Loading...
HomeMy WebLinkAbout20130030 Ver 1_401 Application_20130113C Kimley -Horn and Associates, Inc. January 10, 2012 Mr. James Lastinger US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Ms. Karen Higgins NC DWQ, WBSCP Unit 512 North Salisbury Street Raleigh, NC 27604 20130030 P 0 Box 33068 Raleigh, North Carolina 27636 -3068 2&EQD L Re: Nationwide Permit #18 Application Bass Lake Outfall Greenway, Town of Holly Springs Wake County, North Carolina Dear Mr. Lastinger and Ms. Higgins: On behalf of The Town of Holly Springs, Kimley -Horn and Associates, Inc. is submitting the enclosed Preconstruction Notification Application for authorization to construct the above reference project under Nationwide Permit Number 18. The following information is included as part of the application submittal: • Preconstruction Notification Form • Property Owner List • Agent Authorization • Site Figures • Permit Drawings Very truly yours, KIMLEY -HORN AND ASSOCIATES, INC. Z� le<� Chad Evenhouse, PWS Attachments Cc: Len Bradley, Town of Holly Springs Elizabeth Lynch, Kimley -Horn and Associates, Inc. TEL 919 677 2000 FAX 919 677 2050 JAN 1 1 2013 � of W ATF9 0 o < 20130030 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Bass Lake Outfall Greenway 2b. County: Wake ' �* 2c. Nearest municipality / town: Holly Springs 2d. Subdivision name: N/A J�DENR 2e. NCDOT only, T.I.P. or state project no: N/A a 3. Owner Information WATER nds 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Town of Holly Springs 4b. Name: Len Bradley, Director of Parks and Recreation 4c. Business name (if applicable): 4d. Street address: 128 South Main Street 4e. City, state, zip: Holly Springs, NC 27540 4f. Telephone no.: (919) 557 -3934 4g. Fax no.: (919) 552 -5569 4h. Email address: len.bradley @hollyspdngsnc us 5. Agent/Consultant Information (if applicable) 5a Name: Chad Evenhouse, PWS 5b. Business name (if applicable): Kimley -Horn and Associates, Inc 5c. Street address: P.O. Box 33068 5d. City, state, zip: Raleigh, NC 27636 -3068 5e. Telephone no.: (919) 677 -2121 5f. Fax no.. (919) 677 -2050 5g. Email address: chad.evenhouse @kimley- hom.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): (see attachment A) 1b. Site coordinates (in decimal degrees): Latitude: 35.6354 Longitude: -78.8188 1c. Property size: 16 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Bass Lake 2b. Water Quality Classification of nearest receiving water: B, NSW 2c. River basin: Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Approximately 4,450 If of the greenway will be constructed within an existing 30 ft. sanitary sewer and greenway easement owned by the Town of Holly Springs with the remaining 1,400 If to be constructed in a new easement to be acquired by the Town that is currently forested land. 3b. List the total estimated acreage of all existing wetlands on the property: 1.25 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 597 3d. Explain the purpose of the proposed project: Construction of a greenway path connecting Parrish Womble Park to the existing greenway network at the Bass Lake Park and Retreat Center 3e. Describe the overall project in detail, including the type of equipment to be used: The proposed project is being funded and constructed by the Town of Holly Springs. The project will consist of a 10 -foot wide asphalt trail. Construction equipment will consist of excavators, backhoes, and asphalt pavers. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / roject includin all riot hases in the ast? ® Yes ❑ No ❑ Unknown Comments: USACE James Lastinger field review 11/19/12 4b. If the Corps made the jurisdictional determination, what type of determination was made? ® Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Chad Evenhouse, PWS Agency /Consultant Company: Kimley -Horn and Associates, Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Preliminary JD issued November 21, 2012 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams — tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Sift Fencing Bottomland Hardwood Forest Yes Corps 0.001 W2 P Fill Bottomland Hardwood Forest Yes Corps 0.007 W3 T Sift Fencing Bottomland Hardwood Forest Yes Corps 0 004 W4 P Fill Bottomland Hardwood Forest Yes Corps 0.004 W5 T Sift Fencing Bottomland Hardwood Forest Yes Corps 0.004 W6 - Choose one !Choose one Yes/No - 2g. Total Wetland Impacts: 0.02 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Construction access UT to Bass Lake