Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20220880 Ver 1_Table 1 TIP I-3306A GIS Stream Impact Estimates_20130130
TABLE 1 T.I.P 1 -3306A GIS STREAM IMPACT ESTIMATES Sheet # I Stream # Stream Name I North of 1 -40 (linear ft)l South of 1 -40 (linear ft) I Total (linear ft) 1 1 I 1 0 70 70 Stream 1 Totals 1 0 70 70 1 2 1 1 0 470 470 Stream 2 Totals 1 0 470 470 2 3a Cates Creek 0 115 115 2 3b Cates Creek 140 0 140 Stream 3 Totals 140 115 255 2 4a 80 0 130 130 2 4b New Hope Creek 80 0 80 Stream 4 Totals 80 130 210 2 5a 80 0 130 130 2 5b New Hope Creek 80 0 80 Stream 5 Totals 80 130 210 3 6a 80 0 90 90 3 6b New Hope Creek 80 0 80 3 6c 65 325 0 325 3 6d 745 0 745 Stream 6 Totals 1150 90 1240 3 7a 80 150 0 150 3 7b New Hope Creek 0 65 65 Stream 7 Totals 150 65 215 3 8 1 1 0 80 80 Stream 8 Totals 1 0 80 80 4 9a New Hope Creek 105 0 105 4 9b New Hope Creek 0 85 85 Stream 9 Totals 105 85 190 4 10a New Hope Creek 100 0 100 4 10b New Hope Creek 0 100 100 Stream 10 Totals 100 100 200 4 11a 0 60 60 4 11b 50 0 50 Stream 11 Totals 50 60 110 TABLE 1 T.I.P 1 -3306A GIS STREAM IMPACT ESTIMATES Sheet # I Stream # Stream Name I North of 1 -40 (linear ft)l South of 1 -40 (linear ft) I Total (linear ft) 5 12a 200 0 85 85 5 12b Old Field Creek 95 0 95 Stream 12 Totals 95 85 180 5 14 1 1 0 200 200 Stream 14 Totals 1 0 5 13a Old Field Creek 0 145 145 5 13b Old Field Creek 85 0 85 Stream 13 Totals 85 145 230 5 14 1 1 0 200 200 Stream 14 Totals 1 0 0 200 5 15a 0 75 75 5 15b 120 0 120 Stream 15 Totals 120 75 195 6 16a 0 840 840 6 16b 800 0 800 Stream 16 Totals 800 840 1640 6 17a 1500 0 1500 6 17b 80 0 80 6 17c 210 0 15 15 Stream 17 Totals 1580 15 1595 7 18a 0 210 210 7 18b 115 0 115 Stream 18 Totals 115 210 325 Grand Totals 1 4650 1 2765 1 7615 Note: Impacts based on 40 foot buffer from existing right of way (excludes existing transportation facility- - roadbed, fill and cut sections).