Loading...
HomeMy WebLinkAbout20210174 Ver 1_More Info Received_20210421Strickland, Bev From: Chuck Truby <chuckt@cptengineering.com> Sent: Wednesday, April 21, 2021 2:24 PM To: 'Hopper, Christopher D CIV (USA)'; Homewood, Sue Cc: 'Scott Wallace' Subject: [External] RE: SAW-2021-01357 / Council Creek Subdivision / Keystone Group, Inc. / Graham / Alamance County, NC - REQUEST FOR ADDITIONAL INFORMATION Attachments: Revised Wetland Map.pdf; Revised PCN page 4-20-21.pdf; COUNCIL CREEK STREAM IMPACT EXHIBITS 4-20-21.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Christopher: We had Michael Brame go back on site and he determined the end of the stream in question and average width of the stream at the road crossing. His map is attached. Please note that the boundary of the property in this exhibit is from GIS and ours is from an actual survey. We revised our plans and extended the stream buffer. I have attached the revised sheet of the PCN to change the average stream width to 5'. This results in an impact that is less than 0.02 acres. We revised the exhibits related to the rip rap and have provided a blow up of the area across from lot 50. Please review this information and feel free to call me if you have any questions. Chuck Truby, P.E., P.L.S. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, N.C. 27265 336-812-8800 x 304 From: Hopper, Christopher D CIV (USA) [mailto:Christopher.D.Hopper@usace.army.mil] Sent: Friday, April 2, 2021 3:27 PM To: Chuck Truby <chuckt@cptengineering.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: SAW-2021-01357 / Council Creek Subdivision / Keystone Group, Inc. / Graham / Alamance County, NC - REQUEST FOR ADDITIONAL INFORMATION Good Afternoon, Chuck: Thank you for your PCN and attached information, dated 3/4/2021, and for the Agent Authorization form you shared today for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit 29 (https://saw-reg.usace.army.mil/NWP2021/NWP29.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) The property boundary utilized by the wetland consultant appears to differ from that shown on the surveyed plans. Stream SC is reported to be 83 linear feet and extends to the property line used in that effort. A review of LiDAR data suggests the feature may be longer and potentially impacted behind lots 74 and 75. Please confirm the stream offsite does/would not be impacted by the project as proposed. 1 2) Pursuant to Nationwide Permit (NWP) 29 regional condition 7, stream loss in excess of 0.02 acre require mitigation to offset the loss of Waters of the US. The PCN reports 145 linear feet of 10-foot wide stream channel would be impacted by the proposed road crossing. You must provide proof of mitigation credit availability, In - lieu fee program acceptance, or if neither are available submit a Permittee Responsible Mitigation Plan for our review before use of this permit can be verified. 