INT Corps 4 24 S2 T Constriction access UT to Bass Lake PER Corps 10 24 S3 T Construction access UT to Bass Lake PER Corps 10 24 S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 72 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Tem ora 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Tem ora 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 P Fill LIT to Bass Lake No 2,711 B2 T Sift fencing LIT to Bass Lake No 1,688 B3 P Fill LIT to Bass Lake No 6,135 B4 T Sift fencing LIT to Bass Lake No 3,253 B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 4,399 9,388 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The project has been designed to minimize permanent wetland impacts to 0.011 acre The greenway will span all streams with prefab bridges avoiding any permanent impacts to streams. The project alignment has been designed to minimize impacts to riparian buffers to the extent feasible while working within the existing Town of Holy Springs owned 30 -foot sanitary sewer and greenway easement In areas where new easements were acquired, the alignment was selected to avoided all wetland impact areas. lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction access will be limited to the proposed trail disturbance area. Special stilling basins will be utilized in conjunction with the dewatenng at proposed bridge locations This special basins will minimize the disturbance footprint to stay within the trail disturbance areas 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: Wetland impacts are <0.10 acre and stream impacts are less than 150 If. 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires 0 Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h Comments: Impacts to riparian buffers for greenways are an "allowable" use. Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. The Muse flow plan is shown in the attached plan sheets. ® Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Not required for this greenway project 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Town of Holy Springs ® Phase II ® NSW 3b. Which of the following locally- implemented stormwater management programs USMP apply (check all that apply): B Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): HSession Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or El Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act El Yes No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Program Database (updated 08/10/2012, accessed 12/19/2012) and the U.S. Fish and Wildlife Threatened and Endangered Species List for Wake County (updated 09/22/2012). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The project is located in Wake County. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation National ❑ Yes ® No status (e.g., Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? N.C. State Historic Preservation Office database, accessed 12/19/2012. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The easternmost section of the project study area, located directly adjacent to Bass Lake, is within Zone AE of the 100 -year floodplain. The project will meet FEMA requirements by constructing the trail at grade within the existing FEMA floodplain. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Insurance Rate Map (Panel No. 0658), effective 05/02/2006. 110 11 3 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 ATTACHMENT A Bass Lake Outfall Greenway Property Owner List # PROPERTY OWNER PIN 1 HOWARD O. STROTHER PIN# 0658 -37 -1860 2 BEN JOSEPH & ALMA LUCILLE THOMAS PIN# 0658 -36 -5904 3 MINNIE DIXON PIN# 0658 -46 -1774 4 BEN JOSEPH & ALMA LUCILLE THOMAS PIN# 0658 -46 -9521 5 JEFFERSON L. SUGG PIN# 0658 -57 -4596 6 KAREN ADAMS FOX AND SUSAN VIRGINIA FOX PIN# 0658 -66 -3250 Letter of Authorization Mr. Len Bradley, with the Town of Holly Springs authorizes Kimley -Horn and Associates, Inc. to act as our limited agent to coordinate with the U.S. Army Corps of Engineers and North Carolina Division of Water Quality for the preparation and submittal of jurisdictional determinations and 404/401 permits applications associated with the Bass Lake Greenway project located in Wake County, North Carolina. Authorization will terminate on either final agency action or upon written notification from either parties involved. Company Name: Kimlev -Horn and Associates, Inc. Contact Name: Elizabeth Lynch, P.E. Client Address: PO Box 9 Holly Shrines, NC 27540 Client Phone #: 919- 557 -3934 Client Fax #: 919 -552 -5569 Client Email: len.bradlevna,hollvsarinesnc.us (Signature of Client) 44 'Z3 -lam Date N e , W E x To of,Hoilv.