HomeMy WebLinkAboutNCC190526_NOT Closeout Documents_20210503North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Catawba Project: Marshall Steam Station Dual Fuel firing River basin: Catawba
Person financially responsible: Duke Energy Progress, LLD - Bennett V Deese, Project #: CATAW-2019-021
Project Manager
Address: 410 Wilmington Street, Raleigh, NC 27601
1. Project Location: 8320 East Highway 150, Terrell
Pictures: Yes - Digital
2. Weather and soil conditions: Sunny, Workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Chris Randazzo
Inspection report: Sent Report
9. Corrective action needed:
Title: Sr EHS Professional
Date given/sent: February 10, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination.
Reported by: Tyler Pearson Others present:
Date of inspection: February 09, 2021 Time arriving on site: 9:00 AM Time leaving site: 12:45 PM
cc: