Loading...
HomeMy WebLinkAboutWQ0039811_Regional Office Historical File Pre 2018ROY COOPER Governor MICHAEL, S, REGAN s'eArrva.:y LINDA CULPEPPER ;maim arector Vat1rkegutirces March 13, 2018 Mr. Wilmer Melton, 111, Director of Public Works City of Kannapolis 401 Laureate Way, Kannapolis, North Carolina 28081 Subject: Permit No. WQ00398 11 City of Kannapolis The Village at Kellswater Bridge - Phase 3 Wastewater Collection System Extension Permit Cabarrus County Dear Mr, Melton: In accordance with your application received February 16, 2018, and additional information received March 13, 2018, we are -forwarding herewith Permit No, WQ003981 I dated March 13, 2018 to the City of Kannapolis (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and. shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition ILI: This permit shall not be automatically transferable; a request must be made and approved. Condition HA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 1.5A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215,6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. if any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State .0e North Caaviinal'Eny irorunental Quality l'Water .Resources Water Quality Kegional Operations Mooresville Regional Office 610 East Center Avenue, Suite 301 %I ootesville, North Carolina 28115 704 663 1699 If you need additional i s r ation concerning this att r, please contact i ri Tuvia at ('704) 235-2190 via e-mail at ori.tuviaz'"a.,tncd nrw ov. incerely, oa gndby' \---A14CC681AF27425.:. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ ,c Patrick 9lurphy (P.E.) ( py) Mooresville Regional Office Files Water Resources Central Files PERCS (-copy) Page 2of8 STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapoliis Cabarrus County for the construction and operation of approximately 7,467 linear feet of -inch gravity sewer, 721. linear feet of 13-inch gravity sewer to serve 202 4 Bedroom homes as part of the Village at Kellswater Bridge - Phase 3 Project , and the discharge of 96,960 Gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received February 16, 2018, and additional information received March 13, 2018, and in conformity" with 15A NCAC 2T: the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable: and other supporting, data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit, This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein, DocuSigned by: by W. Corey Basinger, Regional Supevisot Water Quality Regional Operations Section Division of Water Resources, 'NCDFQ By authority of the Environmental Management Commission Permit Number: Permit Issued: WQ0039811 March 13, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET City of Kannapolis is hereby authorized to: Construct, and then operate uponcertilication the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCA.0 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special. Conditions identified below. I. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 96,960 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304 (b)] 11. STANDARD CONDITIONS 1. This permit. is not transferable.. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a namechange of the. Permittee, a 'formalpermit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A. NCAC 02T.0104; G.S 14.3-215.1.(d3)] This permit shall become voidable unless the wastewater collection facilities are constructed in. accordance with the conditions of this permit; I 5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02101101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .01101 4. The wastewater collection facilities shall be properly maintained and operated at all times, The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by I5A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)1; Page 4 of 8 a, The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 clays per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses 'shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0.506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.. IC, h. A Grease Control Program is in place as follows: , For public owned collection systems, the Grease Control Programshall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections ofthe grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall. be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map., which shall be maintained for the life of the system. 5, The Permittee shall report by telephone to a water resources staff member. at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mailmessages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall tile a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond controL [G.S, 143- 215.1C(al) 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. (15A 'NCAC: 02T.0108(b)1 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, If the permit is issued to 'a private entity with an Operational Agreement, then a copy of the. Articles of Incorporation, Declarations/Covenants/Restrictions„ and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification. is one where the 'form. is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One cop -y of the project construction record drawings (plan & profile views of sewer lines & force tn.ains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, tnaterial changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy,. wet well storage, surge protection, detention time in the wet well, and force main., ability to flush low points in force mains with a pump c)cle, and downstream sewer capacity analysis. If a portable 'power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel. timeframes., shall be provided. c.. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the .space provided, or in written. summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the numberltype of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria. should be requested and approved during the permitting. process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [1.5A NC AC 02T .Q1-16] 8. Gravity sewers installed greater than ten percent below the minimum. required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected, If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of -the wastewater collection facilities. [15A NCAC 02T ,01.16] .10, Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 21; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000. as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-21.56.A through §143-215,6C, construction of additional or replacement wastewater collection.facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, [15A NCAC 021 .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Pennittee from complying with any and all statutes, :rules, regulations, or ordinances that may he imposed by the Division any other Federal. State, or. Local government agencies which have jurisdiction or obtaining other permits which maybe required. by the Division or any other Federal, State, of Local government agencies. [G.S. 143-2 l5,1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF KANNAPLIS PERMIT #: W90039811 PROJECT: THE VILLAGE AT KELLSWATER BRIDGE - PHASE 3 ISSUE DATE: MARCH 13, 201.8 This project shall not be considered complete nor allowed to operate in accordance with standard. Condition 7 of this permit until the Division has received this Certification and ail required supporting documentation, ft should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof, Printed Name. Title Signature. Date ENGINEER'SCERTIFCATION 1.,. as a d.uly registered Professional ElEineer in the State of North Carolina, having been authorized to observe (E1 periodically., LI weekly, Li full time) the construction of the. project nam.e and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Perrnining of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials, North Carolina Professional Engineer's Seal w/signature & date: Final El Partial (Include description) Certification Comment Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 Per rnrtNumber 0039811 Central Files: APS S'UP 1 t3/2018 Permit Tracking Shp Prcarrarn Category Non -discharge Permit Type, Gravity Sewer Extension, Pump Stations, Pressure Se r Extensions Primary Reviewer oti.tuv'ia Per,r tted Flow Fa tray Facility Name The Village at Kenn Location Address Owner ater de - Phase Status Project Type Active New Project Version Permit 0la si ication 100 lndivirdual Permit Contact A.ffiiaatlrar Niajcarr`l incr Region MinorMooresville Etaunty Sactlity Contact .Affiliattot Cabarrus Owner er Name City rat annapcti /Events Owner Type Government - f lunicipat f'lwner Atfiiaati Wilmer Melton I I I MR PUBLIC WORKS PO 1199 tannapclrs NC 280 Oriel Issue .App Rey if 201 2/1612018 R + mate 1 Awe Subdivision Wastewater crillection attali ved )raft In tee Scheduled issuance Puts isNotice Requested "'Received Events, .Additional information requested Additional rnton•naticn re red Exprratlan 212011 ft Wa beady Name ex Number Current Class Subbase Division of Wter Resources State of North Carolina Department of Environmental Quality Division of Water Resources NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: " o be compkted by DWR) All Items must be corn let d or the plication will be returned I. APPLICANT INFORMATION: I. Applicant's name: City of Karmapolis (company, municipality, HOA, utility, etc.) 2. Applicant type: D lndividual Corporation El General Partnership El Privately -Owned Public Utility Federal E State/County Municipal Ej Other 3. Signature authority's name: Wilmer Melton, III per 15A NCAC 02T .0106(b) Title: Director of Public Works 4, Applicant's mailing address: 401 Laurate Way City: Kanna oiis State: NC Zip: 28081-0005 5. Applicant's contact infomiation: Phone number: (704) 920-4200 Email Address: wmeitonkannapolisnc.gov IL PROJECT INFORMATION: I. Project name: The Village at Kellswater Bridge - Phase 3 2, Application/Project status: Ei Proposed (New Permit) D Existing Pernik/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cabarrus 4. Approximate Coordinates (Decimal Degrees): Latitude: 35,4668Longitude: -80.6604' 5. Parcel ID (if applicable): 04-051-0001,00 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: PatrickMik. oby License Number: 036836 Finn: R. Joe Harris & Associates, Inc. Mailing address: 127 Ben Casey Drive, Suite 101 City: Fort Mill State: SC Zip: 29708- Phone number: (803) 802-1799 Email Address: pmurphy(a,doeharris,com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I,. Facility Name: Rocky .River Regional Wastewater Treatment Plant Permit Number: NC0036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Narne(s): FORM: ETA 04-1.6 Page VI. .16.ENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? 0 Yes EjNo ZNA 2. Ifthe Applicant is a De/ .per of lots to be sold, has a Developer's Operational Aoree'' ) 'FORM: DE),±) been attached? El Yes ON° N/A 3. If the Applicant is a llonteijfqwrty4,-)vfneys: Association, has an41.)perational I:Noisernent (f ogl)./1,11(A) been attached? El Yes ON° NIA. 4. Origin of wastewater: (check all that apply): Residential Owned E Residential Leased rj School I preschool / day care 1:1 Food and drink facilities Businesses / offices / factories Ej Retail (stores, centers, malls) Ej Retail with food preparation/service Medical / dental / veterinary 11 Church ' Nursing Home 5. Nature of wastewater : 100 0 Domestic/Commercial ?,4) Commercial o Industrial (See i 5A N(.2A,( 021 ,003(2,0)) ) is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 021 .0114(0? El Yes. >,1fes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type 02.1-.0 I 14( I)) Residential Daily Design Flow *'11 480 gal du (4 bedrooms) gal' gall gall gal/ Ell Car Wash El Hotel andlor Motels LJ Swimming Pool ./Clubhouse Ej Swimming Pool Filter Backwash El Other (Explain in Attachment) Yes LJNo No No. of Units Total GPD a See 15A NCAC 0'21 .011411„)),, R-11, Le)( / and (0(2 for caveats to wastewater design flow rates (i.e., minitnum flow per dwelling: proposed unknown non-residential development uses: public access facilities located near high public use areas: and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table ) 5AK,:,\C_OZITPIA41 shall be determined using available flow data, water using fixtures, occupancy or operation patterns. and other measured data. 8. Wastewater generated by project: 96„960 GPD (per c:A( 021/.0114) Do not include future flows or previously permitted allocations If perniirted flow is zero, indicate why: I] Pump Station or Gravity Sewer LY here flow will be permitted in subsequent permits that connect to this line Ej Flow has already been allocated in Permit Number: LJ Rehabilitation or replacement of existing sewer with no new flow expected E Other (Explain): FORM: ETA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 L Summarize gravity sewer to be permitted: IDC(Gravity Sewers): Size (inches) Length (feet) Material 5,987 PVC 8 1,480 DIP 15 721 PVC > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section III contains information related to minimum slopes for gravity sewer(s) > Oversizing lines to meet illirliMUM slope requirement is not allowed and a violation of the MDC VIIL PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Purnp Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4, Operational point(s) of the purnp(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): O Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: Ej Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02'T .0305(h)(1)(C) or EI Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station, ▪ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX, .SETBACKS & SEPARATIONS — (02B .0200 & 1.5A NCA,C 02T .0305(1)): •1. Does the project comply with all separations found in 15A NCAC 02T ,0305(t) & (g) 15A NCAC 02T.0305 containsminimum se.arations that shall be rovided for se Setback Parameter* Storm sewers and other utilities not listed below (vertical) Yes E] No Separation Required 24 inches Water mains (vertical -water over sewer including in benched trenches) Water mains (horizontal) Reclaimed water lines (vertical - reclaimed over sewer) Reclaimed water lines (horizontal - reclaimed over sewer) *Any private or public water supply source, including any wells, WS-I waters of Class 1 or Class II impounded reservoirs used as a source of drinkin, water **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HOW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation Any basement Top slope of embankment or cuts of 2 feet or more vertical height 18 inches 10 feet 18 inches 2 feet 100 feet 10 feet 5 feet 10 feet Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) 10 feet 5 feet 10 feet 36 inches • 15A 'NCAC 02T,0305(g) contains alternatives where separations in 02T.Q305(f) cannot be achieved, • **Stream classifications can be identified using the Division's NC Surface Water Classifications webpa.e ),;>. If noncompliance with 02T.0305(1) or (g). see Section .X of this, application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes No • See the Division's draft separation requirements for situations where separation cannot be meet 'lie' No variance is required if the alternative design criteria specified is utilized in design and construction As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0700? This would include Trout Buffered Streams per 15,A NCAC 2B.0202 Yes LiNo 4. Does the project comply with an individual 404 Permit or any 401 Certifications? 