__s -00 HOLLY SPRINGS s. 0 Z z Cn 0 -7 0 co 0 W z J CL 55 II Project Location Ilk 540 40 0 '414 40 0.75 1.5 I Ivild —T- I Legend Major Roads Holly Springs Town Limit o Future 1-540 Minor Roads Holly Springs ETJ Project Area THE TOWN OF Figure 1 f!0BY Vicinity Map Springs Bass Lake Outfall Greenway CAKOLINA Holly Springs, Wake County Y � vv - q I i S� Legend Data Form Point 250 500 1,000 Fee Delineated Streams Open Water *Note: UT to Bass Lake (SA), is a perennial channel that makes up the Delineated Wetlands southern boundary of the study area. SA briefly crosses the sewer easement before meandering back out of the easement where it 0 Study Area resumes flowing along the southern edge of the corridor. oa,,_ Y '4 t• Legend �s ` Data Form Point 250 500 jee Delineated Streams - w Open Water *Note: UT to Bass Lake (SA), is a perennial channel that makes up the ` southern boundary of the study area. SA briefly crosses the sewer Delineated Wetlands easement before meandering back out of the easement where it NO Study Area resumes flowing along the southern edge of the corridor. �. 4 s }� 49 THE TOWN OF Figure 3 Holly USGS Topographic Map (Apex Quad - 1988) Springs Bass Lake Outfall Greenway n o R r n Z A R O L 1 n A Holly Springs, Wake County F- M„ Kimley-HOM 1 . } t ,° CgB2 �� m ---- ~�--� C e C A` K Feature No Longer Present Ce82 'gyp CeF C I f f, (Feature may have been historically modified - to flow towards SDP1, but feature at SDP1 1 ApC.11 is no longer a stream) ° o a LdC2 CgB2 �� �• Feature No Longer Present '' L�B2 ° `� v CgB2 Ceo q 0° CIB3 Ag'C2 r° 0 Feature No Longer Present CgB2 p OW Feature No Longer Present C2 Features No Longer Present 9C2 CgC2 e� ; B C e F a FaB2 i � {� CSC �.. Legend A , �' • Data Form Point 250 500 11000 '' 6 J g8 Fee df, Delineated Streams Wn r� Study Area -Note: UT to Bass Lake (SA), is a perennial channel that makes up the � -�J Open Water southern boundary of the study area. SA briefly crosses the sewer Ce easement before meandering back out of the easement where it Delineated Wetlands resumes flowing along the southern edge of the corridor. AgB 2 -; e if THE TOWN OF Figure 4 Molly Wake County Soil Survey Map (1970) Springs Bass Lake Outfall Greenway NORTH CAROLINA Holly Springs, Wake County i' !!!I/, Kim ley -Horn U O Uj Uj Q 0 Bas / s La lre Rd. / 8 GJE WO B F, GRI B AVM / I� I � BASS SLAKE 1 I � i PROJECT � 1 Teal Dr 1 1 / gdaa9�ejy- I I / I I. m 55 1_ Old Ada s Rd. f OWNER: TOWN OF HOLLY SPRINGS 128 S. MAIN STREET HOLLY SPRINGS, NC 27540 Len Bradley 919.557.3934 lea. bredleyQholyspdngs.nc.us ENGINEER: KIMLEY-HORN AND ASSOCIATES, INC. 3001 VVESTON PARKVVAY CARY. NC 27513 M..11 Lynch, P' E. 919,877,2000 elIraben.lynch&hley- horn.00m SURVEYOR MAULDIN - VVATKINS SURVEYING, PA P.O. Box 444 FUQUAY VARINA, NC 27526 919.5529328 Wayne N!Wdln — urvey @embargmaLcom VICINITY MAP NTS WOMBLE PART �MN�HO�Yy v��1878� � 0 0 a o k LY THE TOWN OF HOLLY SPRINGS BASS LAKE OUTFALL GREENWAY FROM WOMBLE PARK TO BASS LAKE WETLAND AND BUFFER IMPACTS Summary of Wetland and Buffer Impacts Site fl Station Temporary Fill in Wetlands Permanent Filf in Wetlands Temporary Stream Im acts Permanent Stream Im acts Buffer Zone 1 fmPaC� Temporary Buffer Zone 1 Impacts Buffer Zone 2 Impacts Temporary Buffer Zone 2 Impacts Buffer Zone 3 Impacts Temporary Buffer Zone 3 Impacts [ACI [ACI ILF1 ILF1 [SFI [SFI [SF] [SFI [SFI [Sfl 1 22 +20/23 +50 -L- 0 0 0 0 0 0 0 29 3032 1331 2 25.88/30+00 -L- 0 0 0 0 0 0 D 0 6623 3622 3 30+00 /31+56 -L- 0.001 0 0 0 0 0 0 0 1102 873 4 31 +56/34+00 -L- D 0 0 0 0 0 0 1 26 4945 1945 5 34+00/37 +73 -L- 0.004 0.007 1 24 0 687 460 2149 1 572 1 4179 2111 6 37 +95/39+50 -L- 0 0 0 0 700 252 897 261 0 200 7 39+50/44+61 -L- 0 0 0 0 8 250 1820 i 457 1 7058 1 2816 CARL G. DEAN TOWN MANAGER -L- STA 61+87.00 Kimley -Horn and Associates, Inc. O2012 Post Office Box 33068 R.I.igh, North Carolina 27636 vt Nc. F -a ioz • 0".." CA Rp,4:,� :4 SEAL 037444 r'f'.PG I NEFS'•�crd •,��BOr un ;;pd••. PROJECT REFERENCE NO. SHEET NO. / PRELIMINARY PLAN5 m mor vra row wcasravrnoa GRAPHIC SCALE 10 0 20 PLANS � 10 0 20 PROFILE (HORIZONTAL) 2 0 4 PROFILE (VERTICAL) J PRELIMINARY PLANS INCOMPLETE PLANS Cl) 00 Cl Q Z NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS DICK SEARS MAYOR \ \ Oo \ DCD Z5 +p0 vv �A TEMPORARY F BUFFER ZONE 3 Tj _ IMPACT, = 561 SF _t - = t i TEMPORARY �G BUFFER ZONE" 3 \ .. IMPACT = 770 1 6 /Y- \ - - - SITE I l , NOTE: IMPACTS TO ZONE 3 BUFFERS c� BUFFEONE 3 DO NOT REQUIRE DWQ APPROVAL IMPACT 3V,2 SF eti BUT DO REQUIRE APPROVAL E FROM THE TOWN OF HOLLY - TEMPORARY_ _ e� SPRINGS BUFFER ZONE 2- IMPACT = 29 SF i LEGEND 20• 01 20• 40' - 60 TEMPO RARD SILT FENCE SILT FENCE J -NOOK SCALE: I•= 20' (SEE EROSION CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY -- .