Loading...
HomeMy WebLinkAboutWQ0041127_Regional Office Historical File Pre 2018Dtwislarr of Water ources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC OZT -03.00 — FA rCRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16. & SUPPORTING DOCUMENTATION Application Number: d h, D4't'R.) All items must be completed or the application be returned LICANT INF+C)RMATION: Applicant's name: City of Kannapolis (company, municipality, HOA, u Applicant type: ] Individual C;otporation C] Federal 0 Stale/County Signature authority's name: Wilmer Melton,. 111. per 15 'y N[ \ Title: Director of Public. Works 4 Applicant's mailing address: 401 Lr City: Kannapolis State: NC 5. Applicant's contact information. Phone number. (704) 920-4200 Email Address: wmeltontrr:kannapoli Zip: 28081-0005 PROJECT INFORMATION: l . Project name: Wayne Brothers Sewer Extension a Phase 2 Application/Project status: If a modification, pro ide t1 El Proposed (New Permit) © Ex.isting Permit/Project a permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: A Q00 _-- 3. County where project is located: Cabarrus County 4. Approximate Coordinates (Decimal Degrees): Latitude: 35, 4850 `' Longitude. - 7 7761 t Parcel ID (if applicable): 46735613260000 (or 'Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: 1. Professional Engineer: LiceNumber: 18947 First: 'The Estates Group Mailing address: 572E Bed Oak 8 v City: Chi;,triode State: NC Phone number. (704 ) 527- 3440 470 7- Email .Address: cisaocs@—aacisorp.cond WASTEWATER TRLAT.MENT FACILITY (WWTF) INFORMATION: 1. Facility Name Rocky River Regional Wastewater Treatment Plant Permit Number: yr .00362 Owner Name: Water & Sewer Authority ofCabarrus County RECEIVING DOWNSTREAM SEWER INFORMATION (if different than l . P'ertrtit Nuniber(s): WQ System Wide Collection System Peumit'Number(s) (if applicable}: " WQCS Owner Name(s): etc El General Partnership E} Privately -Owned. Puhli ivaticipal El Other FORM: :ETA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS I. if the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? El Yes ElNo NIA 2. If the Apphcant 's a Dc cloper of lots to be sold, has a Developer's Operational „Agreement (FORM: DEVI been attached? El Yes ENo ZN/A 3„ If the Applicant is a llomelPropertv Owners' Association, has an Operational1 I ( )RM IttTA Yes 1,q/A 4„ Origin of ,rvastewater:(check all that a p El Residential Owned [11 Retail (stores, centers,. malls) 1Z Residential Leased LI Retail with food preparation/service 7 School preschool / day care LI Medical / dental / veterinary 'facilities Lil Food and drink facilities L.1 Church FT' Businesses / offices faciorie D Nursing Home 5, Nature of ‘vastewater % Dom.estic/Commercial % industrial (Se-. 5A NC,,, , - 02T t„ . een attached? II Car Wash Hotel and or Motels El Swimming .Pool /Clubhouse Ei Swimming Pool Filter Backwash El Other (Explain in Attachment) 100 9'l Commercial )'Is there a Pretreatment Program in effect? 6, Has a flow reduction been approved under 1.5A NCAC 02-1 TB 14(f)? If yes, provide a copy of flow reduction approval letter 7„ Summarize wastewater generated by project: Establishment Type (see OZT.0114(1)) El Yes Daily Design Flo - gall a.h Yes LI No No No. of Units How GP gal/ gal GPD GPD Total, GPI) GPD GPD 0 GPD a see ISA N(2,AC: 02T .01 14(b), jd 1. jgjj 1 jj,gjj thr caeat 10 wastewater design flow rates (i„e., minimum flow per dwelling; proposed unknown non-residential development uses, public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal .Waterwa,y .to be used as vacation rentals as defined in G.S, 42A-4). b Pcr 15,A NCAC 02T .01 T4(c), design flow rates for establishments not identified [in table 1.5A NCAC 0210114] shall be determined using a,vaila.ble flow data, 'water using fixtures, occupancy or operation patterns, and other measured. data 8. Wastewater generated by project: 0 GPD (per 1 5„A NCAC 02T .01 1,41) Do not include future flows or previously permitted allocations if permitted flow is zero, indicate why: DI Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect ) this line Lil Flow has already. been allocated in Permit Number: El Rehabilitation or replacement of existing sewer with no new flow. expected Proposed sewer extension is tor a new deveiopment that does not yet have any proposed uses or E Other (Explain): buiidings requiring sewer service, FORM: FTA 0416 Page 2 of 5 VIE GRAVITY SEWER DESIGN CRITERIA Of Applicable) - 02T .0305 'Gravit- Seers: I. Summarize gravity sewer to be permitted: Size 8 8 Length (feet) 516 Nlaterial PVC DIP >;;. Section 11 & 111 of the MDC tbr Permitting of Gravity Sewers contains information rdated to design criteria • Section 111 contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIIL PUMP STATION DESIGN CRITERIA (Ii-Applicable) — 02T .0305 SI MDC nuns/ a COMPLETE FOR EACH PUMP STATION INCLUDED IN 'ffitS PROJECT 1, Pump station number or name: 2, Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3, Design .flow of the, pump station: millions gallons per day T — capacity) 4, Operational point(s) of the pump(s): gallons per minute at :feet total dynamic head 11-D11) 5, Summarize the force main to be permitted (for this Pump Station): Power rchabihty in accordance with 15A NCAC, 02 1 030.5(UW: Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T ,0305(h)(1)(B): Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day • Must be permanent to. facility Or if the pump station has an average daily flow less than 15,000 gallons per day: [1] Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T ,0305(h)(1)(C) or El Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T ,0305(h)(1)(C): It shall be demonstrated to the Division, that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station_ • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04i(i Page .3 of 5 1X. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(1)): Does the project comply with all separations found in i5A NCAC 02-F .0305(1) & (g) 5A NCAC 02T.0305(f) contains minimum separations that sha Setback Paran ite * eers and othei utilities not listed below 'vertica provided for s ewe Ej Yes El No S : Separation Required 24 inches ate • ains (vertical-wa over sewer includingbenchedre -hes) r rnai inches 10 •fee' ReclaimedRcclairned watcrs (vertical - reclaimed over sewer) Reclaimed water lines(horizontal - reclaimed over sewer) *Any private or public water supply source, including any wells, WS-1- waters of Class tor Class 11 impounded reservoirs used as a source of drinking water **Waters classified WS (except WS-1 or WS-V), B, SA, OR\V, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX,2) *Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches inches ee 100 feet 50 e • feet Any buildi Any baser oundatio Top slope ofemhankinent or cuts of f Draina s stems and interceitor drains e verticalhei 1 5 feet 10 fee' 10 feet Any swimming pools 0 fee Final earth grade (vertical) 30 niches '15A NCAC 02T,0305(g) contains alternatives whereseparations in 02'f,0305(t). cannot be achieved, **Stream classifications can be identified using the Division's NC Surface ‘Vater Classifications webpage If noncompliance with 02T,0305(11t r see Section X of this application 2 Does the project comply with separation requirements for wetlands? (50 feet of separation) El Yes El No See the Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per I 5A NCAC 0213 ,0200? El Yes • This would include Trout 'Buffered Streams per ISA NCAC 2B4O202 No 4, Does the project comply with an individual 404 Permit or any 401 Certifications? ED Yes El No • Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters Information can he obtained from the 401 &. Buffer Pennining Branch 5, Does project comply with 1.5A NCAC 02T,0 I 05(c)(6) (additional permitskertifications)? E.] Yes El No Per 15A NCAC 02T.0105tegfil, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, sto•rmwater managementplans, etc,), 6. Does this. project include any sewer collection lines that arc deemed "high -priority?" Per 15A 'NCAC 0.2T,0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. r: Yes J No • If yes, include an attachment with details for each line, including type (aerial line, size, material, and Iocatton) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A. NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1, Does the submitted system comply with. I5A. NI AC 021, the %Mini: the Permitting. of Pump Stations and Force Nlains flatest version), and the Gnivitv SeWer Minimum Design Ci iteria ( atest crsiun as applicable? 0 Yes El No If No, complete and submit the VariancefAlternative Design Request application (VADC 10-14) and supporting documents for review„Approval of the request is required prior to submittal of the Fast Track Application and _supporting documents Professional Engineer's Certification: 1, -7S• .=5-FSJIiN_C.5 (Professional Engineer's name froni Application Item111.1.:) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest. version), and the Minimum .Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version), Althoughother professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design, NOTE • In accordance with General Statutes 143-.215,6.A and 143-215,613, any person who knowingly makes any false statement, representation, or certification On any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S1.0,000, as well as civil penalties up .to $25,000 per violation, North Carolina Professional Engineer's s fftftz1td date: .." THE ISAACS GROUP,PC. I ENGINEERING & %LAND SURVEYING! NO. C-1069 .0. E.OF A 3. Applicant's Certification per 15A NCAC 02T *0 Wilmer Melton, III, Director of Public Works attest that this application for (Signature Authority's, name & title from Application hem 1..3.) has been reviewed by me and is accurate and complete to the best of my knowledge, 1 understand that if all required parts of this application are not completedand that if all required supporting documentation and attachments are not included, this application package is subjectto being returned as incomplete. 1 understand that any discharge of 'Wastewater from this non - discharge system to surface. waters or the land will result in an immediate enforcement action that mayinclude civil penalties, injunctive relief, and or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this .permit be violated, 1 also understand that if alt required parts of this application package are not completed and that if ,a11 required supporting infonnation and atta.chments are not included, this application package will be returned to. me as incomplete, NOTE In accordance with General Statutes 143-21.5.6A. and 14,3-215.61.A, any .person who knowingly makes any false statement, representation., or certification in any application package shall he guilty of a Class 2 misdemeanor, which ma:y include a fine not to exceed $10,000 as well as civil penalties up to S25,000 per violation Signature: Date: 7* 9 6 / FORM: FTA 04-16 Page 5 of 5 WSACC August 5, 2019 Mr. Michael Legg City Manager City of Kannapolis 401 Laureate Way Kannapolis, NC 28081 Subject: Flow Acceptance Request —City of Kannapolis Wayne Brothers Public Sewer Extension — Phase 2 WATER & SEWER. AUTHORITY OF CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.1783 • 704. www.wsaoe.org Dear Mr. Legg: This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on July 26, 2019. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled Wayne Brothers Public Sewer Extension — Phase 2, located near the proposed Concrescere Parkway. The referenced project will serve a future commercial development, and WSACC understands that no flow allocation is currently requested. WSACC understands that City of Kannapolis will prepare flow acceptance request(s) in the future for the actual flow associated with this development. The wastewater generated by this project will be conveyed through a proposed gravity system, through the existing gravity system, and then enter WSACC's system at the existing 36-inch Rocky River Interceptor. WSACC acknowledges it has or will have capacity for wastewater from the proposed development based on information provided by The Isaacs Group (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines. The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 -- 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. If construction of this project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated. This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy. Please note that the final commitment to service to provide wastewater treatment services shall occur upon application for a building perntit for the project and when system development fees are paid pursuant to §162A, Article 8. If you have any questions, please call me at (704) 788-4164, extension 104. Sincerely, . Thomas Hahn, PE Utility Systems Engineer cc: Misty Tutt, PE/Kannapolis Wilmer Melton/Kannapolis Christopher Isaacs, PE/The Isaacs Group Michael Wilson/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC Tront nnl-thlo/Wg A rr WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: DCity of Concord City of Kannapolis 11111 own ofllarrisburg 11111 owu of Mt. :Pleasant. EICharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: --Project # Wayne Brothers" Public Seliver. Extension Phase 2 Description: The lot ovided engineering plans and specaticattons, as prepared and sealed by Christctpher Isaacs, NCPE--, wilt] The Isaacs Group, for the wastev,tater collection system extension consisting of approximately 2„451 linear 'et of Stinch sanitary sewer with 14 manholes and other appurtenances to serve future part:els along proposed Conorescere Parkway in Cabarrus County, vvith a wastewater discharge of 0 GPD (there are no proposed uses or buildings at this time). *Number of Lots: ate: OR *Number of Units: *IMust be included in request. Where will the new line be connected: Directly into a WSACC Interceptor • Into the :Jurisdiction's existing collection system • Into a private line Describe the location of the tie-in line to which the new sewer line will connect: 'The proposed 8 -inch sanitary sewer extension will tie-in to the existing 8 -inch sanitary .sewer system, which extends to the 36 -inch PVC material WSACC Rocky River Interceptor Which WSACC interceptor will the flow ultimately be discharged into: 36-inch PVC WSACC Rocky River Interceptor What is the WSACC manhole number that the flow will be discharged into? Node, 011126 What is the quantity of flow that will be discharged? 0 GPD How type: El Domestic 11 Commercial 100 Industrial Name of wastewater treatment facility (WWTH receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure: If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will. be required before flow acceptance will be provided. Mark Lomax at 704-786-.1783, ext: 231, must be notified 48 hours in advance ofa conncctntn into a WS:ACC interceptor: WSACC will inspect connection before, during, and after completion. ▪ construction is not started within two (2) year front the date of approval of the flow acceptancejor ihk project, the approval is rescinded and a second request and approval be required for the project. WSACC USE ONLY: DATE: LIJ Current sewer model shows an Interceptor as being surcharged south of the manhole in question. Eli Approved EII Current Server Model shows: Not Approved State of North Carolina Department of Environment and Natural Resources Ater Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) AUSDICTION USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: OCity of Concord C ty of Kannapolis Town of Harrisburg Lil 1.1 of Mt. Pleasant OCharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title—Proect Wayne Brothers Public Sewer Extension - Phase 2 : j# Description: The provided engineering plans find specifications, as prepared and sealed by Cr )ophe acs NUE, .with The .1saacs Group, for the wastewater .collection system extension consisting at approximate1y 2,451 linear feel of &inch sanitary sewer with 14 - manhoies and other appurtenances to serve future parcels along proposed Cancrescere Parkway in Cahouet; County, with a wastewater discharge of 0 GPO ighere are no proposed uses or buildings at this firne1„ What is the quantity of flow that will be discharged? 0 (;PD Flow type: El Domestic of /0 Commercial ioo El Industrial Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. Pump Station (Name or Number) Finn Capacity * MCI) (A) Design Average Daily Flow ** (rioter° MGD rif) Approx. Current Average Daily now row) (C) (D) Obligated, Not Yet Total Current Flow Trihmary Daily Flow Pius Obligated .Flow MGD MGD (EY-JA-D) Available Capacity*"* MIGD *The Firm Capacity of any pump station is defined as the maximum pumped Flow that can be achieved with the largest pump taken nut of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor and less than 15. *'"A .Plariniog Assessment Addendum shall be attached for each pump station located between the project connection point and the WWII' Nvhere Available Capacityis< 0, Section It Jurisdiction's Certification Statement: I, Wilmer Melton, ILL Director of Public Works, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment ‘Vhere applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section I plus all attached planning assessment addendums for which, to the best of iny knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. 7- d 6 ? jurisdiction's Signing Official Signature Date Re:vision Dte:, 08/09/13 KAN NAP .Pt.fl7iic Works August 19, 2019 North Carolina Department of Environmental Quality Mooresville Regional Office - Water Quality Section 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Wayne Brothers' Sewer Extension — Phase 2 Sewer Extension City of Kannapolis — Cabarrus County Dear Sir or Madam: Please find attached for your review and approval the original and one copy of the permit application, a digital copy (pdfs) on CD of the permit application and plans, along with the $480 processing fee for the above referenced project, Also enclosed is the flow acceptance letter from the Water & Sewer Authority of Cabarrus County stating they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant, The proposed extension will connect to the existing Kannapolis sewer system which extends to the WSACC Rocky River Interceptor. This wastewater collection system will serve the proposed Wayne Brothers' Corporate Headquarters, Concrescere Parkway Phase II & Finisher's Building project. The Water and Sewer Authority of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of Environmental Management. This project will be installed in accordance with these Standard Specifications. Please call me at 704-920-4219 if you have any questions. Sincerely, S 4..K.tS 4(}1. LAURE \l 7()4-92(.)-42()() WIN \A=KANNAPOI,ISNC G)V