3) Please provide a profile illustration to demonstrate riprap placement below the proposed stream crossing would be compliant with NWP 29 regional condition 8 (Riprap placement). The exhibit would be attached to your permit verification for reference by construction contractors. 4) Additional detail is required for construction proposed for the road adjacent to Stream SA (across from lot 50 on the exhibits provided). Two wetlands and the stream appear to be located within the project disturbance area. Due to the proximity of these resources to proposed construction, line weights are too large to complete our review. Would permanent impacts be required? Would temporary impacts be required? What measures are proposed to protect areas beyond the disturbance? Please provide an exhibit detailing activities in this area. Please let me know if you have any questions. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0. Thank you for taking the time to visit this site and complete the survey. From: Chuck Truby <chuckt@cptengineering.com> Sent: Friday, April 2, 2021 3:10 PM To: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> Subject: [Non-DoD Source] Fwd: Council Creek Here you go. Sorry for the delay. Sent from my iPhone Chuck Truby Begin forwarded message: From: Scott Wallace <SWallace@gokeystone.com> Date: March 31, 2021 at 5:07:41 PM EDT To: Chuck Truby <chuckt@cptengineering.com> Subject: RE: Council Creek Chuck, Attached, please find executed doc. 2 Thx, Scott From: Chuck Truby <chuckt@cptengineering.com> Sent: Wednesday, March 31, 2021 3:47 PM To: Scott Wallace <SWallace@gokeystone.com> Subject: Council Creek Please sign and return to me. Required by the USACE. Chuck Truby, P.E., P.L.S. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, N.C. 27265 336-812-8800 x 304 3 THE LOCATIONS OF FEATURES SHOWN ON THIS MAP WERE FIELD VERIFIED BY MR. CHRIS HOPPER WITH THE USACE ON SEPTEMBER 8, 2020. THIS EXHIBIT INCLUDES GPS LOCATIONS OF DELINEATEDFEATURES. WA 1‐2 (0.008 Ac) FLAG NUMBERS/INFO WETLAND FLAGS = STREAM FLAGS =  Stream Flags = 10 Wetland Flags = 24 Total Flags = 34 Wetland Map Rogers Road Approximate 43‐Acre Tract Burlington, Alamance County, NC Pilot Project 5983 Drawing 5 Satellite Imagery from ESRI and Pilot GPS Data Scale: 1” = 300’ Date: 9.9.20 Revised: 04.15.21 DP‐1  DP‐2  DP‐3  WA 3‐5 (0.004 Ac) SA1 (475 LF) WB 1‐5 (0.014 Ac) WB 6‐8 (0.002 Ac) WB 15‐19 (0.006 Ac) WB 13‐14 (0.004 Ac) WB 9‐12 (0.014 Ac) SC (83 Lf) SD (116 Lf) SB2 (1,436 Lf) SB1 (72 Lf) SA2 (520 LF) Observed Average  Width Within  Review Area – 5 Feet Stream Begins LEGEND Site Boundary Intermittent Stream Perennial Stream Survey Area Wetland Flag Number Map Revisions Data Point Culvert SA 1‐5 DP‐1  SA 1‐5 0,024 4g. Lkl 1h Isis! eslimele J hoes( feel or all eai9lirrg streams on the property: ?Imeaterr.-nq y9er..IBlI 1.440 4h. Expleirn the purpose of the proposed project:+ The development or a 92 lot eulydolelon with mobs, rrtiiVe6. ikirm te,ner and deteraion ponds. ■ I . NtLPt64 the ova ran prof eel In detail, indudrip indirect impacts and Irre Ewe of equipment to be used:* Equiprnenl used: Tray* Hoes, Bull 6oalra, Rama 4j. Please upload prONV-t draWlnpe. Ior the proposed protect. ❑diarzocetl honor dray e-e uepiiei ham 1oataur (twain PC!#B.pdf Fia ryes man ha NI 5. Jurisdictional Dotermlnations Se Hewr the.'.ellands or elm 99m94e en delioetied o n Eh. propertyer proposed impart Ismael ▪ Vex r hlv Gaannrtnbl: 58- If Lhe Corps made a jurisdrelianei deterrnInallom, maw tme pf dlitorminsloon wad Mae?* 6' Preliminary r. ,Vpromad r FJOS Verieed r Lhlrrro,.e r P I anairgia 56h4201 f w ox: Sk1N-202401357 Sc_ IF Sa is yre s, Lrho do I oeatcd Iaty fjr�{*¢pplppna� ar�p Name Cifdonowri: AgeCompany, d lhe r h61lael Oran% PUc Erwranmentel, he 773.78F1B r uredwo l Id- List the dales Di the Corp Jurisdiction determination Or Stale dai rminatoon d a deteillinelion was reside by the Corps et f]WR. 5d'1_ Jurledletlanstbeler,nlestrea uplewd io.tha Laub Iran re Om lard cropilea haviDithEndix orvt 6963_Regera Read_Wel Report_7.14.20.0.11 morrusi 6. Future Project Plans ea. I this a phased proje et?* Yea C.No 2.42VB ,ere any other NYWP{Rk eeoions! {pascal prermllja}, or..dlridwol pq ropily(*) wed, or lnlgndlpd to be awed, loautlrorite any part of the proposed projeoo4 orrelated acilviky?ThLf Includes Weer separate and dnlant dossing !or linear pwoJecla that require 6trper'keteno or the drmyauthoriation but don't require pre,conslrw.IIo l notI lcallan. D. Proposed Impacts Inventory 1.Impacts Summary ie. IIA.ere ere Ills Irrebeuts r.naacIated with your prolect7 (cilhgh all that apply). I— Wetlands 17 $t'4am6-irilMlanes (' Open INaier I— Purl eztatndclioe W 9unr0 3. Stream Impacts If there are por'6nnial Or interrrrittenl stream impacts (including temporary impacts' proposed on the stir, then Complete Ibis question for all stream silos impndad, "S."'MI be used In tie table below la represent the word "stream". S1 3h-RfeSOn for ingackk''' Ilab.lrrpeoktrpr Road Crossing ac. Typo of impact rrranrnu'W'.g!# ]d S name fir. 5rrearoTfpe Perennial Jra ype of JurisclIcLIgn* 31J. E. wltllh * 31Y. —I lamgth e SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OIS NROPAHC T RR BURTLSP YJR.,. DOWNSTREAM TEMPORARY SAND BAG COFFER DAM FOR WORK AREA DEWATERING. 5 LF IMPACT (STREAM LENGTH) PUMP DISCHARGE WITH SILT BAG. PROVIDE PEA GRAVEL PAD BENEATH SILT BAG.ALAMANCE COUNTY ~ NORTH CAROLINAFORCITY OF GRAHAM SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OIS NROPAHC T RR BURTLSP YJR.,.ALAMANCE COUNTY ~ NORTH CAROLINAFORCITY OF GRAHAMDOWNSTREAM TEMPORARY SAND BAG COFFER DAM FOR WORK AREA DEWATERING. 5 LF IMPACT (STREAM LENGTH) PUMP DISCHARGE WITH SILT BAG. PROVIDE PEA GRAVEL PAD BENEATH SILT BAG. CITY OF GRAHAMFORALAMANCE COUNTY ~ NORTH CAROLINASEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OIS NROPAHC T RR BURTLSP YJR.,. STREAM "SA" TEMP. SILT FENCE TEMP. SILT FENCE WETLAND WETLAND SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OIS NROPAHC T RR BURTLSP YJR.,.ALAMANCE COUNTY ~ NORTH CAROLINAFORCITY OF GRAHAMTHE FINISHED TOP ELEVATION OF THE RIPRAP SHOULD NOT EXCEED THAT OF THE ORIGINAL STREAM BED CITY OF GRAHAMFORALAMANCE COUNTY ~ NORTH CAROLINASEAL C 14984 H ENG I SEFO E NARAO LI REEN LA N OIS NROPAHC T RR BURTLSP YJR.,. GENERAL SEQUENCE: 1. CONSTRUCT TEMPORARY COFFER DAMS. 2. PROVIDE ADEQUATE PUMP(S) TO DEWATER WORK AREA. DO NOT REDUCE OR HALT STREAM BASE FLOW. DISCHARGE PUMP EFFLUENT INTO SILT BAG. DISCHARGE SILT BAG BEHIND SILT FENCE AT SILT FENCE OUTLET. 3. INSTALL THE (8" SANITARY SEWER LINE) OR (60" RCP STORM PIPE). 4. PROVIDE CONSOLIDATED AGGREGATE BACKFILL PER CITY OF GRAHAM STANDARDS. A LICENSED NC GEOTECHNICAL ENGINEER AND THE CITY OF GRAHAM INSPECTIONS DEPARTMENT SHALL APPROVE BACKFILL. 5. PROVIDE ANY REQUIRED SOIL BACKFILL IN SHORT, WELL COMPACTED LIFTS. TEST FOR PROPER COMPACTION, CONSULT GEOTECHNICAL ENGINEER. 6. SEED UPLAND AREAS AS SOON AS GRADING ALLOWS. SEE EROSION CONTROL PLAN FOR SEEDING SCHEDULE REQUIREMENTS. SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA NOISNROP AHC T R R BURTLSP YJR.,. SEAL C 14984 H ENG I SEFO E NARAO LI REEN LA NOISNROP AHC T R R BURTLSP YJR.,. STRUCTURE STRUCTURE TOP INVERT IN INVERT OUT NO.TYPE ELEV.ELEV.ELEV. A C.I.595.06 --591.50 B C.I.595.06 591.30 591.10 C C.I.596.29 590.00 589.80 D C.I.596.19 589.40 589.20 E C.I.588.74 584.70 584.50 F C.I.586.33 582.30 582.00 G C.I.583.73 579.20 579.00 H C.I.581.79 577.30 (7) 575.30 (10)574.50 I C.I.580.83 --577.30 J C.I.581.20 577.00 576.80 K C.I.583.32 576.00 575.80 L C.I.573.77 568.80 568.60 M C.I.572.92 567.90 567.70 N C.I.572.92 567.40 (13) 568.40 (15)566.90 O C.I.578.57 --574.60 P C.I.578.72 574.30 574.00 Q C.I.569.83 564.30 564.10 R C.I.568.08 562.60 (17) 563.80 562.40 S C.I.568.08 --564.10 T M.H.569.00 562.00 561.80 U D.I.568.50 560.30 555.50 V FES --554.50 W C.I.565.95 --562.00 X C.I.565.46 561.50 561.30 Y C.I.558.06 554.10 553.80 Z C.I.555.87 551.40 551.20 AA C.I.555.87 550.90 (25) 551.90 (27)550.40 BB C.I.557.80 --553.80 CC C.I.557.72 553.50 553.30 DD C.I.552.71 548.20 (28) 548.40 (29)547.40 EE C.I.552.71 --548.70 FF C.I.555.95 545.70 (30) 551.60 (31)545.50 GG C.I.555.95 --551.90 HH D.I.556.00 544.10 536.00 II FES --534.50 JJ C.I.546.17 --542.70 KK C.I.546.17 542.40 542.20 LL C.I.548.26 541.70 541.50 MM C.I.554.07 540.60 540.30 NN C.I.555.86 539.50 (37) 551.90 (39)539.00 OO C.I.557.57 --553.60 PP C.I.557.90 553.30 553.10 QQ C.I.553.21 538.50 538.30 RR C.I.544.30 537.30 537.10 SS SDMH 546.00 536.85 536.65 TT D.I.545.00 535.92 535.72 UU FES --534.50 CURB INLET = TOP OF CURB DROP INLET & NYLOPLAST INLET = TOP OF GRATE STORM STRUCTURE INFORMATION DRAINAGE CALCULATIONS # …..INDICATES REINFORCED CONCRETE PIPE (RCP) RATIONAL METHOD, Q = CIA (10 YEAR STORM)* …..INDICATES NYLO-PLASTIC (PVC) PIPE AREA TOTAL COEF.RAINFALL C X I RUNOFF #AREA (CFS)SIZE SLOPE CAP SIZE SLOPE LENGTH 1 0.40 0.40 0.65 5.81 3.78 1.51 15 0.06 1.51 15 1.20 25 2 0.08 0.48 0.65 5.81 3.78 1.81 15 0.08 1.81 15 0.89 123 3 0.02 0.50 0.65 5.81 3.78 1.89 15 0.09 1.89 15 0.82 49 4 0.02 0.52 0.65 5.81 3.78 1.97 15 0.10 1.97 15 2.45 184 5 0.78 1.30 0.65 5.81 3.78 4.91 15 0.56 4.91 15 3.93 56 6 1.20 2.50 0.65 5.81 3.78 9.45 18 0.75 9.45 18 2.57 109 7 0.07 2.57 0.65 5.81 3.78 9.71 18 0.84 9.71 18 3.47 49 8 0.20 0.20 0.65 5.81 3.78 0.76 15 0.02 0.76 15 1.11 27 9 0.52 0.72 0.65 5.81 3.78 2.72 15 0.18 2.72 15 0.50 160 10 0.76 1.48 0.65 5.81 3.78 5.59 15 0.72 5.59 15 0.85 59 11 0.05 4.10 0.65 5.81 3.78 15.50 24 0.45 15.50 24 3.48 164 12 0.79 4.89 0.65 5.81 3.78 18.48 24 0.64 18.48 24 1.43 49 13 0.13 5.02 0.65 5.81 3.78 18.98 24 0.68 18.98 24 1.20 25 14 1.47 1.47 0.65 5.81 3.78 5.56 15 0.70 5.56 15 1.20 25 15 0.89 2.36 0.65 5.81 3.78 8.92 18 0.70 8.92 18 4.75 118 16 0.07 7.45 0.65 5.81 3.78 28.16 30 0.46 28.16 30 3.42 79 17 1.00 8.45 0.65 5.81 3.78 31.94 30 0.58 31.94 30 1.17 128 18 1.15 1.15 0.65 5.81 3.78 4.35 15 0.43 4.35 15 1.20 25 19 1.37 10.97 0.65 5.81 3.78 41.47 30 0.96 41.47 30 1.25 32 20 0.00 10.97 0.65 5.81 3.78 41.47 30 0.96 41.47 30 1.04 144 21 0.42 11.39 0.65 5.81 3.78 43.05 30 1.05 43.05 30 2.50 40 22 1.15 1.15 0.65 5.81 3.78 4.35 15 0.43 4.35 15 1.85 27 23 0.55 1.70 0.65 5.81 3.78 6.43 15 0.94 6.43 15 5.00 144 24 0.52 2.22 0.65 5.81 3.78 8.39 18 0.60 8.39 18 4.90 49 25 0.15 2.37 0.65 5.81 3.78 8.96 18 0.70 8.96 18 1.20 25 26 0.87 0.87 0.65 5.81 3.78 3.29 15 0.26 3.29 15 1.20 25 27 0.71 1.58 0.65 5.81 3.78 5.97 15 0.85 5.97 15 1.14 123 28 0.08 4.03 0.65 5.81 3.78 15.23 24 0.44 15.23 24 1.90 116 29 2.18 2.18 0.65 5.81 3.78 8.24 18 0.60 8.24 18 1.20 25 30 0.84 7.05 0.65 5.81 3.78 26.65 30 0.40 26.65 30 0.51 332 31 1.58 1.58 0.65 5.81 3.78 5.97 15 0.86 5.97 15 1.20 25 32 0.46 9.09 0.65 5.81 3.78 34.36 30 0.70 34.36 30 0.95 147 33 0.46 9.55 0.65 5.81 3.78 36.10 30 0.75 36.10 30 2.14 70 34 0.43 0.43 0.65 5.81 3.78 1.63 15 0.06 1.63 15 1.20 25 35 0.40 0.83 0.65 5.81 3.78 3.14 15 0.23 3.14 15 0.52 96 36 0.65 1.48 0.65 5.81 3.78 5.59 15 0.73 5.59 15 0.74 122 37 0.35 1.83 0.65 5.81 3.78 6.92 18 0.42 6.92 18 0.52 155 38 0.67 0.67 0.65 5.81 3.78 2.53 15 0.15 2.53 15 1.20 25 39 0.37 1.04 0.65 5.81 3.78 3.93 15 0.37 3.93 15 2.55 47 40 0.04 2.91 0.65 5.81 3.78 11.00 24 0.23 11.00 24 0.62 81 41 0.14 3.05 0.65 5.81 3.78 11.53 24 0.25 11.53 24 0.54 184 42 1.50 4.55 0.65 5.81 3.78 17.20 24 0.55 17.20 24 0.61 40 43 0.00 4.55 0.65 5.81 3.78 17.20 24 0.55 17.20 24 0.63 112 44 0.44 4.99 0.65 5.81 3.78 18.85 24 0.66 18.85 24 1.17 104 PIPE SIZE NEEDED PIPE SIZE USED 45 40.0 40.0 0.65 5.81 3.78 151.20 60 0.32 151.20 60 4.35 92 VV H.W 536.50 -- WW E.W.--532.50