+ - - -- TEMPORARY BUFFER PERMANENT BUFFER WETLAND Y BUFFER ZONE I -- BZ 1 - - -- ZONE I IMPACTS ZONE l IMPACTS TEMPORARY PERMANENT F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS F BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM — - BUFFER ZONE 3 — BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 3 PREPARED IN THE OFFICE CF: CAL� - 30 +00 HOWARD 0. STROTHER -- P N 'E,58 3 7- 186 " , -y _ - c w _ r 6 _ TEMPORARY 1 AV " BUFFER ZONE 3 ` - = = �' / i / I ; BZ 2 v to IMPACT = /5/3 SF , ' WLB a 7M_ r NL)Ef -_TDC . �— .. F -� Ina y BUFFS IMPACT S L — A j SITE P�RMANENT BUFFER ZONE 3 IMPACT = 6623 SF CO Z NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS LEGEND TEMPORARY SILT FENCE TT■ (NCDOT STD 1605.01) SILT FENCE EROON CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY -- � - - -- TEMPORARY BUFFER PERMANENT BUFFER WETLAND r i BUFFER ZONE ( - -Z I - - -- ZONE l IMPACTS ZONE I IMPACTS F TEMPORARY PERMANENT ---- "- - - -- F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- __ BUFFER ZONE 3 - BZ TEMPORARY BUFFER T PERMANENT BUFFER TEMPORARY T PERMANENT TOP OF BANK --- ZONE 3 IMPACTS �� ZONE 3 /MPACTS STREAM IMPACTS STREAM IMPACTS _ - _._ 3 1 1 1 1 PRE PARE °.N ITIE OFFICE OF: WETLAND AND BUFFER SCALE: PROJECT _ Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY NO.: I REVISION: DATE: CRAWN BY: CHECKED Br: PRELIMINARY AS NOTED the decific t. toyemer wan t f concepts and designs presented Herein, oe on rnetrlment of per.mes. I , intended o-i for and Associates, Inc. do wtuxra eosnacna o.t specific purpose and client for wnicn it wos prepared. Ruse of and improper reliance of lnis H,r, o d w-io written o�enorizotion ane odopuon by for ana Asociol<s. Inc, enan x wanooi robaay to Kiml<y —Horn ono ASeocmtee. Inc. 3001 WESTON PARKWAY — CARY NC 27513 NcNer =. - _Et ryrM_eR. PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -2 covrriym Kir.dey —Horn ona w�ociotee, Inc, zou 30 +00 - N \F HOWARD 0. STROTHER TEMPORARY BUFFER ZONE 3 IMPACT = 751 SF PERMANENT BUFFER ZONE 3 IMPACT = 4945 SF — — TEMPORARY TEMPORARY BUFFER ZONE 3 BUFFER ZONE 3 \, IMPACT = 25 SF IMPACT = 93 SF SITE E" `L' ire r PERMANENT \ a% BUFFER ZONE ..3 IMPACT = 1102 SF - f F FS PF 4 — P- s - - - -- - 1_- T ')t "ARY J f -WETLAND' IMPACT -D.001 AC; TEMPORAR SITE ? c 4- — BUFFER A NE 2 M&T = 26 SF 82 TEMPORARY BUFFER ZONE 3 IMP- -f(CT 1194 SF J �TPF� TPF- O Ih — IV 111 H ,� ! • 1 W 1� w z w = v, Q i s� —- — -Y- -— _ - __ -- �t � TEMPORARY - BUFFEROZONE 3 IMPACT = 848 SF cl CID O� Z °o LQ Q � J W I Z N uj Q NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWO APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS LEGEND 20• 0• 20• 40• so, TEMPORARY SILT FENCE —� mmm (NCDOT STD 1605.01) 1 E: I•= 20' (SEE FENCE ION CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY TEMPORARY BUFFER PERMANENT BUFFER WETLAND r .. ; BUFFER ZONE l ZONE 1IMPACTS ZONE 1IMPACTS r t TEMPORARY PERMANENT F 'e TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS F BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS PREPARED N THE OFFICE OF: WETLAND AND BUFFER SCALE' PROJECT' Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY NO.: REVISION: GATE: DRAwN Br: CHECKED BY: PRELIMINARY AS NOTED This eeciment, together enn the concepts ane aprepo presentee Herein, os an rnstr"ment of ser.lces, a In ileo oe for and Associates, Inc. �K�,�� °°��° the speciRc vervose b crept for y—H. rt was prevpree. Ruse If one improper blty to er tnts eocemed .dtnoot , 1. o„morizoron one oeopeon by Kimley—HOrn one Asoo;mes. mo, snou x .ano,t robrty to Kimley —Horn one Ass «.ores, mo. 3001 WESTON PARKWAY — CARY NC 27513 Copyegnt Kimley —Horn one nssecmtes. Inc., 2012 PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -3 O PERMANENT BUFFER ZONE 3 IMPACT = 4119 SF TEMPORARY BUFFER ZONE 3 IMPACT = 1104 SF Z PERMANENT BUFFER ZONE 2 p e2 C PERMANENT TEMPORARY IMPACT = 897 SF * �f T - -TPF � TP BUFFER ZONE 2 TEMPORARY �r r- - BUFFER ZONE 2 _ '� � IMPACT - 2/49 SF BUFFER ZONE 2 AF ,$' IMPACT = 67 SF IMPACT = 145 SF ti QC PERMANENT "�� V) �- _.