4 Yes El No • Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters Information can be obtained from the 401 & Buffer Permitting Branch 5, Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? Yes LI No Per 15A NCAC 021-..0105[0(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stonnwater management plans, etc.). 6, Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T,0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. Yes I4No • lf yes, include an attachment with details for each line, including (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: F lA 04-16 Page 4 of 5 X. CEKTIFICA"EIONS: 1. Does the submitted system comply with 1„5,A NCAC, 02:1: the Nlinimum. Design Criteria fOr the Permitting of Punip Stations and Force Minns (latest version), and the Gravity Sewer Minimum Design Criteria latest version) as applicable? Yes .0 No If No, complete and submit the Variancei,,Mternatie Design Request application (VADC 10-14) and supporting documents for review, Approval of the request_ is required prior to submittal of the Fast Track Application and supporting documents Professional Engineer's Certification: at-c' Amp (Professlonal tIngineerls name from Application Rein 111.1„) attest that this application for has been reviewed by me and is accurate.complete and consistent with the intonation supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared m accordance with the applicable regulations, Gravity Sewer Nfinimum Design Criteria for Gravity Sewers (latest, version), and the 'Minimum Design Criteria for he Fast -Track Permitting of Pump 'unions and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package. inclusion of these materials under my signature and seal signifies: that I have reviewed this material and have judged it to he consistent with the proposed design., NOTE -- In accordance with General Statutes 143-215.,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty,' of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penaltie,s up to S25,000 per violation.; North Carolina Professional Engineer's seal, signature., and date: 0-0A CARd' • q-P•FESS./0 ) .44,„ SEAL C-4168 3 Applicant's Certification per 15A NCA( 02T ,0106(b): 1.tA) Di(01411t: RA. Woe - (Signature Authority's name 8z. title from Application Item 1.3.) attest that this application for has been, reviewed by me and is accurate and complete to the best of my knowledge, I understand that if alt required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being, returned as :incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land wfll result in an immediate enforcement action that may include civil penalties, injunctive retie and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated, also understand that if all required parts of tins application pac,kage are not completed and that if all required supporting information, and attachments are not included., this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215,6A and 143-215,613, any person who knowingly makes any false, statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, Which may include a Inc not to exceed SI 0,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of .5 wuwb x erarni .4. US Topo SANw dlm5' LIS GRANt.LII %T71, `AK«i 8:+`A WNUtk' $.ERfEC KAN?d AT€kLIS, !sir de PARKWAY KA N Public \X''o 'Jo February 13 r> North Carolina Department of n nenta.l Quality Mooresville Regional Office - Water Quality Section 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Kellsater Phase 3 Sewer Extension Cite of Kannapolis -- Cabarrus County Dear Sir or Madam: Please find attached for your re iee and approval the original and one copy of t'..... application along with the $480 processing fee for the above referenced project, Also enclosed is the flow acceptance letter from the Water &. Sewer Authority of Cabarrus County ta.tin they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The proposed extension will cc nnect to the existing Kannapolis sewer system which extends to the WSACC Irish Buffalo Creek Interceptor. This wastewater collection system will serve the proposed Kellswater Phase 3 Subdivision. The Water and Sewer Authority of Cabarrus County Standard Specifications for. Wastewater Collections Systems were approved by your office and are being :in intained by the Division of Environmental Management. This project will be installed. in accordat ce ith these Standard Specifications. Please call me at 704-920-4219 if you have any questions. Sincer LAU t 704- 920-4200 h.,\NNAr . .APOIISNC.0 WSACC r. Michael B. Legg City Manager City of Kannapolis 401 Laureate Way Kannapolis, NC 28081 March 5, 2018 'Ma Subject: Flow Acceptance Request — City of Kannapolis Kellswater Phase 3 (Additional Flow) Dear Mr. ,ogg: WATER & SEWER AUTHORITY OF CABARRLIS COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.17E33 • 704.795.1564 Fax www.wsacc.org This is an approval of the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on February 28, 2018. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed project entitled Kellswater Phase 3, located off Kannapolis Parkway. The referenced project will serve 202 single-family homes, with a projected wastewater flow of 96,960 gallons per day (gpd). WSACC previously accepted 72,720 gpd associated with this project with a letter dated January 29, 2018. With this letter, WSACC is providing acceptance of the remaining 24,240 gpd to account for the difference in requested flow associated with the increase from 3-bedroom homes to 4-bedroom homes. The wastewater generated by this project will be conveyed through the proposed 15-inch line, through an existing gravity system, and then enter WSACC's system at the existing 42-inch Irish Buffalo Creek Interceptor. WSACC agrees to accept wastewater from the proposed development based on information provided by R. Joe Harris & Associates, Inc. (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines, The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. It should be noted that the list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. if construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated. If you have any questions, please call me at (704) 786-1783, extension 228. Sincerely, a a J. Thomas Hahn, PE Utility Systems Engineer cc: Misty Lippard, PE/Kannapolis Wihner Mettork/Kannapotis Patrick L. Murphy, PE/R. Joe Harris & Associates, Inc, Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PFJWSACC Mark Lomax/WSACC Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) (WSACC USE ONLY) Kellswater Phase 3 (Additional Fiow) Section I. Name of wastewater treatment facility (WWII) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NOE036269 E Muddy Creek Wastewater Treatment Facility — Permit 4Na/081621 WWTP facility's permitted flow., MGD 26.500 'Estimated obli ated flow not yet tributary to the WWTP, MGD 1.907 WWTP facility's actual avg. daily flow, MGD Total flow for this specific request, MGD Total actual and obligated flows to the facility, MGD Percent of permitted flow used 7.040 (64.30% of permit) 0.024 18.971 71,59% Section II. Pump stationsalong the route from the jurisdiction's connection point to the WWTP. Pump Station (Name or Number) RRRWWTP MPS 55.440 Fftrn Capacity * MGD , ,, . (B) (C) (D) = (B+C) , 1, ign Average Daily Flow ** i Approx.. Current Obligated, Not Yet Total Current Flow (Firrnip() Average Daily Mow Tributary Daily Bow Plus Obi ad Flow MGD , : NfGD MGD 22. 