Loading...
HomeMy WebLinkAbout20071134 Ver 5_Inspection_20121219CIE- NCDENR North Carolina Department of Environment and Natural Reso Division of Water Quality - Beverly Eaves Perdue Charles Waklid, P E Governor Director December 19, 2012 Mr J J Swain, Jr , P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Dee Freeman f Secretary Subject Inspection -US Highway 19 DWQ Project 07-113_4 — Individual Certification No 3706 TIP Nos R -2519A Yancey County Dear Mr Swain On December 12, 2012, I inspected the construction project on the US Highway 19 Project in Yancey County Construction continues along most of the project with heavy grading, utility construction and culvert installation It's important that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also, please refer to the attached inspection report for any specific items noted during the inspections If you have questions, please call me at 828 - 296 -4500 Sincerely, Michael R Parker Environmental Senior Specialist Attachment cc Randy McKinney, PE Roger Bryan, Division 13, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office US 19 R -2519A December 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 -8211 Phone 828 296-45001 FAX 828 299 7043 Internet www ncwaterouality oro An Equal Opportunity 1 AfTrmabve Action Employer NorthCarohna V/7t1 /ml/h/ s A Wetland Inspection Report Project Num 20071134 Version 6 Status Issued Project Name NCDOT- US 19 /US 19E R -2518 A, R -2518 B & Project Type Road /Highway Widening R -2519A County Madison Region Asheville Location NCDOT- US 19 /US 19E R -2518 A, R -2518 B & R -2519A Latitude Longitude SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 12/12/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person On -Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Facility compliance Status E Compliant Program Area 401 (includes isolated /non -404) Question Areas 0 Permit (401 WQC) Title Phone n Not Compliant Inspection Summary Inspected R -2519A from Jacks Creek Road to the end of project Heavy constructton continues throughout most of the project with pipe and culvert construction Remove sediment from energy dissipator basin at Station 257 +40 Continue to maintain sediment and erosion control measures Seed and mulch areas as required Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit'? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment Phone 828- 296 -4500 00Q0 ■000 ■000 Page 1