-� \ BZ ..',r1�4�SF BUFFER C =Z�95 SF W TEMPORARY. ` 2 SITE + BUFFER ZONE -2 _ _ .� IMPACT - 137 sF 6 W cn 2 T T - PERMANENT z SF. , r��� BUFFER ZONE I a 1 = W >`' ` l ACT = 700 SF t- a. QwL— — — —w�B— — F �6� 5 oyl L W 6 /. __ -- - - - - - -- _ TEMPORARY w N BUFF ZONE 3 _ Z w IMPAG = 1067 SF BZ kar _ SITES WERMAND N _, °o F �? IMPACT = 0.007 AC � _ l TEM RARY WETLAND ND �� `� BUFF ACT 2200 S NOTE: IMPACT = 0.004 AC TEMPORAR IMPACTS TO ZONE 3 BUFFERS TEMPORARY BUFFER ZO E 2 DO NOT REQUIRE DWO APPROVAL BUFFER ZONE 2 TEMPORARY TEMPORARY IMPACT = 116 SF BUT DO REQUIRE APPROVAL FROM IMPACT = 219 SF BUFFER ZONE 2 BUFFER ZONE l g2 THE TOWN OF HOLLY SPRINGS PERMANENT IMPACT = l49 SF, IMPACT = 252 SF BUFFER ZONE I TEMPORARY LEGEND TEMPORARY 20 0 20• 40• 60• IMPACT = 92 SF BUFFER ZONE l STREAM TEMPORARY SILT FENCE TEMPORARY IMPACT = 235 SF IMPACT = 24 LF (NCDOT STD 1605.01) �r SCALE: 1'• zo• BUFFER ZONE l SILT FENCE J —HOOK IMPACT = 225 SF (SEE EROSION CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY — TEMPORARY BUFFER PERMANENT BUFFER WETLAND , BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS TEMPORARY � PERMANENT F - - - -R,- F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - -•- BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS a PREPARED IN THE ovvlcE OF: WETLAND AND BUFFER SCALE: Pao�ECT: x Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY NO.: REVISION: DATE: DRAWN BY: CHECKED BY: PRELIMINARY AS NOTED the doo�mepu together .Kn t f concepts sea aprepa preserves herein. as on I, eia ent of ,er oe,. n intended only to' en and Associates Inc. mWTmrise - ,ei the specific a purpose and Client for ehich it was prepares. Reuse of and Improper reliance of this )document t wrilIn, oathor:mtion and adoption by Kimley —Horn and Naocicsm, Inc. shoN he eHhoat roaiay to Kimlry —Horn one Associates. Ina. 3001 WESTON PARKWAY — CARY NC 27513 „eeen: a Copyright KinN y -Ham and gs,od,tes, Inc., 2012 PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 111, PRM -4 o Ln a < _ �Q- 1 4 L ,w w� z_ w a PERMANENT BUFFER ZONE 3 IMPACT = 1754 SF 40 +00 pF -- TPF E gZ TEMP( BUFFS IMPACT �2 2 TEMP I BUFF I MPAC ARY ZONE 2 = 243 SF PERMANENT BUFFER ZONE I P RARY IMPACT 8 SF ZON 3 T = 3SF F- N BUFFER NE 3 TNMPORARY - \ PACT =l SF `cfl B P7FER =ZONE I SF j T UFFERAZONE 2 IMPACT = 214 SF lr f NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS 20' 0' 20' 40' 60' SCALE: I's 20' � PERMANENT BUFFER ZONE 2 IMPACT = 1820 SF TEMPORARY BUFFER ZONE 3 IMPACT = 880 SF N \F MINNIE DIXON SITE 7 PERMANENT BUFFER ZONE 3 IMPACT = 5304 SF TEMPORARY TEMPORARY BUFFER ZONE 3 / °- BUFFER ZONE 3 IMPACT = 134 SF IMPACT = 220 SF PERMANENT - `���� BUFFER ZONE 3 IMPACT = 1249 SF eI ` SITE V J8 TEMPORARY'S BUFFER ZONE 3 IMPACT = 1350 SF 6l O� O TEMPOIARY BUFFCZR =2242 4F LEGEND TEMPORARY SILT FENCE -� c� (NCDOT STD 1605.01) SILT FENCE J -HOOK (SEE EROSION CONTROL DETAIL) 1101-111 ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY -- •� - - -- TEMPORARY BUFFER PERMANENT BUFFER WETLAND Y i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS TEMPORARY PERMANENT F - - - ° °- - - - - F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS Y` ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 2 PREPARED IN THE CFFICE OF: WETLAND AND BUFFER SCALE: PROJECT _ Kimley -Horn IMPACT SHEET BASS LAKE OUTFACE GREENWAY NO.: REVISION: DATE: I DRAWN BY: IGHECKED BY, PRELIMINARY AS NOTED This tlocumenl, together with the concepts and designs presented herein, as an instrument of services. is intended only for and Associates, Inc. ° °wpT�ro the speciNc purpose and client for which it was prepared. Reuse of and improper reli- of this document whhoat written oathori-ti- and odaptmn by Kiley —Horn and Aasociot— Inc. shall be withwt Gablity to Klmley —Horn and Aaaociotes. Inc. 3001 WESTON PARKWAY — CARY NC 27513 7 -2050 ,� noweca. _e. „_�„ecR. Copyright Kirntey —Horn and Associates. Inc., 2012 PHONE. (919) 677 -2000 FAX: (919) 67 01239037 PRM -5 U-) �Q TEMPOIARY BUFFCZR =2242 4F LEGEND TEMPORARY SILT FENCE -� c� (NCDOT STD 1605.01) SILT FENCE J -HOOK (SEE EROSION CONTROL DETAIL) 1101-111 ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY -- •� - - -- TEMPORARY BUFFER PERMANENT BUFFER WETLAND Y i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS TEMPORARY PERMANENT F - - - ° °- - - - - F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS Y` ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 2 PREPARED IN THE CFFICE OF: WETLAND AND BUFFER SCALE: PROJECT _ Kimley -Horn IMPACT SHEET BASS LAKE OUTFACE GREENWAY NO.: REVISION: DATE: I DRAWN BY: IGHECKED BY, PRELIMINARY AS NOTED This tlocumenl, together with the concepts and designs presented herein, as an instrument of services. is intended only for and Associates, Inc. ° °wpT�ro the speciNc purpose and client for which it was prepared. Reuse of and improper reli- of this document whhoat written oathori-ti- and odaptmn by Kiley —Horn and Aasociot— Inc. shall be withwt Gablity to Klmley —Horn and Aaaociotes. Inc. 3001 WESTON PARKWAY — CARY NC 27513 7 -2050 ,� noweca. _e. „_�„ecR. Copyright Kirntey —Horn and Associates. Inc., 2012 PHONE. (919) 677 -2000 FAX: (919) 67 01239037 PRM -5 O s Cl) 0 Z TEMPORARY BUFFER ZONE 3 IMPACT = 320 SF Q �r- fY i Z" — — N \F MINNIE DIXON 50 +00 TEMPORARY BUFFER ZONE 3 IMPACT = 476 SF PERMANENT BUFFER ZONE 3 IMPACT = 2888 SF PERMANENT BUFFER ZONE 3 ,- IMPACT 2783 SF- w� - - -- - .�43 %370° E . SITE 9 Q BZ 1 ` 20' 0' 20' 40' 60' SCALE: 1-a 20' 5 33 � 0 _TEMPORARY BUFFER ZONE IMPACT = 103/ ti, 6 /FFEP' ZONE 3 PACT = 544 SF 4, ' TEMPORARY ' BZ 2 BUFFER ZONE 3 IMPACT = 290 Si v N SITE 10 Ln N PERMANENT 1 1 BUFFER ZONE 3 Q IMPACT = 983 SF F— q: 1 � 8 T 50, 36.0° E _ - - -- - _ —_ uj V1 -- v NOTE: r IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS LEGEND TEMPORARY SILT FENCE -�F (NCDOT STD 1605.01) (SEE EROSION CONTROL DETAIL) n ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY _'71. -I -- - TEMPORARY BUFFER PERMANENT BUFFER WETLAND i BUFFER ZONE I BZ 1 ZONE /IMPACTS ZONE /IMPACTS ----- * a TEMPORARY PERMANENT F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS F BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 — BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTSf/ ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS a PREPARED IN THE OFFICE OF: WETLAND AND BUFFER ,ca�E PROJECT: _ Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY PRELIMINARY NO'. REVISION: DATE: DRawN BY: CHECKED BY: AS NOTED and Associates, Inc, oo nor uz ro co, wcnv This docfinent. together with the concepts and tle,.p. d. Re.. herein, as an , elment of services, is intended only far PRM -6 the ,pecif is purpose and client for which it was prepared. Reuse of and improper reliance of this document without written pamarizotion and pdoveon by Kimiey —Horn and a, :oaimea. Ina. ,null oe wnham ranrry to Kimley —Horn and aa,aaatea. m�. 3001 WESTON PARKWAY — CARY NC 27513 eavyr;gnl K1mley-H_ and a„adaeea, Inc., 2012 PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM —s folo Z PERMANENT BUFFER ZONE 3 IMPACT = 780 SF Ln N Q� _ - - - - - - U) —1 W� z J W U Q \ TEMPORARY BUFFER ZONE 3 IMPACT = 1740 SF 83 °_33, N m� 0 -% TEMPORARY BUFFER ZONE 3 IMPACT = 930 SF N \F BEN JOSEPH & ALMA LUCILLE THOMAS SITE 12 PERMANENT BUFFER ZONE 3 IMPACT = 11005 SF B7- _ _ _ 55'`00 aZ m� 62 7412 SF \ \ 76 SF t PERMANE T BUFFER NE 2 -°' IMPACT = 43 SF ��,rr TEMPORARY `TEMPORARY BUFFER ZONE 2 BUFFER ZONE -2 IMPACT = 765 SF IMPACT - —76 SF N \F JEFFERSON L. SUGG TEMPORARY BUFFER ZONE 3 IMPACT = 1412 SF bl & 430, Q- 14 NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS LEGEND 200 0' 20• AO' 60• TEMPORARY SILT FENCE (NCDOT STD 1605.01) T� SILT FENCE J -NOOK SCALE -. I•= 20' (SEE EROSION CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY a. - - - - -, TEMPORARY BUFFER PERMANENT BUFFER WETLAND Y i BUFFER ZONE l BZ 1 ZONE /IMPACTS ZONE /IMPACTS t i TEMPORARY PERMANENT F - - ----- TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 — BZ TEMPORARY BUFFER T PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS r ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS a aREPAaEOIN 1HE OFFICE OF: WETLAND AND BUFFER SCALE: PROJECT: I Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY NO.: REVISION: DAIS: DRAWN By CHECKED BY: PRELIMINARY AS NOTED this document, together cli the roncepts and tlprepo d. Fl letl herein, oa an instrument of N. res, is intended only !or and Associates, Inc. the specific purpose and cl'by for which it nd prepared. Reuse of and improper reliance of I,y—Hocumenl without written aamari:atian and otlovnon by Kimley -Horn ana A „ooiotes. Ins. ,null x .nnoal ranaity ro Kimley -Horn no n „orrotn. Inr. 3001 WESTON PARKWAY - CARY NC 27513 �r �uMeER Copyright —ley-H.- —ley-H.- awd Assodatm. Inc., 2012 PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -7 O 0 TEMPORARY BUFFER ZONE 3 ��, g� XCn IMPACT = 54 SF N \F Q TEMPORARY JEFFERSON L SUGG Z SITE 13 BUFFER T 992 SF co Q� PERMANENT / SITE 14 BUFFER ZONE 3 v 60 +00 IMPACT = 5756 SF TPORARY UF BI BFER ZONE 2 - .