HomeMy WebLinkAbout20210683 Ver 1_PreFiling 30-Day Clock Reached Email_20210503Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, May 3, 2021 12:01 AM
To: info@cbcstoneandrecycling.com
Cc: Johnson, Alan
Subject: Pre -Filing Time Clock has been reached for Hager Dredge - 20210683 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Hager Dredge that
you submitted on 4/2/2021. The ID number for that project is 20210683, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210683
Version *
1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 4/2/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Janice Estep
info@cbcstoneandrecycling.com
Hager Dredge
Dianne Hager
Lincoln
Street Address
8074 Malibu Pointe Ln.
Address Line 2
City State / Rovince / Region
Denver NC
Fbstal / Zip Code Country
28037 United States
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
r 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
fJ Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information. *
Dredge a 30' x 30' area around dock for boat access. Dredge by
barge, haul material off by land through neighbor's property with
permission and is also having dredging done.
Please give a couple of dates you are available for a meeting.
4/5/2021
4/6/2021
4/7/2021
4/8/2021
4/9/2021
Please attach the documentation you would like to have the meeting about.
Hager Dredge.pdf
pdf only
2.66MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/2/2021