / / J s\� \ \ \ � \ \\\\� \ 1\ 1 \ \\\�\ \\ 1 I J / J ` \ \ - c \ \ \ \ \ 1 \ \ \\ \ 1J / l r / !( a 1 I \ \ \ -� " �f \ ` J --_ - - o 1 /�- \ \ \ \ \/ �/- \\ \ \` \� \\ \\ \ \ \ 1 \\ I I 1 I I I / (� ��z �/� J/-/ _ \_ 1 \ -/ ` - \\ \ \ —`�' \\ 1 I W ( \ \\ \ % / l I / f I \ \ \ \ \ \ \\ \ IoI 1 \ r II % / -�/ _ \Y \©� \ \\ \ // , - \ \ - __ \\ _, v �., w�� / � � \ \ \ \ \ \ \ \\ I \ I I / J(\ I _r ^ �l des n \ L�r - - - � - � - � I (/ J j \ �/ % // / V J� � I / - / � \� \ \ �w --- \ "I \ \\ \\\ \�\ \ \ I I I 1 I I I J /� f \ t ) \ / /-- f \ \�� == - \�\ \\ \ \ / \\ \ \\ \\�\\\ \� \ \\ \\ I I I I 1 1 I to I I J //I JlI lI / - 1�� // J / /� ems. \ �sbrP� \Y •o� �/ / \ \ \ \ (� \� _-/ \�__�� / \\� / / / �_/ /�� ( / / / / 1 \ \ \, — \ \ \ \ \ 1 I I I ((—i / / /\✓ + \ \ I / bli{R,hraW / / - llr ,— — \\ / / \ — I ) ( \ \ \ 1 1 \ \ I I /) III I / \1 1 \ \ \ \ \ / \ � / Mtn J \ / � \ \ \ � \ ( � � \ �\ \ \ � \ \ \ \ � \ \ \\\ \ \ � I I I ( ( / o � Al>Channel #�> ( � / / \ � \ � ` \ ` \ ` \ \ \ \ \� \\ \\ \\\\\\ \1 I / r ^ >> \ \ / / \\ \��a — ---�\ ��� =\\\\\ l \ /J / / / / l ) \ \�\ ��° � \ \ \ \ \ \\ \�\\ \ \ I ( / / III \ \ / < \_ \ \\\„� _ \ / \ d� / / \ v A \ o , -/ \ \ A A \ / � v A / �, --. _\ \ \\ \ \ \ \ \ \\\ \ \ \ \\\ \ \� I I I // / / I / \ \ __- —_ \ / / / \ \\ 1 / — \ c \ \ \\\ \ ��,, \\ \\\1\I III �I /� /iJI1/ 1 I / I I J I 1 -I I , ° / -- - o ' \ \ �_ /\ \\ I /� - �\ 9/ / /' /J /\ \ \ � 1 \_, I- j \\ \ \\ \\ I I /) I, I / / r I 1 / 7so� y /�_\\ \ \ / // \\ --/1) ����, - // / 1 / ) J r/ I J \ \ I I I J SDMH 5 ,/- \ J 1 ) \ � _/ / \ \\ \ I r - ( I \ \ \ )I W( ( / \I r o �nt5- l V ,�,a� & a,o / \/ J \�, I1 \\ \ 1 1 1II I( �o 1 II / ( /�/ 1) / / I / ( I 1 /-\ ( \ \ / i ( ` / \ / I ) I 1 \ / / I �/ ! ( \ J l I 1 I / l I / I l > / y + >�ha el #� 0 I FIL IN REA TO DRAIN �� a a�� \ �\ \ \ \ / /) \ - v / - / /' / cz- / ) � \ l / �N ITC TO YI3 YI3 `— I I / ,a , 'A 1j, \ I 1 \PIN 4s54�sa-ss17/ \ Go 11 I I 1 \ \ 1 / I I 1 I ` 1 / ( / \ \ YI4 \ \ r ) - - \ / � GREYM?aOK HOMES ,Ete o � 1 I \ \ \ \ `I I � \ � I -) \ 1 I / G � I 1 �-) � -- - / I - 1 ` \ - 1 \ 740- o �& J � J �� / \ \ \ D.B. 276 Pg. 1654/ 1 I 1 \ \ 1 \ I I I 1 / I I �-�- _ �- \ \ \ \ I 1 1 / / / \ ,. -\ ,\ /- Lt l \ \ \ \ \/ / \ /,�` \ \ \ \ I I/ IIJI 1/IJ ►1IIII / \-� I ) I 0 qAS R V!.' — / c �c \ \ l << \� 1 ((/\ / -- ✓�J J add&fV ~� / �`\- - \. / 1 \ \ -s�o 11 / / c� \�) //J// / /// //// /! _ . J� ( 1 1 1 / 6 Ac. \ \ - \ �` �< \\ \\\ \ / I I / \ �^ ) \ \ / �' / - / // / // / �/ - \ \ 1I I I ( I / ! J / / / / / / 3 \ I I I Air atnYl�3 //// -\- \ \ � 1 /// �\ - \t " �/ -� \ \ 1 ,�, / - / // /// // /( r r - / - l \ \ \ I ) \ / / � -- \- \\l 1 1 I I _ \ \ \\\ \\\ \ \ I / \ -- /l - \\ \ \ \ ' / / -- � -/ // / / � f// � �\\� \ l I I l \ I 1 I / / ( / ' 1 \ =. 3.40 -AC / o \ \ � ' � \ _ \ o. ( \ 7 / /i / _ III ( / / / area �4 1 \ I l� / / iso - / / Mly - \II I I I 1 A \ \-\-r -- \ -� \ I I I ( \ \ /\ \\ \-^ (/ \ \/ l c \ \ � t1\ / I // /, - i//// / /\ 111 I I I / I / �\- 80 � / / - \ � p1 l / � - / I I /// /� �/ �i// , 1 /i/�� -Ta�� \\ / / / / 1 I `/ \- l / / \ \ \ ! ! ! l l / // - - / // `'� /ii /// `` \ ��\ I I I I 1111 I l / J ( l \ \ 2., / - \ / - \ \ _ r l / / ) \ \ -�l J / \ \ \ \ I IIII ! / //// /// / \i750/%/// �� 7 \\ \\\ \ I I I / / / / - T � % J� / -� - 1 I \ / / \ �/r / r�� ( // ////r /��i//// /—_ \\ \�\ \11 / \ — \— �/� / \ I II I� \\ \\ \ 11 1 Il r l % / I / \ I! I l / L_ / \ Existing 14' Wide Drivew y AcEe ( / / / — — // \ \ \\\ \ / o \ / — — ` J \ _ 7 1 I \ \ \ — I- \ \ ( / / _ _boa \ \ _ A/ / f \ Easement per DB ,6J'2 P� T�6. / I I III (( / I �o - - - _ . 760'/ // - \\ �� \\ \ \� 1 \ 1\ \ \ 1 I I l \ I \ \ \s° \ \ r I I / \ \ >� / \ \ \ I I ( I 1 I 1 I I j\ ,moo JB e - / / - _ \ \ \ \\\ \\\\\R � -,\�\I\ 711 1 I 1 J ( I I I / \ \ \ �`�9 - \ I \ \ ' / // J � 1 J / / J I II III I _ /, -\ \ \ \ \\ "I \ II \ \ \ \ \ 1\ / = �/ / / — \ \ \ \ \\\ \ I\ o / l / ( I ( I \ \ \ 11 I\ ( I ! a /// - �70 / \ \ \ \ \\ \ \�\\\\\� \ ,\\\ \ I I ) ( - 1 I ( \ I I ) I o� I e$ owl. _ ( / \ /- \ I 1 \\\\ \=----�i�� \ \ \\ \\\\) �w \11\\\\\\ \1I I \ ( I I rl //\\ \ .� o \ \ I \ \ i \ '')) / l J FES7 > / \ \ \ \(/� \ \\ \ I � / _ \ \ I �2 ( \ / - �_ \ \ \ , \ \ i ��° -_-- \ \\� > Jr�/ ` \� I\ I I\\ 11 I I 1 I I \ ) I I \ (\ \ \ � �',0: v ` ` %//� f� _ �- l \ \ \ \ , \- (� \-- C� / / \ \ \\ \ \\ / / --- \ \ \ 1J(1� \\� \\\\\\ 1 I 1 1 , 1 �) /' 1 I\\) \I\\1 \\� - \ \ \ \ \ \\ 1(()f%11S �� \ \ - - - / - -"- ,�-- -:W ---,,, - -, , \-,-�-� --��-- \\ I I\\\�\\\\ \ \ I I 1 / / / l� --- �I ---- f - f � (a /t--\-w J - \� / \\ / 79 - - - \ - \ 7 • ' �\�� \\�1)\ / 1 \\l\ \ 1 111r / I ! / / J - - - - - \ � < /_ - _ --/- �� E~ c � ° / \ — \ \ \ \ ��'�0., \ \\\\1 \�- I1 III ► III / / � - — /^ .� \ --1 \ \ I - \ \ \ \ �'� w \ \ 1 \ \Ill l l I I I I r^ I ( / / / / s'o f \\\d \� # _\ \ \ \ \- \` \ \\1 Ill / I II I / / / ) � ��- /--/ �/ %// / --r /� / _- - __/ /� / q a w �- -r \ '- - : \ r ' &I � \ � � � \ \ \ I I II�I� I ��J\) /�/ I l 1 I / / / v / / � - - l (^ \ / - - ¢0 1\ �qv i \ ' _\ / �G �- I IL \ - II III�Ir(/�//!/ / / ( / 7g0 C� i / // / / --A) /- _/ -- -- ° / - -/ �- C[i\ \ \ \ I I 111 /)III /� / / / \ / _ / \ / I / --� / _�� �`� < �� oo s \ \r\ \ \� III 11I\111�//r�ll / / 3/ / /- / /// -- cVOq \ Z .\ \ u� $ G l.) D, J \ ti I \ ` 4 / > I / / / — — — — / \ J `- / — r / / / I / / '_- — \F. / z�m 0) 10 �E' \ \�E-;� -� �� \ \ -'\ \ \ I I II IIlI \V//////_ / / / - ( / / -- // - � / r \ - \�� ( / z m -- 3 ) \ *- I 1\�///// / / / i -- � o N a�.� �U \ \\ \ (�^ \ \\\ I / I II1\`�/ / � / I � � / / ( I � ( / /-' / / /\�- ^�/ \�J / \ �` \ \ _ � ` \ > �- -) I �\ \ 1 I I I / ( / / / I ( / ) I / / - - �-39 / / / _ -/ l \ a \ \\ \ I I3 J °w \�\III I \\�)/)/%I l I -/ /' / < 1 ( I / / // L = - / �� PN46 s$d1-. - _// / — — / 1-1 \ � •�\ c/ \ \ \: I 1 I 1 \\\ \�,\\/ // / r / O � I ( 12 / / -- �/ '� / O A �9.��s f /� - N78° 2s' Sw\\ \1\ -- \ `�\ � a t II I l ' \ // �� / / Areato�FES1 �'' I\ \/ ( \\ / �1;;'�- \� �` �- �°--//!r --~ /-_� - \ \\ - // 1-1 �I I I U, �� / / - 2.46 Ac. \ 0' /,... �.. EMSEMENT\ \ ° f j-'-/' ' • \ / — ' / — — J — \ \ — _ --I-- 544 \ co\ �' i/ I \ �� / / / / I 1 ) \ \ `> -- / / / -, - \_� /� /- ---/ r �_ /� �--/-//---\ �-- �_-- \ 0'-, \ / -- N�� 1p,3. 1 \ �-\ \�\ qE� ;-/ / I I Z / / / // ( -) /J 112 .--- / / � / �' J,-\ �- �o� J �'-% � j / -� \ \--_ O8„1 \ O \ \ \\ \ 1 ( l \ \ \ \� / / / 1 \ ') - .1. / / \v` ��`�-1 - \ o SP \ J� / / L1 / /- - / /-� -sa - __\ �_� \ �r \�\_ \ \` \ \ `-/ / / / \ �*J \\ ( / ( \ �\45T?o��g� - - - ram\-� / \- / / / \ \ --tea' , - / / / \ / '\- / \\ —8p — \` — n! ® I 1 /J ) (°° \�\ \ \ \ �l�J 0 l 1 1os; FEsz / ( �/� \ p�6a P9� \ -� —/ \_ _--- / / / / / i / \ — —\ \ \ \ -\ \,— \ O I \ / FEsi / � \ —� \ 1 I I� /\\\— N-�� ��— \\ / -- j \--/ —`_// \ / /\ \ \� 1 \ I \ \ \ -\ ! / / / _—\ \ \— \ \ </ �°,/ �\—x �— -- — /\_\ /�/ _ \ � \ \ \ SA \ P/N 4 \ \ -h173� \ „W �'�21\W IV ..3 •x � I I \ / \ / J ) I / o ' I / / / — — — 1 -� � / 654,��' 1)0 V \ � \ \ 1 \ \ \ ` < \1 � � � / ) — / Q, — — — — — — — — — — — � _ _� � / — — \ NDR4� 654-s,_ .C�1.49' \ a A� 5 ` — — — — — — — — — _ \ \ — JoHNS 4os2 �D� •��33'�y� ( l / I I \ I / / — m� /�\ \� / �/ /�309I94_� \ \ \ \ \ \ \� \ \\I / -�✓/ / (- , r- -- i - - -\ J -- - J \ \ ° B' °�' TIRE ) \ / / / / - \ / Z e• 52 \ \ \ \ 1 c �\ — _ / i ^ / _ = / \ ter/ S \ \ \ N�2. 511 47" ) % � \ J � — \ �\ �. \ \ �' I263 WA \ / — 9.72 \ � I C � / � / < — _ \ � / O O , \ \ \ \ \ \ \ I (Z \ \� �~ � f % �� / � — ( — J ` � _ I \ \ I ) , ) \ I I � / / < \ �\ \ I \ \ \ \ \ \ \ � \�-,� --- ( ®/ •'% \ l \ 1 I \ \ 1 - \\\ _ 1 " \ \ \ \ 1 _ _f-1 / 1 46 \ ( \ l ( \ \ \ �) I I \ \ � j - \ \\ I I l�� - - o \ so ioo - . I \ - \ \ 1 \ 1 \ \ \ JII \ ,— -- // l_ 94A,2 I ) °yi-531P9 21p2 \ \� \ \ � l\ I \ \ I l / -\ \ \ I I I / I \ /��\ \ \ ) LI/ I\� --\\ \ \\ — J J\ I \ \ \ \ \ \ \ J, 4a54-Sg� T — O / L — — — N C� \ ` — — PIN \ BO 7' g I O g' \ 1 \ ( \ �\ \ \ \ l \ 1 I I MEs ss46 - } — \ 46 NR \ \ \ \ ' ,� \ \ \ \ — \ \ \ 1 ( I \ -/ �� ) I I J \�,�,�`16_V,, \ D.B. �167 JONSO / J _ _ _ P`N ,t w' d9 332\ \ \ \\ \ \ I I I / \ �/ I ( / / \ �/ JnDw W_il"dt�S I,�I�Ivw�\ <� r =� -— _ \ 1 0\ \ I \\ \ \ r� Pg-' 1259 NI ( \ — \ SE � ��E \ \ \ \ / I\ \ J) \ \ \ 1 1\ \\) \ \ I 1 \ // I // / I / 11 �- �J / �� // � �—-=�-:-jr nct>r 0 e� � PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Approved: Date of Issue: z 0o r • � U N 73 r W � Q " Cd 3 d� 3 A � a 'N" 3 � v �000 W r.�~ t! 2'Z U �U" g,. a, 0 0 U R. UZ Ica �~wa A A a) 00 A) "r-z ao4 O � �1 A) � o a �� 0 Z:z = U I'-- 000 O O O � -) �Loz U �� x ~ O LL-I 00 -i r,-) m - � ^ O � 0 ��� LL-o 0) �4 O� o w O Ow a_ a Cn . F-4 �J F-4 HO ;�-J Pq co O W 110-4 � � � � g4 '—' O ==ate w � Q -, • V I E--+ p � Imo-+ Q O W � � �Oy F•�•1 1• L4 O H OQ� Pq � = � �-4 w���� = >--4 V) I � � � = O O ^^ M• -4 ,,,,Mil \\ \\``` -Iff - _ �� 10 _' _ '_ �_10. t% .Z* .� - ,,,,'~�b��� REVISIONS BY Date: 12/03/20 Scale: 1 , -100 FT Drawn: CLF Checked: DLM Project: 2021 -01 -08 Job: Sheet DR-3 of 4 Sheets