•. - IMPACT = 87 S N T MPORARY sl QA U FER ZONE / PAT F T _ E - 7— _ - . �.•� �•..�a.�i�.+ -mow v - - s S_ B PERMANENT 74aJ`/' 46 ` - -- -► - -- - - _ �,` �\, ��� z BUFFER ZONE 3 IMPACT = 791 SF F , .�, N:. o� •O� g1. eZ 82 6'1 0- m TEMPORARY BUFFER ZONE 3 C� Q- _ PERMANENT Y'a IMPACT 33 F BUFFER ZONE 2 TEMPORARY �/ o I IMPACT = 137 SF BUFFER ZONE 3 TEMPORARY IMPACT 6/4 SF _. = _ ' I BUFFER ZONE 3 TEMPORARY t\ �Q C) IMPACT = 235 SF BUFFER ZONE 2 TEMPORARY - IMPACT = 403 SF BUFFER ZONE 2 , IMPACT = 174 SF NOTE: BUFFER 0 T BUFFERS BUFFEREZONE 2 \` \ Q IMPACTS ZONE 3 BU E S IMPACT = 59I SF DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM PERMANENT THE TOWN OF HOLLY SPRINGS IMPACT R =ZONE SF LEGEND 20• o• 20• a0• 60• TEMPORARY SILT FENCE♦ TEMPORARY (NCDOT STD 1605.01) STREAM SIT FENCE J —HOOK SCALE: I's 20• IMPACT = 24 LF (S E EROSION CONTROL DETAIL) n ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY TEMPORARY BUFFER PERMANENT BUFFER WETLAND A f i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS - A ----- * , TEMPORARY PACT S PERMANENT MPACTS F F TEMPORARY BUFFER � PERMANENT BUFFER BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - BUFFER ZONE 3 - BZ TEMPORARY BUFFER /' PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 3 PREPARED N THE OFFICE OF WETLAND AND BUFFER SCALE: PROJECT Kimley -Horn IMPACT SHEET PRELIMINARY BASS LAKE OUTFACE GREENWAY NO.: REVISION: DATE: IMAym RY: CHECKED BY: AS NOTED This docament. together wnn the concepts one designs presented herein. rn on inem ment of ee .mee, is intended only for and Associates, Inc v the specific purpose and client for nhiCh it was prepared. Re— of and improper Mianae of this do[ament without written aothari !on one oaopfion by Kimley -Horn and Aeeaeiates. Inc, shoN be without IiobSty to Kimley -Horn and Aeeaaiat— Inc, 3001 WESTON PARKWAY — CAR( NC 27513 ��uatR. . �ur.eca eapr.;am Kimley —Ham and weociatee. Inc.• 2012 PHONE. (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -8 O O N v / V 1 U? V � _ Q PERMANENT \ BUFFER ZONE 2 IMPACT = 432 SF TEMPORARY �' TEMPORARY BUFFER ZONE 2 \ IMPACT = 426 SF IMPACT = 115 SF 1 TEMPORARY STREAM IMPACT = 24 LF \�h,00; i 91 W* ilj- °•��� ®� ®�'�� TE -O.A- 60 F PERMANENT BUFFER ZONE 2 F , IMPACT = 578 SF TEMPORARY BUFFER ZONE IMPACT = 300 SF NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS SITE IS — PERMANENT BUFFER ZONE 3 IMPACT = 4343 SF s d, K� \ i 22, TEMPORARY BUFFER ZONE 3 IMPACT = 401 SF f� N m in 10� 0 Z. � Z O ti TEM fARY f mot; FER ZONE 3 W IMPACT = 914 SF LEGEND —ti TEMPORARY SILT FENCE♦ (NCDOT STD 1605.0/) SCALE: Y• 20' ° (SEE EROSION CO'TROL DETAIL) r% ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY ------ TEMPORARY BUFFER PERMANENT BUFFER WETLAND i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS TEMPORARY PERMANENT F - - - - ° °- - - - - F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 — BZ TEMPORARY BUFFER'' PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 3 PREPARED IN THE OFFICE OF: 2 WETLAND AND BUFFER scA�E� PROJECT- 2 i I Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY This REVISION: DALE: — is Re CHECKED r and Associates RELIMINARY AS NOTED t■1 WT RE IM Cfsrsllltic: -r This document, together with the r 1hiC h and designs d. It presented herein, as an instrument of services. is mended only for ' Inc. ■ i the specific propose and client /p which it wos prepared. Reuse of and improper ref nce of This document without e, authorization and oduption by Kimley —Horn one Psaociotes, Inc. shoe be wdhoul Iiabaity I. Kimley —Horn ono A „ociotea, Inc. In 3001 WESTON PARKWAY — CARY NC 27513 nu•ern. swc�, nuwecR t Copyright Kimley —Horn and A—iot— Inc., 2012 PHONE. (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRIA F' ' / / \�h,00; i 91 W* ilj- °•��� ®� ®�'�� TE -O.A- 60 F PERMANENT BUFFER ZONE 2 F , IMPACT = 578 SF TEMPORARY BUFFER ZONE IMPACT = 300 SF NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS SITE IS — PERMANENT BUFFER ZONE 3 IMPACT = 4343 SF s d, K� \ i 22, TEMPORARY BUFFER ZONE 3 IMPACT = 401 SF f� N m in 10� 0 Z. � Z O ti TEM fARY f mot; FER ZONE 3 W IMPACT = 914 SF LEGEND —ti TEMPORARY SILT FENCE♦ (NCDOT STD 1605.0/) SCALE: Y• 20' ° (SEE EROSION CO'TROL DETAIL) r% ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY ------ TEMPORARY BUFFER PERMANENT BUFFER WETLAND i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS TEMPORARY PERMANENT