HomeMy WebLinkAboutNCC212780_ESC Approval Submitted_20210510IREDELL COUNTY
PO Box 788
IREDELL 349 North Center St.
COUNTY -NC Statesville, NC 28677
Permit Type: EROSION CONTROL - PLAN REVIEW
APPLICATION NUMBER
316128
Issue Date: 04/01/2021
Parcel Number Street Address Jurisdiction
4742589777.000 IREDELL
Owner Information
Applicant Information
Contractor Information
Name: MTS PINE FOREST LLC
Name: EASTWOOD
Name: EASTWOOD
CONSTRUCTION
CONSTRUCTION
PARTNERS
PARTNERS
LLCIEASTWOOD HOMES
LLC/EASTWOOD
HOMES
Address:
Address: 2857 WESTPORT ROA❑
Address: 2857 WESTPORT ROAD
CHARLOTTE, NC 28208
CHARLOTTE, NC 28208
Phone:
Phone: (704)399-4663
Phone: (704)399-4663
Project Description
Dogwood Grove Lots 1-70 STVLE-2021-064
Conditions
Permit Details Fees
PLAN REVIEW Amount: $2,275.00
I hereby certify that all information in this application is correct and all work will comply with the state code and all
other applicable state and local laws, ordinances and regulations. The respective department will be notified of any
changes in the approved plans, a change of contractor, and/or specifications for the project permitted herein. This
application becomes a permit only when validated and approved.
Date: 04/01 /2021
Signature of Owner/Contractor
This permit shall expire three (3) years following the date of approval if no land -disturbing activity has been
undertaken.
Permit Number 316128 TOTAL FEES: 1$2,275.00
Iredell County Planning & Development
Erosion Control Section
349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: April 1, 2021
LETTER OF APPROVAL
Marc Battiste
Eastwood Construction LLC
2857 Westport Road
Charlotte, NC 28208
RE: Project Name: Dogwood Grove Lots 1-70
Acres Approved: 12.70
Project ID: STVLE-2021-064
Project Location: PIN: 4742589777.000
Submitted By: Eastwood Construction LLC
Date Received: 3/23/2021
Plan Type: New
Dear Mr. Battiste:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable arrdirereby issue thiTt er ofApprova . The Certificate o — - - -
Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval as is required by Title 15A NCAC 413.0129 and Appendix
H of the Iredell County Land Development Code.
Title 15A NCAC 413 0118(a) and Appendix H of the Iredell County Land Development
Code requires that a copy of the approved erosion control plan be on file at the job site.
Any amendments and/or revisions to the approved plan must be reviewed and approved
prior to implementation in order for the site to remain in compliance. Failure to submit
plans for approval may result in administrative actions and/or penalties as indicated in the
Iredell County Land Development Code. Also, this letter gives notice as required by G.S.
113A-61. l (a) and Appendix H of the Iredell County Land Development Code, of our
right of periodic inspection to insure compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Iredell County Land
Development Code and the Sedimentation Pollution Control Act of 1973, (North
Letter of Approval
Dogwood Grove Lots 1-70
April 1, 2021
Page 2 of 2
Carolina General Statute I I3A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does
not supersede any other permit or approval. It is the responsibility of the applicant to
obtain all other required permits or approvals.
As of March 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC)
under the NCGO10000 Construction Stormwater General Permit. This form MUST be
submitted prior to the commencement of any land disturbing activity on the above named
project. The NOI form may be accessed at deq.nc.gov/NCGOL Please direct questions
about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will
be emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In
addition, it is required that this office to be notified of the proposed starting date for this
project. Failure to notify this office of the starting date may result in a Notice of
Violation and civil penalty. Please notify us when you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
44 a))I-f
Landon Clontz
Erosion Control Inspector I
Enclosures: Fact Sheet on the New NCGO1 Permit
Permit