76 111,040 .478 0.438 * The Firm Capacity of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of servic-e, **Design Average Daily Flow is the firm capacity of the pump station divider' by a peaking factor not less than d1.5„ ***A Planning Assessa7ent Addendum shall be attached for each pump station located behreen the project connection point and the WWTP where Available Capacity is<U. E).1,A-D) Available Capacgy*** MGD 0.698 Section III. WSACC Certification Statement: 1, J. Thomas Hahn, PE, certify that, to the best of ray knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data This certification applies to those items listed above in Section I and Section II plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. au— 's Signing Official Signature at Revisioi) Date 08/09/13 DivisioResourcesn State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 411140 (WSACC USE ONLY) Kellswater Phase 3 Section I. Name of wastewater treatment facility (WWIT) receiving wastewater: 17,q Rocky River Wastewater Treatment. Facility — Permit NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621. WWTP facility's 26.500 Estimated obligated flow not Let tributary to the WWTP, MGD 1.585 WWTP facility's actual avg. daily flow, MGD 17.040 (64.30% of permit) Total flow for this specific request, MGD 0.073 Total actual and obligated flows to the facility, MGD 18.698 Percent of permitted flow used 70.56% Section 11, Pump stations along the route from the Ju risdietion's connection point to the WWTP. Pump Station (Name. or Number) (A) FM11. Capacity * Design Average Daily Flow ** MGD (Film/pi) (13) Apprr CUT] era Average Daily Flow MCI) (C) (D) = (F3-dC) Obligated, Not Yet Total Current Flow Tributary Daily Flow Plus Obligated Flow MCl/ MCI) (E)=(.A-D) Available Capacity*** MCI) RRRWWTP MPS 55.440 22.176 11.040 0.391 11.4 0.745 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service* **Design Average Daily Flow is. the firm capacity of the pump station divided by a peaking factor not less than •**A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity 9<0. Section III. WSACC Certification Statement: I, J. Thomas Hahn., PE, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route 'from the. connection to the interceptor to the receiving wastewater treatment facility; and the flow frOin this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available. data. This certification applies to those items listed above in Section 1 and Section II plu.s, all attached planning assessment addendum for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. CC 's Signing Official Signature at Revisi.on Date: 08/09/13 R Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 41/14) (WSACC USE ONLY) Kellswater Phase 3 (Additional Flow) Section I. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility - Permit #NC0036269 Muddy Creek Wastewater Treatment Facility - Permit #NC0081621 WWTP facility's permitted flow, MGD Estimated obli::ted flow not yet tributary to the WWTP, MGD 26.500 1.907 WWTP facility's actual avg. daily flow, MGD 17,040 (64.30% of_permit) Total flow for this specific request, MGD Total actual and obligated flows to the faciflty, MGD Percent of permitted flow used 0 024 18.971 71,59°A Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. (A) Pump Station Firm Capacity * ign Average Daily Flow " Approx. Current (Name or Number) MGD (FirrniPt) Average Daily Flow MGD MGD RRRWWTP MPS 55.440 r22.176 (13) .040 (CI (D) (E)-(A-D) Obligated. Not Yet Tool Current Flow Available Tributary Daily Flow t9naObligated Flaw Caty MCI) MG» 0.438 MGD .478 10.698 • The Firm Capacity of any pump station is defined as the matimumn pumped flow that call tie achieved with tire largest pump taken out of service, **Design Average Daily blow fa the firm capacity of the pump station divided by a peaking factor nut kla than ***A Planning Assessarient Addendum shall be attached for each pump station located between the project connectionpoint and the WWTP where Ay e Coped. < Section III. WSACC Certification Statement: 1, J. Thomas Han1, certify that, to the best of my knowledge„ the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section I and Section 11 plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Revision Date: MOM 3 WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CARARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: 9- 2 - 2 0 EICity of Concord City of Kannapolis Town ofHdrrihiirg Ell FON471 of Mt. Pleasant ElCharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title.: FW-3 -Project # 211 6 Description: The en„gincerin2:TLans and specifications, asdirepiired and sealed by Patrick Murphy, 1N'C.PF, with R-Joe Flan -is, for the wastewater collection system extension consisting of ap_groximately_5 987 linear feet of 8 inch PVC; 1,480 linear feet of 8-inch DIP and 721 linear feet of 15-inch PVC sanitary sewer with 50 manholes and othermpuitenances to serve 202 sin,* fun -hints located on site with a -wastewater discharge of 72,720 GPD. ^-n *Number of Lots: 202 OR *Number of Units: *Must be included in request. Where will the new line be connected: 1111 Directly into a -WSACC interceptor • into the Jurisdiction's existing collection system EIIInto a private line Describe the location of the tie-in line .to which the new sewer line will connect: The proposed .15-inch sanitary sewer extension will tie-in to the existing 15-inchsanitary sewer system, whichextends to the 42- inch RCP \VSACC Irish Buffalo Creek Interceptor. Which WSA.CC Interceptor will the flow ultimately be discharged into: 42- inch RCP WSACC Irish Buffalo Creek Jutercep What is the WSACC manhole number that the flow will he discharged into? Node011254 What is the quantity of flow that will be discharged? 7 2 , 720 GPD How type: Domestic 1 0 % ri Com rti ercia LI Industrial Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility -Permit #NC0036269 I-1 Muddy Creek Wastewater Treatment Facility - Permit #NC0081621 Design drawings ofnew lines will be submitted to WSA CC with the. request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor., detailed drawings including specificationof the ta be required before flow acceptance will be provided. Mark 1 at 704-786-1783, ext, 231, must be notified-48 hours in advance of a connection into a WS.ACC interceptor. WSACC will inspect connection before, during, and aftercompletion, If construction is not started within two (2) yearfrom the date of approval of the flo acceptance for this project, the approval is rescinded and a second request and approval will be required for the project, rSACC USE ONLY: DATE: Current sewer model shows an Interceptor as being suicliargc.lsuuth ufthe manhole in question. Approved Not .Approved Current Sewer Model shows: Divistart o ‘Va e- • State of North Carolina Department of Environment and Natural.Resources Division of 'Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FT-SE-Al/14) (JURISDICTION I'SE ONLY) jurisdiction Requesting Flow Acceptance for Collection System: ElCity of:Concord EICaty oi K.annapolis —own of Harriiibarg EIT own of Alti Pleasant EIC.harlotte Mecklenburg Utilities Project 'Fide, Description, iind Number of LotsfUnit: Project if it le: Kw---3 •—Project# 2 11 Descriptioniddir ert,2jrle,Jim2."Larts and specification. ai-3pwtred and suilx-d by Patrick Murphy. IN'CP E., with R-Jbe fbr the wastewatr e1n t,c1T1eNtoyot,1. cpy.isjstirrag.f.:5.1p•pl.o:Ontalely 0i r (INA ol 8-in.di PVC: 1,4SO lineu feet. of S-inch 1)IPi,Ln1:7211inear fee): of:154nch l'V( irt \\-er with 50 trunhol es ;:,tnd other app•urtenances to serve 20'2 single. faalily It located on site with a wastewakT•ciischarge of '72,720 What is the quantity of flow that will be discharged? 