Loading...
HomeMy WebLinkAboutNCC190114_Notice of Termination_20210503Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/3/2021 9:28:18 AM (NOT Submittal) Approve by Georgoulias, Bethany A 5/4/2021 8:40:57 AM (NOT Request Review- NCC190114) • Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 5/4/2021 8:40 AM The task was assigned to Morman, Alaina. The due date is: May 6, 2021 5:00 PM 5/3/2021 9:28 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190114 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status OPEN K/hy be blank (if not yet billed). Information associated with this permit: Project Name Marshall Steam Station Laydown Area Project Address 8202 E. Highway 150, Terrell, NC County Catawba Latitude 35.5966 Longitude -80.9718 Permittee Listed Duke Energy Progress, LLC Legally Responsible Bennett Deese Individual NC Reference No. NCG01-2019-0114 E&SC Plan ID CATAW-2019-019 Original NOI 10438 Tracking No. Date COC Issued 4/26/2019 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 2/9/2021 Inspection Approval Project Close-out 02-09-2021 Closure Inspection Report (CATAW- Approval 247.26KB 2019-019).pdf Documentation Mist be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Bennett V Deese Title * Project Manager II Organization* Duke Energy Date * 05/03/2021 Email for Bennie. Deese@duke-energy.com Confirmation * Contact Telephone* 864-313-3470 NOT Certification Marshall Signed NOT Certification for Form NCC190114.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) Robert.Wylie@duke-energy.com Original Permittee CCdonWificationBmils Email Bennie. Deese@duke-energy.com Original Site Contact CCd on Notificaiton Frrails Email Joseph.LaSala@duke-energy.com 34.64KB