Loading...
HomeMy WebLinkAbout07 Cornelius Monthly SCM ChecklistStructural Stormwater Control Measures Monthly Checklist 1 Operation and Maintenance Program for Wet Pond April 2021 Name of Project: Westmoreland Athletic Complex Address: 8430 Westmoreland Road Number of Stormwater Control Measures: 1 Responsible Party: Town of Cornelius Address of Responsible Party: PO Box 399 Cornelius, NC 28031 Task Schedule Notes Forebay inspection and cleanout Monthly inspection. Remove sediment every 7 years or whenever the sediment volume exceeds 50% of storage volume Removed sediment from Forebays in June 2020 Volume measurement Yearly – Dredging needed every 20 years or when 25% of permanent pool volume has been lost Completed measurement 5/18/2020 277,153 gallons at mean level Bank mowing and inspection/stabilization of eroded areas Monthly Inspected Outlet/inlet inspection and cleanout Monthly Inspected Unwanted vegetation and trash removal Monthly Completed Visual inspection of water quality Monthly Inspected Inspect / exercise all mechanical devices, valves, etc. Yearly Completed this month Inspect for structural damage, leaks, etc. Yearly Completed Rodent management As needed N/A Security As needed N/A See Foster Lake and Pond Management Report Attached Structural Stormwater Control Measures Monthly Checklist 2 Operation and Maintenance Program for Dry Pond Name of Project: Westmoreland Athletic Complex Address: 8430 Westmoreland Road Number of Stormwater Control Measures: 1 Responsible Party: Town of Cornelius Address of Responsible Party: PO Box 399 Cornelius, NC 28031 Task Schedule NOTES Forebay inspection and cleanout Monthly inspection. Remove sediment every 7 years or when sediment volume exceeds 50% of storage volume Sediment removed in June 2020 Bank mowing and inspection / stabilization of eroded areas Monthly (maintain 3 to 6-inch grass height) Inspected Outlet / inlet inspection and cleanout Monthly Inspected Unwanted vegetation and trash removal Monthly Trash removed Inspect for structural damage, leaks, etc. Yearly Completed Inspect / exercise all mechanical devices, valves, etc. Yearly N/A Evaluate sediment level (remove as needed) Yearly Removed June 2020 Security As needed N/A Structural Stormwater Control Measures Monthly Checklist 3 Operation and Maintenance Program for Bioretention Name of Project: Westmoreland Athletic Complex Address: 8430 Westmoreland Road Number of Stormwater Control Measures: 2 Responsible Party: Town of Cornelius Address of Responsible Party: PO Box 399 Cornelius, NC 28031 Task Schedule Notes Inspect banks and surrounding drainage areas for erosion and stabilize if necessary. Monthly Inspected Inspect/Clean Inlets (sediment in pipe, damaged pipe, blockage or erosion) Monthly Inspected Inspect/Clean Outlet (blockage, bypass, erosion or damaged) Monthly Inspected Perimeter mowing (3 to 6-inch grass height) Monthly Inspected Inspect for proper drawdown / clogging Monthly Inspected Trash removal Monthly Completed Pruning Yearly N/A Mulch renewal Yearly N/A Mulch replacement Every 3 years N/A Inspect plants, replace as necessary Monthly N/A Test Phosphorus Index of soil media and replace if over 50 Every 2 years Bio1 P value- 19 Bio2 P value- 28 05/29/2020 Replace pea gravel diaphragm As needed N/A Remove sediment or other organic material As needed N/A Grassed Bioretention Cells only Mow basin to recommended height in alternating patterns to prevent compaction Weekly to bi-weekly during the growing season, as needed other times Inspected Light fertilizing to establish healthy roots Only during the first 2 years Inspected Aerate and dethatch basin floor Every 2 years Inspected