HomeMy WebLinkAboutNCC190526_Notice of Termination_20210503Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 5/3/2021 9:41:51 AM (NOT Submittal)
Approve by Georgoulias, Bethany A 5/4/2021 8:49:54 AM (NOT Request Review- NCC190526)
• Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 5/4/2021 8:49 AM
The task was assigned to Morman, Alaina. The due date is: May 6, 2021 5:00 PM 5/3/2021 9:41 AM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of
NCC190526
Coverage (COC)
Enter the Certificate of Coverage Nmber
No.*
2020 Annual Fee Status
PAID
2021 Annual Fee Status
Nbybeblank (if not yet billed).
Information associated
with this permit:
Project Name
Marshall Steam station Dual Fuel Firing Project
Address
8202 E. Highway 150, Terrell, NC
County
Catawba
Latitude
35.5966
Longitude
-80.9718
Permittee Listed
Duke Energy Progress, LLC
Legally Responsible
Bennett Deese
Individual
NC Reference No.
NCG01-2019-0526
E&SC Plan ID
CATAW-2019-021
Original NOI
11828
Tracking No.
Date COC Issued
6/6/2019
Prior Rescission
Cate populates only if COCwas already rescinded at tirre of submittal.
Date
Reason for Rescission/Termination Request:
Reason for
F Project Closed -Out
Termination of
r Sale (Another Owner/Operator obtained a new COC)
Coverage *
O Mistake or Invalid Coverage
r Other
Ad d i o n a I Nbre information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Docurrentation if applicable.
Documentation Mist beFDFformat
Project Close-out Information:
Final Close-out 2/9/2021
Inspection Approval
Project Close-out 02-09-2021 Closure Inspection Report (CATAW-
Approval 247.25KB
2019-021).pdf
Documentation
Mist be FDFforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
rJ I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Bennie Deese
Title * Project Manager II
Organization* Duke Energy
Date * 05/03/2021
Email for Bennie. Deese@duke-energy.com
Confirmation *
Contact Telephone* 864-313-3470
NOT Certification NCG01-eNOT-Certification Form for CATAW-2019-
Form 31.5KB
021.pdf
Mist be FDF Forrrat
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Additional Email CCd on Notification Errails
(Optional) Robert.Wylie@duke-energy.com
Original Permittee CCdonWificationErrails
Email Bennie. Deese@duke-energy.com
Original Site Contact CCd on Notificaiton BTails
Email Joseph.LaSala@duke-energy.com