72,720 (,PI) Flow type: II Domestic E Commercial Section 1 - Ldst the Jurisdiction's pump stations located be :Cell the piplee Interceptor connection point. Stanfill Firm (.'apacity (Mini e• or Numb(r) :MUD (A) Dc5izul1 ILiFlom '" (Tr' win.'p1) MGD Industrial 117Cti011 point aol ) (C) AWN% Clan CHI Obligumif Net YeT Average Daily Flov, 1ilm.u.ary M(i) MGO , 1 I 1 y i y i 1.' • , . (D)- rare) • attAin - • • i-s Total Curium Flay, Available, Plus Oblimited Floss Camielty."" MGD \15l) Tbe Flan Capacity of any pomp station is defined as thg aginioni pumped flu N ahlt ca be milks with the largest pump taken ollt str, I"Design A erage Doily 1 the tarril capacity of the pump station dis hied by a peaking factor not less than 2.5. ""A Planning Asspasmont Addenilom shalt l attached for •nach purup station located brto gen the projent connection point and the WW1 V h harkA‘iiilable Capacity is <0, Section 11 Jurisdiction's Ccrli tic1tn Statement: 1. Wilmer Melton. HE Director of Public WOrkS, certify that, to the best at knowledge, the addition. of the volume of wastewater to be permitted in this project has been evaluated .alcitig the route to .the receiving \VSA.CC interceptor; and the flow from this project is nt t. itnticipated to cilliSe any capacity related sanitary sewer oviertiovvs or overburden on any do‘mstreatn pump station 1 oute to the receiving \\ A( interceptor normal circumstances, given the iinplementation of the planned irnprovernents ident dial in the plamiing assessment where applicable This analysis has been performed in t.iccordance with local. established policies i;tricl procedures using the best available data, This certification applies to those items listed above in Section I plus all autiched planning assessmeni addenclums for which., to the hest of Inv knodedge, win not adversely affect the downstream sev%rripacity. Signature of this tons indicates acceptance of this wastowitter now. —7•.° );• c?, 3 - Si,grring i(t1 Signct Dale kort Date os:D9/13 R JOE HARRIS & ASSOCIATES INC PH. (803) 802-1799 127 BEN CASEY DR STE 101 FORT MILL, SC 29708 PAY TO THE NCDEQ ORDER OF Four Hundred Eight NCDEQ South State Bank S©utNSt ate Bank c€am 4574 67•9Bf53Z ('IiELK {9i1GA 12/22/2017 •*480 00 and 0 011 0 0****, *. ******************** ********* ******* a; *********************+ *** pis********fk* MEMO tAkbe i i Kellswater Phase 3 DO A Division of Water R State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION t)=Ic..IL Application Numb : liki n (to be completed by DWR) All Items must be completed or the application will be returned L APPLICANT INFORMATION: I. Applicant's name: City of Kannapolis (company, municipality, HOA, utility, etc.) 2. Applicant type: 0 Indivdua1 0 Corporation 0 General Partnership EI Privately -Owned Public Utility Federal El State/County Municipal Other 3. Signature authority's name: Wilmer Melton, III per 15A NCAC 02T .0106(b) Title: Director of Public Works 4. Applicant's mailing address: 401 Laureate Way City: Kannapolis, State: NC Zip: 28081-00 5 5. Applicant's contact information: Phone number: (704) 920-4200 Email Address: wineltonAkannapolisnc.gov II. PROJECT INFORMATION: 1. Project name: The V'llage at Kellswater Bridge - Phase 3 2_ApplicationfProject status: Proposed (New Permit) Ej Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cabarrus 4. Approximate Coordinates (Decimal Degrees): Latitude: 354668' Longitude: -80,6604' 5. Parcel ID (if applicable): 04-051-0001,00 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Patrick Murphy License Number: 036836 Firm: R. Joe Harris & Associates, Inc. Mailing address: 127 Ben Casey Drive, Suite 101 City: Fort Mill State: SC Zip: 29708- Phone number. (803) 802-1799 Email Address: pmurnhy@rioeharrisx,om IV. WASTEWATER TREATMENT FACILITY (WWTF) LNFORMATION: 1. Facility Name: Rocky River Regional Wastewater Treatment_Plant Permit Number: NC0036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQ IREMENTS If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Nece, Yes ENo NIA Developer of lots to he sold, has a Devel Qer's Operational Agreenlent °FURM: DEA 7 been attached? Yes ONo N/A E lontelProperty Owners' Association, has an Operational Agreement LOR [: lIOr\j been attached? Yes LNo ®N/A If the Applicant is a If the Applicant is a Origin of wastewater: (c Residential Owned EJ Residential Leased �] School / preschool / day care El Food and drink facilities © Businesses °" offices / factories eck all tl apply). Retail (stores, centers, malls) LI Retail with food preparation!serviiiice rjj Medical dental veterinary facilities Q Church Nursing Home Nature of wastewater a 100 % Dorn.estic/Commerc % Commercial % Industrial (Sec 15A NCAC 02T 0103(20)) -3Is there a Pretreatment Program in effect'' 6, Has a flow reduction been approved under 15A NCAC 02T .01 l4(1)? If yes, provide a copy of flow reduction approval letter 7, Summarize wastewater generated by project' Establishment Type (see 02T.01140 Residential Daily Design Flow y been attached? LI Car Wash � Hotel and/or Motels Q Swimming Pool ..'Clubhouse J Swimming Pool/Filter Backwash Other (Explain in Attachment) Yes Yes Z No 480 gal'day (4 bedrooms) gal/ gal/ No Flow 96,960 GPD GPD GPI) GPD 'Iota" ( 96,960 GPD a See ISANC.A.0 o2 Ol 14(h),anelle)(12J for caveats to wastewater design flow rates (i.e., minimum flow per dwelling, proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south. or east of the Atlantic Intracoastal. Waterway to be used as vacation rentals as defined in G.S. 42A-4), b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCACO2T.rt 14] shall be determined using available Clow data, water using fixtures, occupancy or operation patterns, and other measured data, 8. Wastewater generated by project: 96,960 GPD (per 15,A N («' 02 I , 0 t 14_) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: LI Pump Station or Gravity Sewer where flow will be permitted in subsegatent permits ha._ connect to this line Flow has already been allocated in Permit. Number: El Rehabilitation or replacement of existing sewer with no new flow expected LI Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII: GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02'1' .0305 & (Gravity Sewers): 1. Summarize gravity sewer to be permitted: A Section 11 & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria A Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the PvIDC Vill PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Main* COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2, Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3, Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDII) 5. Summarize the force main to be permitted (for this Pump Station): 6. Power reliability in accordance with 15A NCAC 02T .0305(11)(1): Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T .0305(h)(1)(B): A Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day A Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(I)(C) Or El Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): A It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. A If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORIvit FTA 0446 Page 3 of 5 IX. .- SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 021 .0305(f) & 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewer Storm Setback Parameter* ot listedbelow (vertical) Water mains (verticalwater over er ncluding in benched eriches) Water mains (horizontal) Reclaimed water lines (vertica ed over Reclaimed water lines (horizontal - reclanned over er Yes El No ysterns: Separation Required 24 inches 18 inches 0 e ches **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water o ide elevation)and wetlands (see item IX.2) Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation y basement Top slope ofembankmentorutsof2 feet or ore vertical hei Drainage systems and interce tor drain Any swimming pools Final earth rade (vertical) 2 feet 100 feet 0 fee 0 feet 5 feet 0 feet 10 feet 5 feet 10 feet 36 inches A 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. A **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage If noncompliance with 02T.0305(0 or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) A See the Division's draft separation requirements for situations where separation cannot be meet A- No variance is required if the alternative design criteria specified is utilized in design and construction A As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? A This would include Trout Buffered Streams per 15A NCAC 2B4O202 Yes Ej No 4, Does the project comply with an individual 404 Permit or any 401 Certifications? Yes No A Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters A Information can be obtained from the 401 & Buffer Permitt 0 Branch 5. Does project comply with 15A NCAC 02T,0105(c)(6) (additional permitsice ications)? Yes El No Per I5A NCAC 02T.0105(c)(61, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc,). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. EJ Yes 1No A If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the perrnittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. .. CERTIFICATIONS: Does the submitted system comply with :15A. NC AL 02.T, the Minimum Design Criteria for the Permitting, of Puiup Stations and Force Maui s (latest version.), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes El No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents ui.red prior to, submittal of the Fast Track Appltcation and surrnortin for review. Approval of there documents. 2. Professional EngineersCertification: I, 4'4(1: 14V (Professtonal Engineer's name from Application Item 111.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calc-ulations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minitnu.m Design Criteria for the Fast -Track Permitting of Pump Stations and .Force Mains (latest version), Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. attest that this applicatio.n. for 'NOTE -- In accordance with General Statutes 143-21.5.6A and 143-21.5,6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well. as civil penalties up to $25,000 per violation.; North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0106(b): I, V) i OK, rkJLLJ (- i"" 4:' attest that this application for (Signature Authority's name & title from Application Item I.3,) has been reviewed by me and is accurate and complete to the best of my Icnowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete.. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, andlor criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated, I also understand that if all required parts of this application package are not completed and that if all required supporting information. and attachments are not included, this application package will be returned to me as incomplete.. NOTE -- in accordance with General Statutes 143-21,5.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification. in any application package shall be guilty of a Class 2 misdemeanor, which tnay include a fine not to ex.ceed. $10,000 as well as civil penalties up to $25,000 per violation. Signature: ) Date: I ?i'18 FORM: FTA 04-16 Page .5 of 5 u... saCC. 'r KTMENT OrGe + AE.Sunv%v US Tope KANN,4,FO + QUAD4 ' GLE NORTH 4i R01,91A a .awRare€ lEt a€s X,q.,NNAZOUS, NC za+a P OUS KANN Public Works February North Carolina Department of Environmental Quality Mooresville Regional. Office - Water Quality Section 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Re: Kellswater Phase 3 Sewer Extension. City of K annapolis — Cabarrus County Dear Sir or Madam: Please find attached for your review and approval the original and one copy of the permit application along with the $480 processing fee for the above referenced project. Also enclosed is the flow acceptance letter from the Water & Sewer Authority of Cabarrus County staging they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The proposed extension will connect to the existing Kaimapolis sewer system which extends to the WSACC Irish Buffalo Creek Interceptor. This wastewater collection system will serve the proposed Kellswater Phase 3 Subdivision. The Water and Sewer Authority of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of Environmental Management. This project will be installed in accordance with these Standard Specifications. Please call me at 704-920-4219 if you have any questions. Sincerely, ORKS 401 LAUREATE WAY KANNALOLIS, N.C. 28C81. 704-920-4200 WWW,KANNAPOLt5N(C.GOV WSACC March 5, 2018- llil6llll2 4.II�ItarP lc Mr. Michael B. Legg City Manager City of Kannapolis 401 Laureate Way Kannapolis, NC 28081 Subject: Flow Acceptance Request — City of Kannapolis Kellswater Phase 3 (Additional Flow) WATER & SEWER AUTHoRm OF CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.1783 • 704,795,1564 Fax www.wsacc.org Dear Mr. Legg: This is an approval of the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on February 28, 2018. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed project entitled Keilswater Phase 3, located off Kannapolis Parkway. The referenced project will serve 202 single-family homes, with a projected wastewater flow of 96,960 gallons per day (gpd). WSACC previously accepted 72,720 gpd associated with this project with a letter dated January 29, 2018. With this letter, WSACC is providing acceptance of the remaining 24,240 gpd to account for the difference in requested flow associated with the increase from 3-bedroom homes to 4-bedroom homes. The wastewater generated by this project will be conveyed through the proposed 1 5-inch line, through an existing gravity system, and then enter WSACC's system at the existing 42-inch Irish Buffalo Creek Interceptor. WSACC agrees to accept wastewater from the proposed development based on information provided by R. Joe Harris & Associates, Inc. (Civil Engineer for the project) using North Carolina. Department of Environmental Quality (NCDEQ) wastewater flow guidelines. The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. It should be noted that the list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. If construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated. If you have any questions, please all the at 4 786-1783, extension 228. Sincerr�elly, f f Thomas Hahn, PE ty Systems Engineer cc: Misty Lippard, Pp/Kannapolis Wilmer Melton/Kannapolis Patrick L. Murphy, PE/R, Joe Harris & Associates, Inc. Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC Division of Water Resou State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) (WSACC USE ONLY) Kellswater Phase 3 Section I.. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 ri Muddy Creek Wastewater Treatment Facility — Permit #INC0081621. WWTP facility's permitted flow, MGD Estimated obligated flow not yet tributary to the WWTP, WWTP facility's actual avg. daily flow, MGD Total flow for this s cifie request,MGD 26,500 1.585 17.040 (64.30% of permit) 0.073 Total actual and obligated flows to the facility, IVIGD Percent of permitted flow used 1.8.698 70.56$1) Section IL Pump stations along the route from the Jurisdiction's connection point to the WWTP. Pump Station (Name or Number) Firm Capacity * MGD (A) (B) (C) Desigu Average Daily Flow *' Approx, Current Obhaed, blYg Yet (Firiwpf) Average Daily Flow Tributary Daily Flow MGD MGD MGD RRRWWTP MPS (E)=FA-D,) Available Capacity"" 55.440 22.176 .040 0.39 (D) (B i-C) 'f(tal Current Flow Plus Obligated Flow MCI) 11.431 The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. **Design Average Daily How is the firm capacity of the punip station divided by a peaking, factor not less than 2.5, ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capac Section HT WSACC Certification Statement: 1, J. Thomas Hahn, PE, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section II plus all attached planning assessment addendums for which; to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. 's Signing QUicial Signature RevisionDa - 08/09/13 Division State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) (WSACC USE ONLY) Kellswater Phase 3 (Additional Flow Section I. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit "C0081621 WWTP facility's permitted flow, MGD 26,500 Estimated obligated flow not yet tributaryto the WWTP, MGD 1.907 WWTP facility's actual ayg_. Oily flow, MGD Total flow for this specific request, MGD 17.040 (64,30% of pennit 11024 Total actual and obligated flows to the faci1ity MGD 18 971 Percent of permitted flow used 71.59% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Pump Station (Name or Number) (A) (B) esp Average Deily Flow "' Approx. CILLIC111 (Firm/pf) Average Daily FII.AV MGT) MGD (C) Obligated, Not Yet Tributary Daily now MGD 0.438 (D) =, (13-C) Total Current Flow Plus Obligated Flow MGD 11.478 e Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service, .'Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2-1, "*A Planning Assessment Addendum shall be attacked rer each pump station located between the project connection p ntdtle WWTPwhcre AvailableCapaci. (E)AD) Available Capacity''" MGD I 0.698 Section 111. WSACC Certification Statement: 1, J, Thomas Hahn, PE, certify that, to the best (Amy knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section II plus all attached planning assessment addendums for which, to the best ofmy knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. CC's Signing Official Signature at Rev Dare: 9/1 WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: 2019-2.5—7 EiCity of Concord EICity of K.armapolis Elfow.n ofHarrisburg OWil of Mt. Pleasant EjCharlotte Mecklenburg Utilities Project Title, Description, and Number ofLots/Unit: Project Title: Ki473HProject # 2116 .Description: The engineering plans ankspecitications, as prepared and sealed by PatrickMurph:y,•,. NCPE, with R-Joe Harris, ,for the wastewaterastewathr etionsystem extension consisting of p._pproximately 5 987 linear feet of 8.-ineh PVCL 1,480 linear feet of 8-4rich DIP and 721 linear feet of 15-ineh PVC sanitary sewer with 50 manholes and other appurtenances to ,serve 202.single family lots. located on site with a wastewater discharge of 72,720 GPD, *Number of Lots: 2 02. OR *Number of Units: *Must be included in request. Where. will the new line be connected: • Directly into a WSACC Interceptor 111 into the Jurisdiction's existing collection system O Into a private line. Describe the location of the tie-in line to which the new sewer line will connect: Ilikroposed 15-inch sanitary sewer extension will tie-in to the existing 15-inch .sailitary sewerystern which extends to the 42- inch 'RCP WSACC Irish Buffalo Creek Interceptor. Which 'WSACC Interceptor will the flow ultimately be discharged into: 42- inch RCP WSACC: Irish "Buffalo Creek Interceptor What is the WSACC manhole :number that the flow will be discharged into? Node° 1254 What is the quantity of flow that will be discharged? "7 2 , 7 2. 0 GPD Flow type: 1 Domestic ;IQ Coin mercia I Name of wastewater treatment facility (WWTF') receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 .uddy Creek Wastewater Treatment Facility Permit #NCOOS1621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastruc ture. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required 'before flow acceptance will be provided. Mark Lomax at '704-786-1783, ext. 231, must be notified 4,8 hours in advance of a. connection into a 'WSACC interceptor. WSACC will inspect connection before, during, and after completion, Ifcons1ruction is not started within two (2)vcarfrom the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. ▪ Industrial SACC USE ONLY: DATE: Current sewer model shows an interceptor as being surcharged south of the manhole in question. Approved LI Not Approved Current Sewer Model shows: Diviston I lll' rtirces (JURISDICTION USE ONL State of North. Carolina Department of En%ironlne t and Natural Resources of Water Resources Acceptance for Sewer l tension Permit Applications (FT S E 4) ‘Jurisdiction Requesting Flow Acceptance for Collections, —jCity of Concord its oCKan:napo'lis f ;rk)F41a offlarrisburg [jTclvvrt fyf n. Fie,,sanf ❑Charlotte Mecklenburg t ti Project Title, Description, and Nuurnber of.hots/f.3nit Project Title: 1c4-Tf-ProiectN 2 11 6 Description: The engineer ng plansand tidy af7cati+`rr<<m. s cared and seated h\Warrick MinThvmmNCPE. with R-Joe 1-1 systern extension consisting_ ot; approsimateely 5.937 it a teak c 8—inch. PVC::.1480 linearfeetof $inch DIP nd 721 linear sanifat • sewer 4tiitb. 0 na .nhol=es and other appurtenances tta serve ?02 single family lots located or, site with a wastewater dischafro What is the quantity of flow that will he discharged? 72,720 GPD Flow„ type: III Domestic I. a lion 1 I ist f eptt Pomp Station or bomber) Contlltcrciat ❑ Industrial lie Jurisdiction's l tlrnp stations located between the project calm eca'on t. eetion point. *The Firm Cal of any pump s *''tiowiprt Average Daily Flow is the Firm eapac '"A Planning Assessment Addendum shall be, \IGD r)es;t;r ,.eaecage t)aily Reis (C) Net Yet Ty Daily Flow \IGD 'rota! Ceure Plus Obligated Flow \1Gt,l d as the maxim unt pumped flow that c«ta loe achieved with the largest pump taken out of.aerwi p station divided by a peandts, factor not less than 2,5_ be project ccnnee-ion point and the WW P where Available Capacity b 4 tl. °3© n n Fl. Jurisdiction's Cert 'leltyon, IIw Director(ti Public Vorks, certify that, to the best o, dge, the addition of the 'volume permitted in this project has been evaluated along the route to the l°eceivirig WSACC interceptor; and the anticipated t.o cause any capacity related sanitary sewer overflows or overburden on any deA apump station hert in route to the receiving AI SACC interceptor normal circumstances,.. given the impiementatiotl c fthe planned. improvements identified in the planning assessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items fisted above in Section 1 plus all attached planning assessment addendu,rns for «hicti, to the best of my knowied.ge, will not adversely affect the downstream sewer, capacit '. Signature of this form indicates acceptance of this \israstewater flow, Date 5 i0F1 Date: a sio'y,'t FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF K.ANN.APLIS PERMIT #: WQ00398.I. I PROJECT: THE VILLAGE AT KELLSWATER. BRIDGE - PHASE 3 ISSUE DATE: MARCH 13. 201.8 This projectshall not be considered complete nor allowedto operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt, Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address notedin the page footer. Any wastewater flow made tributary to the wastewater collection system exten.sion prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by th.e Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PER\I1TTFE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements,. the Professional Engineer below has provided applicable designIconstruction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. ,2±C, Of' Of- 6- Printed Name, Title ' ac_ 07).r :Ls Signatuie Date ENGINEER'S CERTIFICATION 1, Patrick Murphy , as a duly registered Professional Eneer in the State of North Carolina. having been authorized to observe (1=] periodically, E weekly, LJ fulltime) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; I5.A NCAC 02T.; the Division of Water Resources(Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as. applicable; .the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal wisignature & date: LI Final Li Partial (include description) Certification includes MH6-MH7, MH7-MH8, MH8-MH9, MH9-MH10, MH10-MH11, MH11-MH12, MH12-MH13, MH13-MH26, MH26-MH27, MH27-MH28. MH28-MH49, MH#29-MH#16, MH#29-MH#30, MH#30-MH#31 MHA631-MH#32, MH#32 MH#33, MH#33-MH#34, MH#49 MH#50, MH#50-MH#51 & MH#51-MH#52. Certification Comments/Qualifiers (attach if necessary): 1st SEAL 07: C-4168 G110.'1,e' L tP3' NC DWR — Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Avenue, Suite 301, MY6resvil e, NC 28115 Phone: (704) 663-1699 FAX: (704)-633-6040 FAST TRACK SEWER ENGINEERING CERTIFICATION FiEGEIVEr ;DENRIDWR PERMITTEE: CITY OF KANNAPLIS PERMIT #: WQ00398 I I PROJECT: THE VILLAGE AT KELLSWATER BRIDGE - ISSUE DATE: MARCH 13, 2018 , SE .3 MOORESVILLE REGIONAL Of-TICE This project: shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and ail required supporting documentation. It, should be submitted in a manner that documents the Di vision's receipt. Send the required documentation. to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page tooter. Any wastewater flow made tributary to the wastewater collection system extension)11 o of this Certification shall be considereda violation of the permit and shall subject the Per1uItee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Pcrmittec, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction .information to the Permittec, and the .Permittee is prepared to operate & maintain the wastewater collection system .permitted herein or portions thereof, tfM Meit-611 Printed Name, Title Signature ENGINEER'S CERTIFICATION Date 1, Patrick Murphy_ , as a duty registered Professional Engineer in the State of North Cat ol la, having been authorized to observe (lc periodically,L weekly, hill time) the construction of the project name and location as referenced. above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed, to be built within substantial compliance of this permit; 5A NCAC 02T: the Division of Water Resources' (Division) Gravity Sewer .MiniMUITI Design Criteria adopted February 1.2, 1996, as applicable; the Division's. Minimum Design Criteria air the Fast -Track Permitting of Pump Stations and Force Mains adopted tune 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal wisignature & date: El Final 50 Partial (include description) Certification includes MI-1#1-M1-1#2, MH#2-MH#2A, MH#2A-MH#3, MH#3-MH#4, MH#4-MH#5, MH#4-MH#29, MH#5-MH#6 & MH#5-MH#21 Certification Comments/Qualifiers ccessarij: ,0i1W11011/0 AR ESS. /04/1„ SEAL 73: C-4168 6.) :',Th1140C. oniatiof CAR 1 SEAL 1;:\ 0346'4136 GrNee;•• L. 0 NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 pPrir- ' FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF 'KANNAPLIS PERMIT #: WQ003981. 1 PROJECT: THE VILLAGE, AT KELLSWATER BRIDGE - PHASE 3 ISSUE DATE: MARCH 13„ 2018 This project ,shall not be considered complete nor allowed to operate in accordance with standard. Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the .wastewater collection .ystern extension prior to cornptetion of this Certification shall be considered a violation of the permit and shall subject. the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a .final certification is received by the Division.. .A ,Final Certificationshall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PER\IITTEE'S ICTtON I, the undersigned agent for thc Permittec, hereby state that this project has been constructed pursuant to the applicable standards & requirements,. the Professional Engineer below has provided applicable design construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted here' or portions thereof. 6(4_, Name, Title r . uNic • e? Signature Date ENGINEER'S CERTIFICATION 1, Patrick Murphy , as a. duly registered Professional Enuineer in the State of North Carolina, having been authorized to observe (a periodically, E weekly, u full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my a.bilities, due care and diligence was used in the observation of the construction such that the constniction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February, 12, 1996. as applicable; the Division's Minimum Design Criteria for the Fast -Track Perlin:611g of Pump Stations and Force Mains adopted June 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal \AL/signature & date: [1] Final E] Partial (include description) Certification includes MH#13-MH#14, MH#10-MH#22 MH#22-MH#23 & MH#23-MH#24 Certification Comments/Qualifiers (attach if n,ccessa. fl g'Ig. It gg * go 4 g* g ** 4 VIX 1 :2" $14111' SEAL 0: C-4168 g7, 4 4' 4 74 GDENMEMR WQ R OS NI 0 0 fl (IRV LLE: REM ON A L. OM NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 North Carolina Department of Environmental Quality Mooresville Regional Office ®dater Quality Section 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Fie: The Village At Kellswater BridgePhase C011 Partial Certification City of Kannapolis Cabarrus County Dear Sir orMadam: atwatr System Et. Please find attached a copy of the Partial Record Drawings and Partial East Tracy Engineering Certification for the lellwater Bridge Phase 3 Permit No. (111 Please call me at 04® C --421 g if you have any otiestions. Sincerely, r f: .t FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF KANNAPLIS PERMIT #: WQ003981 I PROJECT: THE VILLAGE AT KELLSWATER BRIDGE - PHASE 3 ISSUE DATE: MARCH 13, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, it should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Perniittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that. this project has been constructed pursuant the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permitter is prepared to operate & maintain the. wastewater collection system permitted herein or portions thereof Printed Name, Ti ENGINEER'S CERTIIICATION Date I, Patrick Murphy , as a duly registered Professional Eil:6,7ineer in the State of North Carolina, having been authorized to observe (17 periodically, El weekly, full time) the construction of the project name and location as referenced above for the above Pei -mince hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design. Criteria adopted 'February 1.2„ 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations, and Force Mains adopted Tune 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: El Final LI Partial (include description) Certification Comments/Qualifiers (attach if necessary): ,,4,14!,e tID A".• .1' e i,°110fitt`i° NC DWR - Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 Jan ary .2020 North Carolina C apartrn nt of Environmental Quality Nilooresville Regional Office -'water Quality Section 610 East Center Avenue, Suite 30 Mooresville, forth Carolina 28115 The Village At Kellswater' ridge _ Phase 3 astewater Systern E t, WQ0039811 Final Certification City of Kannapolis Cabarrus County my Dear Sir or Madam: Please fired attached a copy of the Final Renard Drawings and Final Fast Track' Engineering Certification for the Kellswater Bridge Phase 3 Permit No, WQ0039811. Please call me at 04-0-41 if you have any questions.