F - - - - ° °- - - - - F TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 — BZ TEMPORARY BUFFER'' PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS 3 PREPARED IN THE OFFICE OF: 2 WETLAND AND BUFFER scA�E� PROJECT- 2 i I Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY This REVISION: DALE: — is Re CHECKED r and Associates RELIMINARY AS NOTED t■1 WT RE IM Cfsrsllltic: -r This document, together with the r 1hiC h and designs d. It presented herein, as an instrument of services. is mended only for ' Inc. ■ i the specific propose and client /p which it wos prepared. Reuse of and improper ref nce of This document without e, authorization and oduption by Kimley —Horn one Psaociotes, Inc. shoe be wdhoul Iiabaity I. Kimley —Horn ono A „ociotea, Inc. In 3001 WESTON PARKWAY — CARY NC 27513 nu•ern. swc�, nuwecR t Copyright Kimley —Horn and A—iot— Inc., 2012 PHONE. (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRIA TEMPORARY BUFFER ZONE 3 T�\ �v O O NOTE: IMPACTS TO ZONE 3 BUFFERS DO NOT REQUIRE DWQ APPROVAL BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS 20' 0' 20' 40' 60' SCALE: 1'a 20' PERMANENT BUFFER ZONE 3 IMPACT = 4436 SF TEMPORARY BUFFER ZONE 3 IMPACT = 992 SF i " 00 D Q Z rn= rnz �rn mr rn i rn� � D 1 � =W O O — —' —SITE LEGEND TEMPORARY SILT FENCE (NCDOT STD 1605.01) (SEE EROSION CONTROL DETAIL) n ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY TEMPORARY BUFFER PERMANENT BUFFER WETLAND ; BUFFER ZONE I - BZ 1 -- ZONE I IMPACTS ZONE I IMPACTS t TEMPORARY PERMANENT F - - - -° ----- TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 - BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - - -- BUFFER ZONE 3 - BZ TEMPORARY BUFFER 77/ PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS r1A PREPARED IN THE OFFICE CF. WETLAND AND BUFFER SCALE: PROJECT Kimley -Horn IMPACT SHEET BASS LAKE OUTFALL GREENWAY NO.: REVISION: DATE: DRAWN Br: CHECKED er: PRELIMINARY q5 NOTED ,nry and Associates, Inc. v° use ra carsnacno This document, together with the concepts and tlp,ep. presented herein, a, an malrument of his ­!­ is d.-- t ith0 tar the .1i specific purpose and client for which �t wos prepares. ,1 one improper relionto of this document with „t written ,amoraoaon antl mavhon by Kmler —Horn ana A,ao iaea, Inc. mp, ahall x wdh,m rpertr to Kimley —Horn pnd wa„ +area. Inc, 3001 WESTON PARKWAY — CARY NC 27513 hcwerA. C,pr+aht Klmley —H,,, and Assocl,tes. Inc., 2012 PHONE: (919) 677 -2000 FAX (919) 677 -2050 01239037 PRM -10 N \F KAREN ADAMS FOX AND ` SUSAN VIRGINIA FOXY. \\ co ` 00 \ Z ` ► \ m \ -J SITE 18 PERMANENT \` / BUFFER ZONE 3 IMPACT = 3980 SF TEMPORARY BUFFER ZONE 3 1 1 PERMANENT IMPACT = 1023 SF BUFFER ZONE 3 75+00 IMPACT = 13 SF gZ 3 D v� n rn C ez l 0 z r z rn _ fT1 -- - - - - -- - - -- -- -- + - i - - - - -- _--- _- - -��_- _ _ _ /� ik � w �D —BZ �1 �1 BUFFER ZONE 3 + IMPACT = 5�E SFWLB- _ BZ 1 CD PERMANENT TEMPORARY z\ NOTE: Z 2 TEM ORAPY BUFFER ZONE 2 BUFFER ZONE 3 IMPACTS TO ZONE 3 BUFFERS >' _ BU F ZONE 2.__!. IMPACT = 69 SF IMPACT = 454 \5F DO NOT REQUIRE DWO APPROVAL _ _ = 228 SF BUT DO REQUIRE APPROVAL FROM THE TOWN OF HOLLY SPRINGS . " ` - - - - - ° - - - . _ _ - LEGEND 20• 01 20• 40• 60 'x, TEMPORARY SILT FENCE ` (NCDOT STD 1605.01) } SCALE: I'- 20' *, SILT FENCE J —HOOK (SEE EROSION CONTROL DETAIL) ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY -' e,. 'k — —,- — t TEMPORARY BUFFER PERMANENT BUFFER WETLAND t BUFFER ZONE I - 13Z 1 ZONE /IMPACTS ZONE /IMPACTS k 11 11 I TEMPORARY PERMANENT FAF - - - -R,- - - - - TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS BUFFER ZONE 2 - BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS STREAM - -- BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS PREPARED w THE OFFICE OF: WETLAND AND BUFFER SCALE: Fro; =cT I Kimley -Horn IMPACT SHEET Inc. PRELIMINARY BASS LAKE OUTFACE GREENWAY NO.: REVISION: DATE: IN2AMN BY: CHECKED By and Associates' ■nVS AS NOTED ap rql uY faK C1MIWa11W This document, together .11h the concepts and deslgm presented herein, os — instrument of s—ces, is intended only for the specific purpose and client for Which it was prepared. Reuse of and improper reliance of this (document wAhout —At- pmhori -ti— pnd odopti,n by Kimley -Horn and Assca ;,1— Inc, shcn be .;moat robsty to Kimley -Horn and Aeeooiolee, Inc. 3001 WESTON PARKWAY — CARY NO 27513 118 —HEI. - -E. N -11 Copyright Kimley –Horn ,aa A, „ai,tee, lac., 2012 PHONE. (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -11