Loading...
HomeMy WebLinkAboutWQ0039476_Regional Office Historical File Pre 2018ROY COOPER Governor AEL S. REGAN Seeretaiy S. JAY ZIMMERMAN Oireaor September 1?, 2017 Mr. Wilmer Melton, III. Director of Public Works City of Kann.apolis 401 Laureate Ways Kannapolis, North Carolina 28081 Subject: Permit No. WQ0039476 City ofKannapolis Downtown Kannapolis Infrastructure & Streetscape Project Wastewater Collection System Extension Permit Cabarrus County Dear Mr. Melton: In accordance with your application received September 1 1�, 2017, we are forwarding herewith Permit No. WQ0039476 dated September 1.2, 2017 to the City of Kannapoliis (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall he subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit: and is therefore incorporated therein by reference. Please pay particular attention to the followg conditions contained within this pe Condition his permit shall not be automatically transferable; a request Condition II.4: Requires that the wastewater accordance with 1.5A NCAC permit issued to the Permittee. de and approved. lection facilities be properly operated and maintained in .0403 or any individual system -wide collectir n system It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215..6A through § 1.43-215.6C, construction of additional or replacement wastewater r tiles on ac it'ies an. or refieri°aTo.tn1 e P orq Carca-t`na-licenser fe;s ronaa n.gineerm b tl-i WlicenIsing board. If any parts, requirements, or liritations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Flearings, 6714 Mail Service Center, Raleigh, NC 2'7699-6714. Unless such demands are made, this permit shall be final and binding. Stare of"North C:arolna. < Ens roninentai \Vier Re xirces l Wateruatlity Regional Ohioan Mooresville Regional Office i 61.0 rasa Center Avenue, Suite 301. ; Mooresville, North Carolina 281 1 a 704 663 1699 If you need additional information c nc miti tl is a r .. please contact Ori 1 uvia at 704) 5-2190 or via -mail at ort,tuvidabrictlenneoli Since by W, Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division ision f Water Resources, NCDEQ Aaron Wagoner ,E,(E-tiopy) Moot ille Regional Office Files, Water Resources Central Files EER(.S -copy) Page 2 of E nvt`ronrnoni Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21. of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapolis Cabarrus County for the construction and operation of approximately 2,073 linear feet of 8-inch gravity sewer, 434 linear feet of 10-inch gravity sewer, 1,025 linear feet of 12-inch gravity sewer and 1,094 linear feet of 16-inch gravity sewer to serve as part of DOWIltOW11. Kannapolis Infrastructure ez Streetscape Project development, and the discharge of 37,050 gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received September 1 1 , 2017„ and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996,.as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1. 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein, by W. Cot- ,y Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ f-thr-EnMati Permit Number: Permit Issued: WQ0039476 September 12, 2017 Page 3 of 8 SUPPLEMEN T TO PERMIT COVER SHEET City of Kannapolis is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet I 5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12,1996., as applicable; and the Division's Minimum Design Criteria for the .Fast -Track Permitting of Pump Stations. and Force Mains adopted June 1, 2000, as applicable, unless specificallymentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I., SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 37„050 GPD, shall be made tributary to the subject sewer system until an application for permit modification. fir an increase in flow has been submitted to and approved by the Division. [ISA NCAC 02'10304 (b)] II. STANDARD CONDITIONS "This permit is not transferable.. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shali he considered on its merits and. may or may not be approved. [15A NCAC 02T.0104; G,S 143-215.1(d3)] This permit shall -become voidable unless the Nvastewater collection facilities are constructed in accordance with the conditions of this pennit; 15A NCAC 2T; the Division's Gravity 'Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01 101 This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 021" .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Pennittee shall maintain compliance with an individual system -wide collection system permitfor the operation and maintenance of these .facilities as required by 15A NCAC 2T .0403, If an. individual permit is not required, the following performance criteria shall be met: [1.5A NCAC 02T .0 08(b)]; Page 4 of 8 pr The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including -pumpstation inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented.. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. g, A general observation of the entire sewer system shall be conducted at least once per year, Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with -15A NCAC 2B .0506(a)., and public notice shall be provided as required. by North Carolina General Statute §143-215.1C h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and resid.ential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least 'bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3„ Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall he kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5 The Perrnittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1.699, as soon as possible, but in no case more than 24 hours. following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line 'blockage or breakage, etc.; or b, Any SSO and/or spill over 1,000 gallons; or c„Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Divisionapproved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 1.43- 215.1C(a1)1 6. Construction of the gravity sewers, pump stations, and. force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters ofthe State. NSA NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted, facilities, the completed Engineering Certification form attached to this permit shall be .submitted with the required supporting documents to the address provided on the form.. A complete certification is one where the form is fully executed and the supporting documents are provided. as applicable.. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineers Certification shall be considered a violation of the permit and shall subject the Perinittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the upporting documents are provided as applicable. Supporting documentation shall 'include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in. force mains with a pump cycle, and downstream sewer capacity analysis. if a portable power source or pump is dedicated to .multiple stations, an evaluation of all the pump stationsstorage capacities and the rotation schedule of the portable power source or pump, include travel timefrarnes, shall be provi ed, c. Changes 10 the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10.9/6 or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 5 of 8 or or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation.. [45A NCAC 02T ..01.16] 8. Gravi.q: sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case ba.sis. Resolution of such request shall be evident prior to completing and submitting the construction certification, [ 15A NCAC 02'F.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Perniittee for the life of the wastewater collection facilities, [15A NCAC 02T ,0 H.61 10. Failure to abide by the conditions and limitations contained in this permit; 1.5A NCAC .2T, the Division's Gravity Sewer Design Criteria adopted February 1,2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, '2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina. General Statutes §143-215.6A through §143-215,6C, constniction of additional or replacement wastewater collection facilities, arid/or referral of the North Carolina -licensed Professional. Engineer to the licensing board. [15A NCAC 02T .0104; I5,A NCAC 02T ,0108(b-c)1 11. In the event that the wastewater collection facilities fail to .perfonn satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 021 .0108(b)] 12, The issuance of this permit shall not exempt the Pennittee from complying with any and all statutes, niles, regulations, or ordinances that may be imposed by the Division any other Federal., State, or Local government agencies which h.ave jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215..1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PE.RMITTEE: art' OF KANNAPLIS PERMIT #: WQ0039476 PROJECT: DOWNTOWN KA.NNAPOLIS INFRASTRUCTURE & STREETSCAPE PROJECT ISSUE DATE: SEPTEMBER 12, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard. Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water QualityRegional Operations Section at the address noted in the page footer, Any wastewater flow made tributary to the wastewater collection. system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a :final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION 1. the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof, Printed Name., SignatureDate E7sIGINEER'S CERTIFICATION 1, as a duly registered Professional Et n.eer On the State of North Carolina, having been authorized to observe (El periodically, weekl):, LJ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction. was observed to be built within substantial compliance of this pemiit; 15A 'NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted Febniary 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast:I-rack 'Permitting of Purnp Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 047 Program Category Non -discharge Permit Tyne Gravity Sewer Extension, Pump Sta Prurtibry Reviewer- ori.tuvia Coastal SWRule Permitted Flow 37,050 Facility ,nt rare e r'Extensions Centre! Files: APS SWP 9/12/2017 Per tit Tracking Slip Status Project Type Active New Project Version Permit Classiti 1.00 Individual Permit Contact Affiliation Facility Name Downtown Kannapoli Location Address 401 laureate Way Kannapolis Owner More reetscape Project NC 28i MtajorlMartor Minor Fa Ahliatsnri Region Pooresville County Cabarrus Chvner Name City of Kannapolls Cates Eder is Owner Type Government - Municipal Owner Affiliation' Wrlmer Melton 11t DtR PUBLIC WORKS PO Box 1199 Kannapolis NC 28081119 Dig tissue App Received 9/12/2017 9/11/2017 Regulated Aciitatfes Draft Snitia Scheduled suance Domestic, other Wastewater collection Public Notice issue EffectEffective Expiration 2/2017 9/1212017 l equest d IReceived Events Additional infarelation requested Additional iaafasri ation received Waterbody Name rtiIndex Number CuireiClass Subbasin DO NOT ACCEPT UNLESS THIS CHECK iS PRINTEDNlITH A COLOR .BACKGROUND, CGNTAINS A VOID 'PANTOGRAPH,. FARO O 0wth''C rJ€ine 2 Hundred yDoPars ollar DEPARTMENT N IR MENTAL.,QUY' AL Tct 610 E CENTER AVE BUTTE 301 MOORESVILLE, NC 28115 an ger v p? 0 DAY FROM, t ATE O r E NO PACE :ANC) BACK, UV FIRERS AND A WATERMARK ON THE REVERSE,SIDE Check Check` 'Pate N mber 09/08/2017 00140349 TH{$-©JSBURSEk1ENTHAS QEEN APPROVUJ�A REQUIRE©, BY; THE LOCAL GOVERNMENT F1UO3ETAND ISCAL,C(NTROL;ACT, 480 000 L 4o 3 1-, 911' 4000 21-$81: 20? 28803 608 ? 311' 15A NC. . Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources MCK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: )114) 3ti PI by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1 Applicant's name: City of Kannapolis (company, municipality, HOA, utility, etc.) 2. Applicant type:Individual El Corporation El General Partnership E] Privately -Owned Public Utility E] Federal E State/County 1 Municipal E] Other 3. Signature authority's name: Wilmer Melton, III per 15A NCAC 02T .0106(b) Title: Director of Public Works 4. Applicant's mailing address: 1401 Laureate Way City: Kannapolis State: NC Zip: 28081- 5: Applicant's contact information: Phone number: (704) 920-4200 Email Address: wmeltonCa4kannapo1isne.gov 11. PROJECT INFORMATION: 1, Project name: Downtown Kannapolis Infrastructure & Streetscape Project 2. Application/Project status: Proposed (New Permit) El Existing Permit'Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cabarrus 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.497113' Longitude: -80.626750' 5. Parcel ID (if applicable): 56135935600000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1, Professional Engineer: Aaron Wagoner License Number: 043902 Firm: LandDesign, Inc Mailing address: 223 N Graham St City: Charlotte State: NC Zip: 28202- Phone number: (704) 333-0325 Email Address: awagoner@landdesign,com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1, Facility Name: Rocky River Regional Wastewater Treatment Plant Permit Number: NC0036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1, Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch 'System Wide Collection System Permit Number(§)fif applicable): WQCS Owner Narne(s): FORM: FTA 04-16 Page 1 of 5 VI, GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? Yes 0No N/A App ant i a Developer of lots to be sold, has a Devel 3. If the Applicant is a Home/Property Owners 4. Origin of wastcvvater: (check all that apply): LI Residential Owned 0 Residential Leased 0 School / preschool' day care 0 Food and drink facilities 0 Businesses / ,offices / factories rational Agreement FORM; DE' been attached? 0 Yes 0No N/A \ssociation. has an Operational Agrecin:._ t ,)A), been attached? 0 Yes EjNo N/A 0 Retail (stores, centers, malls) Retail with food preparation/service D Medical / dental / veterinary facilities 0 Church Nursing Koine 5. Nature of wastewater Domestic/Commercial 100 % Commercial % Industrial (See 15,A. NCAC 02T .010_42Q)) 1-9-11s there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 02T .0114(0? 0 Yes If yes, provide a copy of flow reduction approval letter 7, Summarize wastewater generated by project: D Car Wash 0 Hotel andlor Motels 0 Swimming Pool /Clubhouse LI Swimming Pool/Filter Back -wash Other (Explain in Attachment) Yes 0 No No tablishment T. (see 02T.0114(0) Daily Design Flow No. of Unit Clubhouse/Locker Room Facility 50 gali100 sf 12600 sf 6,300 GPD Baseball Stadium 5 gaL/seat 6,000 seat 30,000 GPD Maintenance Building 250 gallfixture 3 fixtures 750 GPD gal/ GPD gal/ gal/ GPD Total GPD 37,050 GPD a See 15A NCAC 021 0114(1% (d), (e)(1) and (e)1_2) for caveats to wastewater design flow rates (ix:, minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in GS _42A 74)c b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15 A NCAC 02T.01 141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data, 8, Wastewater generated by project: 37,050 GPD (per 15A NCAC 02T .(i11,4) Do not include future flows or previously permitted allocations If pennitted flow is zero, indicate why; 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line LI Flow has already been allocated in Permit Number: LI Rehabilitation or replacement of existing sewer with no new flow expected El Other (Explain): FORM: FTA 041-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gr vity Sewers): 1. Summarize gravity sewer to be pemiitted: Size (inches) 8 10 12 16 Length (feet) 2073 434 1025 1094 Material Ductile Iron Ductile Iron Ductile iron Ductile Iron. R E RIM:JAC:6' D r, favvR .9 017 M 00 Rti'SOU Ott - NAL OFFICE M R faiM LE REGIONAL, FFfCri Section 11 & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria ';%. Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VM. PUMP STATION DESIGN CRITERIA (If Applicable) — orr .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4, Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size 'n hes) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T ,0305(11)( I ): D Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)( I )(8): Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Y. Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: El Portable power source with manual activation, quick -connection receptacle and telemetry - I 5A NCAC 02T ,0305(h)(1)(C ) or El] Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T :0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stationsstorage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM; FTA 04-16 Page 3 of 5 SETBACKS & SEPARATIONS — (028 .0200 &ISA NCAC 02T .0305(0): 1. Does the project comply with all separations found in 15A NCAC 02T 0305(11*. (g) 5A NCAC 02T.0305(f) contains .• mum separations h shall be provided for sewersystems: Storm Aback Para nd other uti1ttie not listed belo eparation R 24 inche Yes [1] No ins (vert iai ical-wa izontal) over sewer including in benched trenches) 18 inches 0 Reclaimed water lines (vertical - reclaimed over sew inches Reclaimed water lines (horizontal - redairned over sewer) et **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source f drinkin water 100 feet raters classified WS (except WS-I or WS-V), B, SA, ORW, HOW, or SB from normal high water (or tide elevation) and wetlands (see item IX,2) 0 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation Any basement Top slope ofembankment or cuts of2fcet or more vertical height Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) 5 feet 10 feet 1.0 feet 5 feet 10 feet 36 inches A 15A, NCAC 02T.0305(n) contains alternatives where separations in 02T.0305(1) cannot be achieved. A **Stream classifications can be identified using the Division's NC Surface WaterClassifications webpage If noncompliance with 021%0305(j) orfg), sec Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes No N/A A See the Division's draft separation requirements for situations where separation cannot be meet A No variance is required if the alternative design criteria specified is utilized in design and constriction A As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 1 5A NCACO213,02011? [J Yes E] No N/A A This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? A. Information can be obtained from the 401 & Buffer Permitting Branch Yes 4No 5. Does project comply with 15A. NCAC 02.1.0105146) (additional permits/certifications)? Yes D No Per 15A .NCAC: 02T„01.05(0(f!), directly related environmental .permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A. NCAC 021.0402,. "high -priority sewer" means. "any aerial sewer, sewer contacting surface waters, siphon, or sewer .positioned paraliel to strcambanks that is subject to erosion that underminesor deteriorates the sewer. Ei Yes Ei No N/A A If yes, include anattachment with details for each line, including type (aerial line, size., material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the pertnitees individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 CERTIFICATIONS: 1., Does the submitted system comply with 1 and Force Mairts_tlate5Lversionj, and the ' 02T, the Minimum Design Critgia. for the Permitting' or Pump Stations er Minimum D ,ri teria (latest versiolij as applicable? Yes JNo If No, compete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2, Professional Engineer's Certification: GroNEaR, (Professional Enne r's name from Application Item 111,1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest vetsion), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215,6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): W ILMEA Ket-71004 III gGc-r*t oft i71.4 i‘ te.1 04-145 (Signature Authority's MUM & title from Application Item 1.3. phti-- \\ / CA //„. attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-215.6A and 143-21,5..611, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signature: Date: 7 FORM: FTA 04- I 6 Page 5 of 5 Public 1kx':)rks September 8, 2017 North Carolina Department of Environmental Quality Mooresville Regional Office - Water Quality Section 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Downtown Kannapolis Infrastructure & Streetscape Project Sewer Extension City of Kannapolis — Cabarrus County Dear Sir or Madam: Please find attached for your review and approval the original and one copy of the permit application along with the $480 processing fee for the above referenced project. Also enclosed is the flow acceptance letter from the Water & Sewer Authority of Cabarrus County stating they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The proposed extensions and replacements will connect to the existing Kannapolis sewer system which extends to the WSACC Irish Buffalo Creek Interceptor. This wastewater collection system will serve the Downtown of Kannapolis and the proposed Kannapolis Minor League Ballpark. The Water and Sewer Authority of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of Environmental Management. This project will be installed in accordance with these Standard Specifications, Please call me at 704-920-4219 if you have any questions. Sincerely, Misty L3LlC WC 704-920-4200 K.A N N.A INC,. 28081 SNt Treatment WSACC August 28, 2017 Mr, Michael Legg City Manager City of Kannapolis P.0, Box 1199 Kannapolis, NC 28082-1199 Subject: How Acceptance Request — City of Kannapolis Downtown .Kannapolis Infrastructure Dear Mr, 1,..egg: WATER & SEWER AUTHORITY OF CABARRUS COUNTY 232 Davidson Hwy, Concord, NC 28027 704,786,1783 • 70,4,795.1564 Fax www,wsaccorg This is an approval of the flow acceptance request received by the 'Water and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on August 25, 2017. WSACC has or will have capacity at the Rocky River Regional \Vastewater 'Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled Downtown Kannapolis Infrastructure, located near West B Street and West lStreet. The referenced project will serve existing development and a new ballpark with clubhouse/locker room 'facility, stadium, and maintenance building, with a projected (additional) wastewater flow of 37,050 g-,illons per day (gpd), 'lite wastewater generated by this project will be conveyed through the proposed 16-inch line, through an existing gravity system, and then enter WSACC's system at the existing IS inch Irish Buffalo Creek Interceptor, WSACC agrees to accept wastewater from the proposed development based on infOrmation provided by LandDesign (Civil Engineer lot the project) using North Carolina Department of Environmental Chtality (NCDE(,) wastewater flow guidelines, The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future, Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory.' :,Ipproval, and funding availability, It should be noted that .the list sch(_thile of CIP projects are tentative and are .revised periodically to reflect changing conditions and needs. If construction of this project is not started within (Ave) (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in ‘vriting, when construction of this project is initiated. If YOU have any questions, please eall nte at r7041 786-1783. extension 224, Sincerely, , / J, Thomas Hahn, PE t„jtility Systems Engineer cc: Misty Lippard. PE/Kannapolis Wilmer Melton/Kannapolis Aaron ‘Vagoner. PE/LandDesign Michael Wilson/WSACC Tim Kiser, PLIWSACC Chad VonCannon, Ph/WSACC NI uk Loin,ix/WSAC"C Division of Water Resou State of North Carolina Department of Environmental Quatity Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01114) (WSACC USE ONLY) Downtown Kannapolis Infrastructure Section I. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility Permit #NC0036269 n Muddy Creek Wastewater Treatment Facility Permit #NC0081621. facilitv*s perrnitted flow, MGD 26,500 Estimated obli ated flow not yet tributary to the WWTP. MGD WWTP facility's actual avg. daily flow, MGD Total flow for this specific request, MGD Total actual and obligated flows to the faci!ity, MGD Percent of permitted flow used 2302 16.205 (61.15% of permit) 0.037 18.544 69.98% Section 11. Pump, stations along the route from the jurisdiction's connection point to the WWTP. Pump Station (Name or Number) RRRWWTP I Fir ) Capacity * MCD 43) Design Average Daily How "'* Approx. Curren (Finn/pi) Average Daily Flow .MGID MGD 55.440 22.176 ..640 (C1.1. Obligated, No 'lel Tributary Daily How NIGD Total Current How .Plus Obbgated Flo‘v MGD 0.402 1.0,042 The Firni Capacity' of any pump station is defined as the maximum pumped flow that can he achieved with the largest pump taken out of service, “ftesign Average Daily blow is the firm capacity of the pump station divided by a peaking factor nut less than LS. '"A Planning Assessnnt Addendum baIi be atthed fr eeb purup tatin located between the project conned'. in ere Available (E'4'=-( A-D) Available Capacity*" IVIGD 2,134 Section III, WSACC Certification Statement: J.,Thomas Hahn. PE, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream. pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section I and Section 11 plus all attached planning assessment addendu.ms for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow, ACC's Signing Offlciai Signature Revision Date: 08/09/13 WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: 06-19-2017 []City of Concord City of Kannapolis TownofHarrisburg ETown of Mt, Pleasant ['Charlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: Downtown Kannapolis infrastructure & Streetscape Project —Project # Description: The Downtown Kannapolis Infrastructure & Streetscape engineering plans and specifications, as prepared and sealed by Aaron Wagoner, NCPE, with LandDesign, for the wastewater collection system extension consisting of approximately 5,283 linear feet of I 6, 12 and 8-inch sanitary sewer with 35 manholes and 30 cleanouts to serve Downtown Kannapolis and the proposed Minor League Ballpark located between West B Street and West 1 '5( Street, with a wastewater discharge of 37,050 GPD. (see attached plan) *Number of Lots: N/A OR *Number of Units: 6000 scat baseball stadium *Must be luded in request. Where will the new line be connected: El Directly into a WSACC Interceptor Into the Jurisdiction's existing collection system Into a private line Describe the location of the tie-in line to which the new sewer line will connect: The proposed I6-inch sanitary sewer extension will tie-in to the existing 12-inch sanitary sewer systemsystem.which extends to the 48-inch RCP material WSACC Irish Buffalo Creek Interceptor Which WSACC Interceptor will the flow ultimately be discharged into: 48-inch RCP WSACC Buffalo Creek Interceptor What is the WSACC manhole number that the flow will be discharged into? +7- Node 011173 What is the quantity of flow that will be discharged? 37,050 GPD Flow type: Ej Domestic °/(1 Commercial 100 El Industrial Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided. Mark Lomax at 704-786-1783, ext. 231, must be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after completion. If construction is not started within two (2) year from the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. WSACC USE ONLY: DATE: LIJ Current sewer model shows an Interceptor as being surcharged south of the manhole in question. Lil Approved LI Not Approved Li Current Sewer Model shows Division of %UV* fteliources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 41/14) (fURISDICTI„ON USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: OCity of Concord PCity of Kannapolis DTown of Harrisburg DTownofMt Pleasant E3Charlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: Downtow Kannapolis Infrastructure & Streetscape Project —Project # Description: The Downtown :Kannapolis Infrastructure & Streetscape engineering plans and specifications, as prepared and sealed by Aaron Wagoner, NCPE, with LandDesign, for the wastewater collection system extension consisting of approximately 5,283 linear feet of 16, 12 and 8-inch sanitary sewer with 35 manholes and 30 cleanouts to serve Downtown Kannapolis and the proposed Minor League Ballpark located between West B Street and West lgt Street, with a wastewater discharge of 37,050 GPD. (see attached plan) What is the quantity of flow that will be discharged? 37,050 GPD Flow type: El Domestic °A.I4 Commercial 100 C Industrial Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. Pump Station (Name or Number) (A) Firm Capacity * Design Average Daily Flow ** MGD (Firintl4 MCD (B) Approx. Current Average Daily Flow MGD (C) Obligated, Not Yet Tributary Daily How MGD (D) (B+C) Total Current Flow Pius Obligated Flow MOD (E)—(A-D) Available Capacity*** MGD * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the M,WI'P where Available Capacity is <0, Section II. Jurisdiction's Certification Statement: I, Wilmer Melton, III, Director of Public Works, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I plus all attached planning assessment addendums fir which, to the best of my knowledge, will not adversely affect the downqreamsewer capacity. Signature of this form indicates acceptance of this wastewater flow. ‘=, jurisdiction's Signing Official Signature Date Revision Date: 08/09/13 urban design planning civil engineering branding landscape architecture DATE: August 22, 2017 PROJECT NAME: Downtown Kannapolis Infrastructure — Minor League Ballpark TO: Water And Sewer Authority of Cabarrus County 232 Davidson Highway Concord, NC 28027 FROM: RE:: To whom it PROJECT #: 1016120 Aaron Wagoner, LandDesign Downtown Kannapolis Infrastructure — Minor League Ballpark Flow Acceptance Request y concern, Enclosed is a WSACC application and utility plan for wastewater flow acceptance for the Downtown Kannapolis Infrastructure Project, including the Kannapolis Minor League Ballpark. The stadium will include seating for 6,000 people, a clubhouse, maintenance building and restroom/concession facilities. The proposed sanitary sewer system will reconnect all existing taps from existing buildings (previously permitted) within project limits: The proposed sanitary sewer system will tie-in to the existing 12-inch sanitary sewer system, which extends to the 48-inch RCP WSACC Irish Buffalo Creek Interceptor. Wastewater flow demands are as follows: Clubhouse/Locker Room Facility o 12,600 sf at 50 gal/100 sf = 6,300 gpd Stadium © 6,000 seats at 5 gal/seat = 30,000 gpd Maintenance Building © 3 plumbing fixtures at 250 gal/fixture = 750 gpd Total wastewater flow requested = 37,050 gpd Please review the enclosed application package and contact us with any questions. We are available to sit down with WSACC at any time to discuss the project and the process for connecting to your system. Thank you anon Wagoner, PE LandDesign PO IBoz 36959 Charlotte, NC 30236.6959 1'23 North Graham Street Charlotte, NC 28302 V, 704,333,0325 F:704,376.8235 5014012M NCR& Phlit Sector • 61:/01 Mr. Michael Legg City Manager City of Kannapolis P.O. Box 1199 Kannapolis, NC 28082-1199 August 28, 2017 Subject: Flow Acceptance Request — City of Kannapolis Downtown Kannapolis Infrastructure Dear Mr, Legg: WATER 8( SEWER AUTHORITY OF CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.1783 • 704395.1564 Fax www.wsacc.org This is an approval of the flow acceptance request received by the Water and Sewer Authority of Caba.rrus County (WSACC) from the City of Kannapolis on August 25, 2017. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled Downtown Kannapolis Infrastructure, located near West 13 Street and. West I s' Street. The referenced project will serve existing development and a new ballpark with clubhousellocker room facility, stadium, and maintenance building, with a projected (additional) wastewater flow of 37,050 gallons per day (gpd). The wastewater generated by this project will he conveyed through the proposed 1.6-inch line, through an existing gravity system, and then enter WSACC's system at the existing 48- inch Irish Buffalo Creek Interceptor. WSACC agrees to accept wastewater from the proposed development based on information provided by LandDesign (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines. The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval,. and funding availability. It should be noted that the list and schedule of CIP .projects are tentative and are revisedperiodically to reflect changin.g conditions and needs. If construction of this project is not started within two GO years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated. If you have any questions, please call me at (704) 786-1783, extension 224, Sincerely, £- 3 Thomas Hahn. PE Utility Systems Engineer cc: Misty Lippard, PE/Kannapolis Wilmer Melton/Kannapolis Aaron Wagoner, PE/LandDesign Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC State of North. Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Aeceptance for Sewer Extension Permit Applications Division of Water Resourtes (FTSE —01/14) (WSACC USE ONLY) Downtown Kannapolis Infrastructure Section I. Name of wastewater treatment facility (\MIT) receiving wastewater: Rocky River Wastewater Treatment Facility Permit. iiNC0036269 D Muddy Creek Wastewater Treatment Facility — Permit 4NC0081621 WWTP facility's permitted flow, MGD Estimated obligated flow not yet tributary to the WWTP, MGD 2.302 WWTP facility's actual avg. daily flow, MGD 16.205 (61.15% of perm - Total flow for this specific request, MGD Total actual and obligated flows to the facility, MGD Percent of permitted flow used 26.500 0.037 18.544 69.98% Section H. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Puntp Station. (Name or Number) MC Firm Capacity * D RRRWWTP MPS 55 A40 (A) (B) Desiza Average Daily Flow *k „Approx. Current (Firnalpf) Average Daily Flow MGD fYiGiD . 76 (C) Obligated, Not Vet Tributary Daily flow MGD = (13+C) Total Current blow Plus Obligated How 'MGT) 9.640 0.402 10.042 the Firm Capacity of any pump station is defined as. the maximum pumped flow that can he achieved with the largest pump taken out of service. L **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not .1s than 2.5. Planning Assessment Addendum shall be attached for each pump station located between the project:connection point and the VW] P where Available Capacity is .‹ O. (E)(A-D) Available Capacity NiGn. 2.134 Section III. WSACC Certification Statement: 1, J. Thomas Hahn. PE„ certify that, to the best of my knowledue, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving .treatment plant under normal circumstances, given the implementation of the planned improve.ments identified in the planning- assessment where applicable,. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section 1 and Section II plus all attached planning assessment addendums for which, to the best of my knowledge,. will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. 5/ACC 's Signing 'cial Signature /Dot .? Revision Date: 08/09/13 WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: 06-19-2017 OCity of Concord 4City of Kannapolis Town of Harrisburg DToi of Mt. Pleasant EjCharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title; Downtown Kannapolis Infrastructure & Streetscape.Project—Proiect # Description: The Downtown Kannapolis Infrastructure & Streetscape engineering plans and specifications, as prearedprep and sealed b Aaron Wa oner. NCPE with LandDesig-n, for the wastewater collection system extension consistingof approximately 5,283 linear feet of 16, 12 and 8-inch sanitary sewer with 35 manholes and 30 cleanouts to serve Downtown Karmapolis and the ro osed Minor Lea ue Ballpark located between West B Street and West. 1" Street, with a wastewater discharge of 37,050 GPD. (see attached plan) *Number of Lots: N/A OR *Number of Units: 6000 seat baseball stadium *Must be included in request. Where will the new line be connected: El Directly into a WSACC interceptor Into the Jurisdiction's existing collection system El into a private line Describe the location of the tie-in line to which the new sewer line will connect: The proposed 16-inch sanitary sewer extension will tie-in to the existing 12-inch sanitary sewer system, which extendsto the 48-inch RCP material WSACC Irish Buffalo Creek. Interceptor Which WSACC Interceptor will the flow ultimately be discharged into: 48-inch :RCP WSACC Buffalo Cree Interceptor What is the WSACC manhole number that the flow will be discharged into? +/- Node 011173 What is the quantity of flow that will be discharged? 37,050 GPD Flow type: Ej Domestic Commercial 100 Industrial Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 E Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided. Mark Lomax at 704-786-1783, ext: 231, must be notified 48 hours in advance of a connectiona WSACC interceptor. WSACC will inspect connection before, during, and after completion, if construction is not started within two (2) year from the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. WSACC USE ONLY: DATE: LI Current sewer model shows an Interecptor as being surcharged south of the manhole in question, 111 Approved LJ Not Approved 111 Current Sewer Model shows: State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) ICTI•N USE 0 LY) Jurisdiction Requesting Flow Acceptance for Collection System: Dcity of Concord City of Kannapolis EJTowii of Harrisburg EjTown ofMt. Plea ant EjCharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: Downtown Kannapolis Infrastructure & Streetscape Project —Project # Description: The Downtown Kanna olis Infrastructure & Streetscape engineering Plans and specifications, as prepared and sealed b Aaron Wagoner, NCPE, with LandDesi n. for the wastewater collection s stem extension consistin of approximately 5,283 linear feet of 16, 12 and 8-inch sanitary sewer with 35 manholes and 30 cleanouts to serve Downtown Kannapolis and thepoos4Minor League Ballpark located between West B Street and West 1st Street, with a wastewater discharge of 37 050 GPD, (sce attached Ian What is the quantity of flow that will be discharged? 37,050 GPD Flow type: 0 Domestic % Commercial 100 0 Industrial Section I - List the Jurisdiction's pump stations located 'between the project connection point and the WSACC Interceptor connection point. Pump Station FirmCapacity * (Name or Number) MGD (A) Design Average Daily Flow ** (Finn/pf) MGD (13) Approx. Current Average Daily Flow MGD Obligated, Not Yet Tributary Daily Flow MGD (D) C) Total Current Flow Plus Obligated Flow MGR (E)=(A-D) Available Capacity*** MGD * The Firm Capacity of any pump station is defined as the masimum pumped flow that can be achieved with the largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided try a peaking factor not less than 2.5, ***A Planning Assessment Addendum shall be attached for each pump station located hetsveen the project connection point and the WWTP where Available Capacity is <O. Section 11. jurisdiction's Certification Statement: Wilmer Melton, III, Director of Public Works, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACCinterceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstreamsewer capacity. Signature of this form indicates acceptance of this wastewater flow. Jurisdiction's Signing Official Signature Date Revision .Date: 08/09/ i 3 n urban design planning civil engineering branding landscape architectirt DATE: PROJECT NAME: Downtown Kannapolis Infrastructure — Minor League Ballpark. PROJECT #: 1016120 TO: Water And Sewer Authority of Cabarrus County 232 Davidson Highway Concord, NC 28027 FROM: RE: August 22, 2017 Aaron Wagoner, LandDesign Downtown Kannapolis Infrastructure — Minor League Ballpark Flow Acceptance Request To who rra it fray concern, Enclosed is a WSACC application and utility plan for wastewater firma acceptance for the Downtown Kannapolis Infrastructure Project„ including the Kannapolis Minor League Ballpark. The stadiurn will include seating for 6,000 people, a clubhouse, maintenance building and restroomlconcession facilities. The proposed sanitary sewer system will reconnect all existing taps from existing buildings (previously permitted) within project limits, The proposed sanitary sewer system will tie-in to the existing 12-inch sanitary sewer system, which extends to the 48-inch RCP WSACC Irish Buffalo Creek Interceptor, Wastewater flow demands are as follows: Clubhouse/Locker Room Facility 0 12,600 si at 50 gal/100 si 6,300 gpd Stadium o 6,000 seats at 5 gal/seat = 30,000 gpd Maintenance Building a 3 plumbing fixtures at 250 gal/fixture = 750 gpd Total wastewater flow requested = 37,050 gpd Please review the enclosed application package and contact us with any questions. We are avaifaite to sit drawn with WSACC at any time to discuss the project and the process for connecting to your system, Thank you n Wagoner, PE LandDesign PO BcR 36959 Charlocre. NC 187364959 713 North Grsharn Scrreti Chnrlosre. NC 28701 V:704.333,0325 F:7©4 378,.9235 Water Resources ENVIRONMENTAL QUALITY June 7, 2018 Mr. Wilmer Melton, 111, Director of Public Works City of Kan.n.apolis 401 Laureate Way, Kannapolis, North Carolina 28081 SUBJECT: Partial Engineering Certification Acknowledgement Rowan-Cabarrus Community College ATC Permit No, WQ0039476 Permitee: City of Kannapolis County: Ca.barrus Dear Mr. Melton: ROY COOPER Covernor ICHAEL S. REGAN Secretary LINDA CULPEPPER Intertrn ():rector The Division of Water Resource's Mooresville Regional Office received the partial engineering certification with record drawings for the subject sewer extension project on 6/5/2018. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Pe.miittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal,ncclent.org/web/wq/swp/ps/es/pnoc from the Collection Systems Applications page, Should you have any questions,. please do not hesitate to contact Ori 'Fuvia at (704) 235-2190, or at ori.tu v i a@ri cdenr.go v. Sincerely, Ori Tuvia.„ Environmental Engineer Mooresville Regional Office Division of Water Resources,DEQ cc: Aaron Wagoner, PE (E-Copy) Central Files, MRO (Lasertich.e) State of North Carolina Environmental Quality Watel Resourms 610 E CVier AVen,,R. Sone 301. PAxgenville. 28115 Phone: 704-66J-169i,,) nAernet www.lczlehr goy FAST TRACK SEWER ENGtNEER(NG CERTIFICATION PERM1TTEE: CITY OF KANNAPLIS PERMIT #: WQ0039476 PROJECT: DOWNTOWN KANNAPOLIS INFRASTRUCTURE & STREETSCAPE PROJECT ISSUE DATE: SEPTEMBER 12, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. it should be submitted in a manner that documents the Division's receipt, Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page looter. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent he Perrnittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Penn ittee, and the Perm ittee is prepared to operate & maintain the wastewater collection system permitted herein oyortions thereof. d Name, Tit C.(1- ENGINEER'S CERTIFICATION 1, Ago,' Weii 60iveiz , as a duly registered Prfessional En n er in the State of North Carolina, having been authorized to observe (C1 periodically, P weekly, U full time) the constriction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final 4 Part nclude description) (saz A-roz,dao e-0401.- LErt&c__ AND friA ryK 7)4SCiti is,7r AAJ Certification Comments/Quallfiers (attach if necessary): 043902 ci• 94,t4S PkG oi B NC OWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 FAST1V CK SEWER ENQINE kl RTRFTION PERMITTEE: CITY OF KANNAPLIS PERMIT 0: WQ0039476 PROJECT: DOWNTOWN KANNAPOLIS INFRA TRUC' THE+li STREETSCAPE PROJECT ISSUE DATE: SEPTEMBER 12, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page Tooter. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Pemtlttee to appropriate enforcement actions. The Permittee is responsible for trucking all partial certifications up until a final certification is received by the Division.. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. ?ERMITFEE'S CRRTW!CATID'N 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permlttee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof e cr f4 c::..4a i Lk poi r' lk 5 ed Name, Title Date ENGINEERS CERTIF1CATIQN Aas a duly registered Professional En itteer in the State of North Carolina, to observe (0 periodically, Et weekly, �' tll time) the construction of the i...: name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and. Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: P (NAPE (SEE AtMc NAF FGA Pisa Certification Comments/Qualifiers (attach If necessary): NC DWR — Water Quality Regional Operatlo Mooresville Regional 0 610 fast Center Avenue, 5utte 301, Mooresville, NC 28115 Phone: (704) 663.1R99 FAX: (704)-633-6040 Sanitary Sewer Testing Report Project Name:Kannapolis Major Infrastructure Phase 2 Project #: 1016120 Date:November 2018 Signed: William Morris tnhotr cation SSMH-2a To SSMH-3 16 inch Present at Site: William Morris- L DI Pipe ancirei Pressure 289.06 Ductile Air Test (Minutes) 7:05 Comments SSMH-3 To SSMH-4 16 inch 192.92 Ductile 7:05 SSMH-4 To SSMH-5 16 inch 176.43 Ductile 7:05 SSMH-5 To SSMH-4a 12 inch 82.87 Ductile 2:38 SSMH-4a To SSMH-1228 12 inch 17.85 Ductile 0:40 SSMH-4a To SSMH-6 12 inch 53,37 Ductile 1:59 SSMH-6 To SSMH-6a 12 inch 52,66 Ductile 1:59 SSMH-6a To SSMH-6b 12 inch 21.86 Ductile 0:55 SSMH-6b To SSMH-7 12 inch 202.06 Ductile 5:17 SSMH-7 To SSMH-1220 SSMH-7 To SSMH-9 12 inch 21.63 Ductile 1:19 12 inch 377.96 Ductile 6:03 SSMH-7 To SSMH-7a 12 inch 112.62 Ductile 3:18 SSMH-7a To SSMH-17 8 inch 121.57 Ductile 1:46 SSMH-17 To SSMH-18 8 inch 174.4 Ductile 1:46 N:1__2016110161201Docs\Per ing\Sewer Certificati©n\Parti w Sewer Testing Report 9:20 AM 1/15/2019 urban des gn pla civic engtneenng branding landscpe cMe February 19, 2019 State of North Carolina Department of Environmental and Natural Resource Division of Energy Mineral and Land Resources 610 E. Center Avenue, Suite 301 Mooresville, North Carolina, 28115 Re: Sanitary Sewer Partial Certification (Map 2) Permit No. W00039476 City of Kannapolis Downtown Kannapolis Infrastructure and Streetscape Project Cabarrus County To whom it may concern, On behalf of the City of Kannapolis, we are providing herewith a testing report, partial as -built, overall sanitary sewer map and a partial sewer certification for the sanitary sewer system along Oak Avenue, West Avenue, West A Street and West B Street as part of the Downtown Kannapolis Infrastructure and Streetscape Project, located in Cabarrus County. This partial sewer certification package is being submitted to certify the construction and completion of sanitary sewer from SSMH-2A to SSMH-4 along Oak Avenue, SSMH-10 to SSMH-14 along West Avenue, SSMH-16 to SSMH-24A along West Avenue, SSMH-6 to SSMH-9 along West Avenue, SSMH-7 to SSMH-18 along West A Street, SSMH-4 to SSMH- 1229 along West B Street, and SSMH-4 to SSMH-5460 along West B Street (see attached as - built). This was constructed under the Permit No. W00039476. Construction of this system was observed and built within compliance of the permit. Feel tree to give me a call if you have any questions. Respectfully Submitted, Aaron Wagoner, PE Associate LandDesign 22') North Graham Street Charlotte. NC 28202 V. 704. F:704 .a32S .32a6 www.LandOesign.cQrn tsh�+sgton DC Charlotte NC Raietgh NC.. Dagas TX fY July 26, 2019 a:. i e,r :ape architecture State of North Carolina Department of Environmental and Natural Resources Division of Energy Mineral and Land Resources 610 E. Center Avenue, Suite 301 Mooresville, North Carolina, 28115 Re: Sanitary Sewer Final Certification Permit No, WQ0039476 City of Kannapolis Downtown Kannapolis Infrastructure and Streetscape Project Cabarrus County To whom it rr ay concern, On behalf of the City of Kannapolis, we are providing herewith a testing report, as -built, overall sanitary sewer map and a final sewer certification for the sanitary sewer system along Vance Avenue, Oak Avenue, West Avenue, West A Street and West B Street as part of the Downtown Kannapolis Infrastructure and Streetscape Project, located in Cabarrus County. This final sewer certification package is being submitted to certify the construction and completion of sanitary sewer from the existing downstream SSMH to SSMH-10A along Vance Avenue, SSMH-2 to SSMH-2A along Oak Avenue, SSMH-2A to SSMH-4 along Oak Avenue, SSMH-10 to SSMH-14 along West Avenue, SSMH-16 to SSMH-24A along West Avenue, SSMH-6 to SSMH-9 along West Avenue, SSMH-7 to SSMH-18 along West A Street, SSMH-4 to SSMH-1229 along West B Street, SSMH-4 to SSMH-5460 along West B Street, SSMH- 5460 to SSMH-15A to SSMH-15B along West B Street (see attached as -built). This was constructed under the Permit No. WQ0039476. Construction of this system was observed and built within compliance of the permit. Feel free to give me a call if you have any questions, Respectfully Submitted, Aaron Wagoner, FEE Associate LandDesign 223 North Graham Street NC 2Fit202 wwwa t.andDesecon Dalias FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF KANNAPL1S PERMIT #: WQ0039476 PROJECT: DOWNTOWN KANNAPOLIS INFRA. STRUCTURE & STR.EETSCAPE PROJECT ISSUE DATE: SEPTEMBER 12, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permitter to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION [, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. 719..acs c °F need Name, Title ENGINEER'S CERTIFICATION Date a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe ([1 periodically, 0 weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2 tit t, as applicable; and other supporting materials. North. Carolina Professional Engineer's Seal w/signature & date: Certification C0113 eats/Qualifiers {attach if necessary): 'fl l3 YNC4A4 irk MAP t AND ri141141.. C,t tl,u 1,.►J 1141 £JAs FiCavia4x+1 t‘460•ril P 7.e NcPEc, NC DWR - Water Quality Regional Operations Sectlon 610 East Center Avenue, Suite 301, Mooresvitle, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX°. (704)-633-6040