Loading...
HomeMy WebLinkAboutWQ0010878_CEI NOV-2021-PC-0263_20210505DocuSign Envelope ID: F81D7A89-12B4-499E-A464-69A488A4E8D3 ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality May 5, 2021 CERTIFIED MAIL 7018 1130 0000 1608 0398 RETURN RECEIPT REQUESTED Mr. Nilendu Srivastava Blue Ridge Preservation, Inc. 12 Murphy Dr. Nashua, NH 03062 Subject: Notice of Violation (Tracking No. NOV-2021-PC-0263) Blue Ridge Preservation, Inc. - Wastewater Irrigation System Permit No. WQ0010878 Watauga County Dear Mr. Srivastava, On April 14, 2021, staff of the North Carolina Division of Water Resources Winston-Salem Regional Office (DWR) performed a follow-up inspection of the subject wastewater irrigation system. This inspection was conducted by DWR staff person Patrick Mitchell and focused on follow-up on noncompliant items previously noted for the subject facility. The following violations were found to persist and therefore warrant your attention and action: 1. The three valves serving the activated sludge return continue to be in disrepair. One of the three valves had been removed completely. It should be noted that this was included in a Notice of Deficiency dated November 26, 2018 and has yet to be properly addressed. Failure to maintain the proper operation of these valves is impacting the wasting of sludge from the system. Please repair and/or replace these valves as soon as possible and notify this office when completed. 2. The staff gauge serving the 500,000 gallon effluent storage tank is not operating properly. A properly functioning staff gauge is important for monitoring and maintaining adequate freeboard in the storage tank. This item was also noted in the November 26, 2018 Notice of Deficiency and has yet to be properly addressed. Please have this staff gauge repaired or replaced as soon as possible and notify this office when completed. To avoid further enforcement actions, please address the violations described above as soon as possible and notify this office in writing when completed. This office request that you submit a written response within 30 days of receipt of this Notice. Please include in this response an outline for actions taken to remedy these items. If you wish to present an explanation for the violations cited, or if you believe there are other factors which should be considered, please include such _1121,...,E\R- North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 336.776.9800 DocuSign Envelope ID: F81D7A89-12B4-499E-A464-69A488A4E8D3 information in your response. Your written response should be sent to my attention at the address shown on the letterhead. Our office appreciates your attention to the above listed items. If you have any questions regarding this Notice, please contact Patrick Mitchell or me at the letterhead address or phone number, or by email at patrick.mitchell@ncdenr.gov or lon.snider@ncdenr.gov. Sincerely, c—DocuSiigned by: L-0w, l . Jn.l4lt' 14 9 5C9 EA. . Lon 1. smceer; Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO cc: Mr. Scott Vasgaard, ORC (Electronic Copy) Mr. Cony Arbogast - 136 Vergil Day Rd., Boone, NC 28607 Watauga County Environmental Health (Electronic Copy) Laserfiche File WQ0010420 WSRO Electronic Files Page 2 of 2 Compliance Inspection Report Permit: WQ0010878 Effective: 01/06/20 Expiration: 04/30/26 Owner : Blue Ridge Preservation Inc SOC: Effective: Expiration: Facility: Blue Ridge Preservation WWTP County: Watauga 639 Whispering Hills Rd Region: Winston-Salem Boone NC 28607 Contact Person: Peter N Ostergard Title: Phone: 828-262-5584 Directions to Facility: US421S/E King St, R Bamboo Rd, L Little Laurel Rd, 3R stay on Little Laurel Rd, 3L Heavenly Mtn/Whispering Hills Rd, L on Whispering Hills Rd. System Classifications: SI, WW2, Primary ORC: Scott Richard Vasgaard Certification: 18595 Phone: 828-297-6234 Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/14/2021 Primary Inspector: Patrick Mitchell Secondary Inspector(s): Entry Time 12:30PM Exit Time: 01:30PM Phone: 336-776-9698 Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Wastewater Irrigation Facility Status: ❑ Compliant Not Compliant Question Areas: ▪ Miscellaneous Questions ▪ Storage (See attachment summary) Treatment Treatment Activated Sludge Page 1 of 4 Permit: WQ0010878 Owner - Facility: Blue Ridge Preservation Inc Inspection Date: 04/14/2021 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: On April 14, 2021, WSRO staff conducted a follow-up reconnaissance inspection of the subject facility. The primary purpose of this inspection was to follow up on deficiencies noted in the November 26, 2018 NOD and in the February 5, 2019 follow-up inspection. The inspection found that two of the items noted in the 2018 NOD and in the 2019 follow-up inspection are yet to be properly addressed. The violations listed below require attention and action. 1. The three valves serving the activated sludge return are still in need of repair or replacing. The ORC indicated they have had issues with finding a welder to make the repairs. Request the valves be repaired/replaced as soon as possible and that WSRO be notified when completed. 2. The staff gauge on the 500,000 gallon effluent storage tank is still not working properly. Request that the gauge be repaired or replaced as soon as possible and that WSRO be notified when completed. * This inspection focused only on review of items requiring follow up from previous inspections and was not a comprehensive inspection. A comprehensive compliance inspection will be conducted within the next 12 months. Page 2 of 4 Permit: WQ0010878 Owner - Facility: Blue Ridge Preservation Inc Inspection Date: 04/14/2021 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Type Reuse (Quality) Infiltration System Single Family Spray, LR Lagoon Spray, LR Activated Sludge Spray, HR Activated Sludge Spray, LR Recycle/Reuse Single Family Drip Activated Sludge Drip, LR Treatment Are Treatment facilities consistent with those outlined in the current permit? Do all treatment units appear to be operational? (if no, note below.) Comment: See summary. Yes No NA NE Yes No NA NE • ❑ ❑ ❑ Treatment Activated Sludge Yes No NA NE Is the aeration mechanism operable? • ❑ ❑ ❑ Is the aeration basin thoroughly mixed? ❑ • ❑ ❑ Is the aeration equipment easily accessed? • ❑ ❑ ❑ Is Dissolved Oxygen adequate? ❑ ❑ ❑ • Are Settleometer results acceptable? ❑ ❑ ❑ • Is activated sludge an acceptable color? ❑ • ❑ ❑ Comment: Three valves need repair or replacing. See summary. TANK2 - Storage Storage Type? Storage amount? # At what point is side -stream wastewater returned to treatment? Is there a Spill Control Plan? Aerated or Mixed? If aeration is present, is it adequate? If present, are diffusers cleaned regularly? Is influent structure acceptable? Are banks/berms free of seepage and erosion? Yes No NA NE Aboveground storage tank 500000 Gallons NONE 0000 0000 Page 3 of 4 Permit: WQ0010878 Owner - Facility: Blue Ridge Preservation Inc Inspection Date: 04/14/2021 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Are banks/berms free of excessive vegetation? Is pond lined? Liner Type Is liner acceptable? Are baffles/curtains acceptable? Does the pond have a freeboard marker? Required freeboard? Actual freeboard? Is there suitable grassed vegetation? Is the vegetation maintained? Is the area free of excessive weeds and/or woody species? Is the area free from signs of overflow? Is color acceptable? Are floating mats acceptable? No excessive buildup of solids? Are aerators/mixers acceptable? Is effluent structure acceptable? If present, is pond cover acceptable? Comment: Staff guage not working properly. See summary ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El El El El El El El El ❑ ❑ ❑ ❑ El El El El El El El El El El El El ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ El El El El El El El El El El El El Page 4 of 4