Loading...
HomeMy WebLinkAboutNCC190526_NOT Closeout Documents_20210503North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Catawba Project: Marshall Steam Station Dual Fuel firing River basin: Catawba Person financially responsible: Duke Energy Progress, LLD - Bennett V Deese, Project #: CATAW-2019-021 Project Manager Address: 410 Wilmington Street, Raleigh, NC 27601 1. Project Location: 8320 East Highway 150, Terrell Pictures: Yes - Digital 2. Weather and soil conditions: Sunny, Workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Chris Randazzo Inspection report: Sent Report 9. Corrective action needed: Title: Sr EHS Professional Date given/sent: February 10, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Tyler Pearson Others present: Date of inspection: February 09, 2021 Time arriving on site: 9:00 AM Time leaving site: 12:45 PM cc: